Skip to content

[Slides] Energy storage & batteries · Covers 2026-10-23 – 2026-11-0215 slides

Energy Storage & Batteries Brief · Oct 23–Nov 2, 2026

Generated with Divrite · Completed Nov 2, 2026

Get “Energy storage & batteries” by email · Free · No account needed · Unsubscribe anytime

Original prompt
Write the "Energy Storage & Batteries" hot-topic report covering 2026-10-23 to 2026-11-02. Scope: track cell and energy-storage-system (ESS) prices, shipments and capacity of the major manufacturers, progress of new technologies such as sodium-ion and solid-state batteries, and tenders for large energy-storage projects. Sections: 1. Two-week highlights 2. Price trends 3. Manufacturer shipments and capacity 4. Technology roadmap progress 5. Projects and tenders 6. Overseas markets. Length: 12–15 slides. Key sources: industry price data, company announcements, research institutes, tender platforms, industry media. Cite every key number; leave out anything without a reliable source. Answer in English.

Opens Divrite with this prompt filled in — change it to your own topic before you start.

All 15 slides

  1. Slide 1: Energy Storage & Batteries Brief|Oct 23–Nov 2, 2026

    Slide 1

    Energy Storage & Batteries Brief|Oct 23–Nov 2, 2026

    Speaker notes

    Welcome to the Divrite Research hot-topics brief on energy storage and batteries, covering October 23 to November 2, 2026. It asks one question: how much of lithium's next leg down actually reached cells, orders and projects? First, the contents.

    Slide text

    Energy Storage & Batteries Brief

    Divrite Research · Hot Topics · Issue for Oct 23–Nov 2, 2026

    PUBLISHED BY

    Divrite Research

    DATE

    Oct 23–Nov 2, 2026

  2. Slide 2: Contents

    Slide 2

    Contents

    Speaker notes

    The brief has five parts: overview, prices, makers, technology, and projects and action. We start with what moved, and end with China's draft rules and key dates. First, the overview.

    Slide text

    Energy Storage & Batteries Brief

    5 Chapters

    / 15

    Overview

    Lithium fell again while cells and orders lagged

    Prices

    Spot lithium, slow cells and award values

    Makers

    Q3 volume up, margins split, orders mostly intent

    Technology

    Samples and 2027 plans, gains in format

    Projects and action

    China draft rules, overseas stages and key dates

  3. Slide 3: Overview|Cells lag lithium; most orders are still intent

    Slide 3

    Overview|Cells lag lithium; most orders are still intent

    Speaker notes

    Lithium made its next leg down in this window, but cells and orders lagged. Per SMM, spot was about RMB 90,000 per tonne on 30 October, roughly 38% below the Q3 average of RMB 147,500. Benchmark's only cell series fell just 1.8% in Q3. Lingwu is unsigned, one GWh is signed against 5 GWh of MoUs, and India has 5.3 GWh operating against 185 GWh under development. Name the price type and check the stage before you quote, buy or forecast. Next, the lithium spot detail.

    Slide text

    Overview Cells lag lithium; most orders are still intent

    Source: SMM; Benchmark; ESS News; ESN; Energy-Storage.news (CEA); report chapters 2–8

    Two clocks, one chain

    ~38% below

    SMM lithium carbonate spot, about RMB 90,000/t on 30 Oct, vs the RMB 147,500/t Q3 average

    −1.8% Q3

    314 Ah EXW China cell, to US$54.21/kWh (Benchmark; publication date not stated, context)

    Consequence

    Spot and cell quotes run on different clocks and announced volume is not operating capacity, so pass-through to cells is not yet observable.

    What moved in the window

    Lithium made its next leg down, but the only cell series barely moved

    Lingwu, the one GWh-scale China award, is unsigned

    Q3 results split the makers; new chemistries stayed at sample or plan stage

    Orders and projects were mostly intent; China's spot-market rules are a draft

    Announced is not operating

    RMB 0.91 /Wh

    Lingwu, 1 GW / 4 GWh at CNY 3.64 billion, implied; contract unsigned

    1 vs 5 GWh

    One signed order against MoUs

    5.3 vs 185 GWh

    India: operating against under development

    Next step

    Name the price type and check the stage before you quote, buy or forecast.

    Where the numbers come from
    【本页依据】 ① SMM lithium carbonate spot fell to about RMB 90,000/t on 30 Oct, roughly 38% below the RMB 147,500/t Q3 average —— [SMM Lithium Carbonate Daily Review] On October 28, spot lithium carbonate prices rose by 700 yuan/mt, while futures retreated after a rapid rise, falling on increased volume and open interest. - Shanghai Metals Market (SMM) · news.metal.com · https://news.metal.com/en/newscontent/104183966-smm-lithium-carbonate-… Analysis] Lithium Battery Q3 2026 Profit Divergence - Shanghai Metals Market (SMM) · news.metal.com · https://news.metal.com/en/newscontent/104189818-smm-analysis-lithium-b… ② 314 Ah EXW China cell fell 1.8% in Q3 to US$54.21/kWh —— Battery Cell Price Review Q3 2026 · source.benchmarkminerals.com · https://source.benchmarkminerals.com/article/lithium-cost-pass-through… ③ Lingwu 1 GW / 4 GWh at CNY 3.64 billion, implied RMB 0.91/Wh, contract unsigned —— Consortium wins $535 million tender for 4 GWh storage project in China - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/29/consortium-wins-535-million-tender… ④ One signed order (1 GWh) against 5 GWh of MoUs —— Samsung SDI and Alpha Omega Power Sign 1 GWh Supply Agreement for U.S.-Made Energy Storage · finance.yahoo.com · https://finance.yahoo.com/energy/articles/samsung-sdi-alpha-omega-powe… Energy Solution · lgensol.com · https://www.lgensol.com/mobile/en/company/newsroom-detail?seq=8792;3GW…,钠电储能规模化出海 · catl.com · https://www.catl.com/news/10337.html ⑤ India has 5.3 GWh operating against 185 GWh under development —— India has 5.3GWh of operational BESS, with 185GWh under development, CEA official says · energy-storage.news · https://www.energy-storage.news/india-has-5-3gwh-of-operational-bess-w… ⑥ NDRC spot-market rules are a draft, comments to 2026-11-18, proposed start 2027-01-01 —— 中国储能网 -国家政策 - 一文读懂新版《电力现货市场基本规则(公开征求意见稿)》 } · escn.com.cn · https://www.escn.com.cn/news/show-2334611.html;深度 | 2027年施行,新版电力现货市场基本规则对长时储能的影响_结算_收益_电价 · sohu.com · https://www.sohu.com/a/1093685672_120253635
  4. Slide 4: Lithium · Spot|Spot hit RMB 90,000/t, 38% under the Q3 average

    Slide 4

    Lithium · Spot|Spot hit RMB 90,000/t, 38% under the Q3 average

    Speaker notes

    Lithium spot is the starting point, and the level to work with is about RMB 90,000 per tonne, not the three-session bounce. SMM's battery-grade carbonate average bounced for three sessions to RMB 100,050 per tonne on 28 October, then fell to about RMB 90,000 on 30 October. The bounce was technical: LC2701 hit 101,520, fell to 92,320 and closed at 93,300. UBS, in an estimate dated 26 October, sees no rebound before year-end, with cost support near RMB 80,000. Treat that as an estimated floor, not a guaranteed one. Next, what reached cells.

    Slide text

    Lithium · Spot

    Spot hit RMB 90,000/t, 38% under the Q3 average

    Source: SMM; Market Index (UBS, Canaccord, Macquarie)

    Bounce, then slide: SMM's battery-grade carbonate spot average bounced for three sessions to RMB 100,050/t on 28 October (window, daily spot), then fell to about RMB 90,000/t on 30 October (approximate), about 38% under the Q3 average of RMB 147,500/t (Q2: 171,900; context).

    Carbonate spot (RMB/t)

    Context

    Window

    Approx.

    Read: Q3 average is −14.2% QoQ vs Q2 (context)

    The bounce was technical

    LC2701 hit 101,520, fell to 92,320 and closed at 93,300 on 28 October

    UBS (estimate, 26 October) sees no rebound before year-end

    Floor and demand (estimates)

    Cost support near RMB 80,000/t (UBS); Macquarie sees next support near 80,000

    Canaccord (23 October): 2026 demand +29% to 1.8 Mt LCE

    What it means: SMM reads bears in control, with upside likely capped. The 2 November level is not in the material, so 90,000 is approximate.

    Next step

    Work with about RMB 90,000/t as the spot level and treat RMB 80,000/t as an estimated floor, not a guaranteed one.

    Where the numbers come from
    【本页依据】 ① SMM carbonate spot average bounced to RMB 100,050/t on 28 October —— [SMM Lithium Carbonate Daily Review] On October 28, spot lithium carbonate prices rose by 700 yuan/mt, while futures retreated after a rapid rise, falling on increased volume and open interest. - Shanghai Metals Market (SMM) · news.metal.com · https://news.metal.com/en/newscontent/104183966-smm-lithium-carbonate-… ② Spot fell to about RMB 90,000/t on 30 October, about 38% under the Q3 average of RMB 147,500/t (Q2: 171,900; -14.2% QoQ) —— [SMM Analysis] Lithium Battery Q3 2026 Profit Divergence - Shanghai Metals Market (SMM) · news.metal.com · https://news.metal.com/en/newscontent/104189818-smm-analysis-lithium-b… ③ LC2701 hit 101,520, fell to 92,320 and closed at 93,300 on 28 October —— Same as ① ④ Spot averages were RMB 98,300 on 26 October and 99,350 on 27 October —— [SMM Lithium Carbonate Daily Review] On October 26, spot lithium carbonate stopped falling and rebounded, ending its previous consecutive decline. - Shanghai Metals Market (SMM) · news.metal.com · https://news.metal.com/en/newscontent/104179171-smm-lithium-carbonate-… Lithium Carbonate Daily Review] Lithium Carbonate Futures and Spot Prices Rebound in Tandem on October 27 - Shanghai Metals Market (SMM) · news.metal.com · https://news.metal.com/newscontent/104181671-smm-lithium-carbonate-dai… ⑤ UBS (estimate, 26 October) sees no rebound before year-end, with cost support near RMB 80,000/t —— Lithium's BESS hangover: UBS sees no rebound before year end · marketindex.com.au · https://www.marketindex.com.au/news/lithiums-bess-hangover-ubs-sees-no… ⑥ Canaccord (23 October) sees 2026 demand +29% to 1.8 Mt LCE; Macquarie sees next support near 80,000 —— ASX lithium crash: PLS, LTR, MIN face third bear market in a decade · marketindex.com.au · https://www.marketindex.com.au/news/asx-lithium-crash-pls-ltr-min-face…
  5. Slide 5: Cell prices|Plan for lagged cuts; cells fell just 1.8% in Q3

    Slide 5

    Cell prices|Plan for lagged cuts; cells fell just 1.8% in Q3

    Speaker notes

    Cells have barely followed lithium, so plan for lagged cuts. Benchmark's Q3 review, with no publication date stated, puts the EXW China 314 Ah cell at US$54.21 per kWh in September. Against end-June, that is down 1.8%, with CIF Europe down 2.2% and CIF North America down 4.1%. Carbonate fell 14.2% over the same quarter, so cells moved about one-eighth as much. Benchmark expects lagged cuts in Q4. A 2% battery consumption tax has applied since 1 September 2026, so fix tax treatment, delivery basis and lithium-linked terms in every quote. Next, award prices.

    Slide text

    Cell prices

    Plan for lagged cuts; cells fell just 1.8% in Q3

    Source: Benchmark; SMM

    Benchmark Q3 review

    EXW China 314 Ah: US$54.21/kWh in September; CIF North America about 20% above (review date not stated, context)

    No in-window quotes: the material holds no InfoLink or SMM cell prints

    Q3 vs end-June

    −1.8%

    EXW China

    −2.2%

    CIF Europe

    −4.1%

    CIF North America

    2% battery consumption tax in effect since 1 September 2026

    What it means

    Spot is about 38% below its Q3 average while cells sit at September's low; how much of October's fall reaches cells is not yet observable. Benchmark expects lagged cuts in Q4.

    Next step

    Plan for lagged cuts, watch new InfoLink and SMM weekly prints, and fix tax treatment, delivery basis and lithium-linked terms in every quote.

    Where the numbers come from
    【本页依据】 ① Benchmark EXW China 314 Ah cell at US$54.21/kWh in September, CIF North America about 20% above —— Battery Cell Price Review Q3 2026 · source.benchmarkminerals.com · https://source.benchmarkminerals.com/article/lithium-cost-pass-through… ② Q3 vs end-June: EXW China -1.8%, CIF Europe -2.2%, CIF North America -4.1% —— Same as ① ③ 2% battery consumption tax in effect since 1 September 2026 —— Same as ① ④ Carbonate fell 14.2% QoQ against cells -1.8%; H1 gross margins: mining up to 74%, salt processing 27-42%, cathode 5-14%, cells 12-23% —— [SMM Analysis] Lithium Battery Q3 2026 Profit Divergence - Shanghai Metals Market (SMM) · news.metal.com · https://news.metal.com/en/newscontent/104189818-smm-analysis-lithium-b… Cell Price Review Q3 2026 · source.benchmarkminerals.com · https://source.benchmarkminerals.com/article/lithium-cost-pass-through… ⑤ Spot is about 38% below its Q3 average while cells sit at September's low —— Same as ④ ⑥ Benchmark expects lagged cuts in Q4 —— Same as ①
  6. Slide 6: Award prices|Check scope before comparing RMB 0.91/Wh

    Slide 6

    Award prices|Check scope before comparing RMB 0.91/Wh

    Speaker notes

    With no in-window system quote, award values are the live signal, but check scope before comparing them. On 26 October, Wuhan Tianyuan's consortium confirmed the Lingwu award: 1 GW and 4 GWh at CNY 3.64 billion, contract not signed. That is RMB 0.91 per Wh, but it covers equipment, design, civil works and a 330 kV substation, not batteries alone. Ningdong, signed earlier in October, works out at RMB 0.65 per Wh. Ratios are indicative only, because months and scopes differ. The 6% export VAT rebate is cancelled from 1 January 2027, a quoting risk. Next, the makers.

    Slide text

    Award prices

    Check scope before comparing RMB 0.91/Wh

    Source: ESS News; TD Research; Intertek CEA via ESS News; reprints of MoF/STA Announcement No. 2 of 2026

    What the award covers

    With no in-window system quote, award values are the live signal.

    Lingwu award notice confirmed on 2026-10-26 by Wuhan Tianyuan's consortium: 1 GW / 4 GWh at CNY 3.64 bn, contract not signed

    The price covers equipment, design, civil works and a 330 kV substation, not batteries alone

    Award arithmetic

    Lingwu: CNY 3.64 bn ÷ 4,000 MWh = RMB 0.91/Wh (US$0.134/Wh), 1.57× TD Research's July 4-hour system average (context)

    Ningdong: CNY 195 m for 75 MW / 300 MWh, signed earlier in October (context)

    Export rebate and US outlook

    Export VAT rebate is 6% and is cancelled from 2027-01-01

    Intertek CEA (estimate, 2026-10-27): US DC-block prices −15% to −30% by 2030 against above −40% in import markets

    Implied price (RMB/Wh)

    Read: ratios are indicative only; months and scopes differ

    What it means: the ratios are indicative only because months and scopes differ, and Intertek expects the rebate removal to soften cost deflation into 2027.

    Next step

    Check scope and month before comparing any award with a system price, and treat the 2027-01-01 rebate end as a quoting risk.

    Where the numbers come from
    【本页依据】 ① Lingwu award notice confirmed on 2026-10-26: 1 GW / 4 GWh at CNY 3.64 bn, contract not signed —— Consortium wins $535 million tender for 4 GWh storage project in China - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/29/consortium-wins-535-million-tender… ② The Lingwu price covers equipment, design, civil works and a 330 kV substation, not batteries alone —— Same as ① ③ CNY 3.64 bn / 4,000 MWh = RMB 0.91/Wh (US$0.134/Wh), 1.57x TD Research's July 4-hour system average of RMB 0.58/Wh —— Consortium wins $535 million tender for 4 GWh storage project in China - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/29/consortium-wins-535-million-tender… Research | July 2026 China BESS Tender Awards Review: 26.0 GWh Awarded; 4-Hour EPC/PC Price Reaches RMB 0.54/Wh · linkedin.com · https://www.linkedin.com/pulse/td-research-july-2026-china-bess-tender… ④ Ningdong CNY 195 m for 75 MW / 300 MWh = RMB 0.65/Wh, signed earlier in October —— Same as ① ⑤ Export VAT rebate is 6% and is cancelled from 2027-01-01 —— Industry Express | Cancellation of VAT Export Tax Rebates for Photovoltaic and Other Products - TKG China · tkgelectric.com · https://www.tkgelectric.com/nd.jsp?id=114;China's 2026 Export Tax Rebate Cut: Which Chemicals Changed · qiboch.com · https://www.qiboch.com?m=home&c=View&a=index&aid=344 ⑥ Intertek CEA (estimate, 2026-10-27): US DC-block prices -15% to -30% by 2030 against above -40% in import markets —— US battery storage prices could fall up to 30% by 2030 - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/27/us-battery-storage-prices-could-fa…
  7. Slide 7: Makers · Q3|Volume is up, but margins split the field

    Slide 7

    Makers · Q3|Volume is up, but margins split the field

    Speaker notes

    Q3 volume is up, but margins split the field. Company-reported figures, as relayed: EVE shipped 67.52 GWh of storage cells over nine months, and says Q4 is fully booked. Samsung SDI reports an operating margin of about 8.7%. Sungrow's Q3 gross margin was 29.45% against 38.62% in Q2, a 9.17-point drop. EVE's operating cash flow fell 65.37% to RMB 1.698 billion, and BYD's Q3 net profit missed broker expectations by 12% to 23%, an estimate comparison. So compare Q3 results on gross margin and cash flow, not shipments alone. Next, orders.

    Slide text

    Makers · Q3

    Volume is up, but margins split the field

    Source: ESN; ESS News; Cailian via moomoo; TipRanks; Electrek; BigGo

    Company-reported Q3, as relayed

    Samsung SDI: revenue KRW 4.69 tn, operating profit KRW 407.8 bn (margin ≈8.7%); 60 GWh of ESS orders over nine months

    EVE: 67.52 GWh storage-cell shipments over nine months; Q3 implied 23.06 GWh, about 4.2% below Q2 (derived)

    Sungrow: nine-month net profit RMB 6.599 bn, down

    BYD: Q3 net profit RMB 10.02 bn, 12% to 23% below broker expectations (estimate comparison)

    Consequence: top-tier capacity is full, since EVE says Q4 is fully booked (company says, 2026-10-23), while margin pressure shows at integrator level

    Next step: compare Q3 results on gross margin and cash flow, not on shipments alone

    Q3 growth by maker, % YoY

    Reading: Sungrow alone is down on revenue and profit

    29.45%

    Sungrow Q3 gross margin, against 38.62% in Q2: a 9.17-point drop

    20.69%

    CATL Q3 gross margin, from 23.15% (context from the previous issue)

    ≈18.0%

    BYD Q3 gross margin (media-derived)

    −65.37%

    EVE operating cash flow, to RMB 1.698 bn

    Where the numbers come from
    【本页依据】 ① Samsung SDI Q3 revenue KRW 4.69 tn, operating profit KRW 407.8 bn (margin about 8.7%), 60 GWh of ESS orders over nine months —— Samsung SDI: 60GWh of ESS battery orders in 2026 so far, 53% year-over-year ‘revenue surge’ · energy-storage.news · https://www.energy-storage.news/samsung-sdi-60gwh-of-ess-battery-order… ② EVE storage-cell shipments 67.52 GWh over nine months; Q3 implied 23.06 GWh, about 4.2% below Q2 —— EVE Energy ships 67.52 GWh of storage batteries in first nine months of 2026  - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/27/eve-energy-ships-67-52-gwh-of-stor… ③ Sungrow nine-month net profit RMB 6.599 bn (-44.46%); Q3 gross margin 29.45% vs 38.62% in Q2 —— Sungrow Power Supply's Q3 Gross Margin Drops Nearly 9 Percentage Points Quarter-on-Quarter; Multiple Solar and Energy Storage Equipment Manufacturers Have Initiated Price Hikes | Financial Report Analysis · moomoo.com · https://www.moomoo.com/news/post/1003023552/sungrow-power-supply-s-q3-… ④ BYD Q3 net profit RMB 10.02 bn, 12% to 23% below broker expectations —— BYD (BYDDY) Q3 profit jumps 28% on exports, but inventory balloons 60% | Electrek · electrek.co · https://electrek.co/2026/10/29/byd-q3-2026-earnings-profit-exports-inv… ⑤ EVE says Q4 capacity is fully booked (company says, 2026-10-23) —— EVE Energy ships 67.52 GWh of storage batteries in first nine months of 2026  - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/27/eve-energy-ships-67-52-gwh-of-stor… Energy, Pylontech, and CosMX Report Q3 2026 Energy Storage Results - EnergyTrend · energytrend.com · https://www.energytrend.com/news/20261026-52364.html ⑥ EVE operating cash flow fell 65.37% to RMB 1.698 bn —— China's EVE Energy posts CNY 73.39 billion in first three quarters, power battery shipments up over 90% — BigGo Finance · finance.biggo.com · https://finance.biggo.com/news/d51c9b52-c767-463c-bc75-19f9f87fbca0
  8. Slide 8: Orders|Count 1 GWh as signed; treat 5 GWh as intent

    Slide 8

    Orders|Count 1 GWh as signed; treat 5 GWh as intent

    Speaker notes

    Count 1 GWh as signed and treat 5 GWh as intent. The only order with a stated volume that was a signed contract was Samsung SDI's 1 GWh for Alpha Omega Power on 26 October. LG Energy Solution with Energix and CATL with Intilion, both on 27 October, are non-binding MoUs, about 5 GWh together. EVE and Fluence's up to 206 GWh is a framework agreement from September. Top-tier lines are full, and Samsung SDI says more than 60 GWh of orders fill its lines through 2028. Delivery, not demand, is the constraint. Next, US supply.

    Slide text

    Orders

    Count 1 GWh as signed; treat 5 GWh as intent

    Source: Business Wire (Samsung SDI); LGES newsroom; CATL newsroom; ESS News

    Volume by deal, GWh

    Reading: only the Samsung SDI–Alpha Omega Power deal (2026-10-26) is signed; the two MoUs (both 2026-10-27) are non-binding

    Signed vs intent

    1 GWh signed against 2 + 3 = 5 GWh of MoUs, or 6.5 GWh if LGES’s 4.5 GWh upside is counted

    Full lines, planned builds

    Samsung SDI: more than 60 GWh of orders fill its SPE and Ulsan lines through 2028 (company says)

    CATL: utilisation above 90% (H1 2026)

    Deye: 16 GWh C&I line, land won and not built

    EVE–Fluence: up to 206 GWh is a framework agreement (context, Sept 2026)

    Consequence: volume that looks like demand is mostly intent; delivery, not demand, is the constraint to watch

    Next step: count only signed contracts with a stated volume as orders; label MoUs and framework agreements as intent

    Where the numbers come from
    【本页依据】 ① Samsung SDI's 1 GWh for Alpha Omega Power (2026-10-26) is the only signed contract with a stated volume —— Samsung SDI and Alpha Omega Power Sign 1 GWh Supply Agreement for U.S.-Made Energy Storage · finance.yahoo.com · https://finance.yahoo.com/energy/articles/samsung-sdi-alpha-omega-powe… ② LGES-Energix (about 2 GWh, 4.5 GWh under discussion) and CATL-Intilion (3 GWh) are non-binding MoUs, 5 GWh or 6.5 GWh with upside —— Newsroom|LG Energy Solution · lgensol.com · https://www.lgensol.com/mobile/en/company/newsroom-detail?seq=8792;3GW…,钠电储能规模化出海 · catl.com · https://www.catl.com/news/10337.html ③ Samsung SDI says more than 60 GWh of orders fill its SPE and Ulsan lines through 2028 —— Samsung SDI Co Ltd (FRA:XSDG) (Q3 2026) Earnings Call Highlights: Return to Profit on ESS Boom ... — TradingView News · tradingview.com · https://www.tradingview.com/news/gurufocus:b866e8f22094b:0-samsung-sdi… ④ CATL utilisation above 90% in H1 2026 —— CATL Retains Top AAA Rating in PV Tech’s Battery Storage Bankability Rankings · catl.com · https://www.catl.com/en/news/7043.html ⑤ Deye 16 GWh C&I line, land won and not built —— Deye Energy Storage Secures Cixi Phase II Land with 100M Yuan Investment for 9GWh Commercial & Industrial Energy Storage Production Line - EnergyTrend · energytrend.com · https://www.energytrend.com/news/20261026-52366.html ⑥ EVE-Fluence up to 206 GWh is a framework agreement (Sept 2026) —— EVE Energy ships 67.52 GWh of storage batteries in first nine months of 2026  - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/27/eve-energy-ships-67-52-gwh-of-stor…
  9. Slide 9: US supply|Ask who owns the maker; expect two price tiers

    Slide 9

    US supply|Ask who owns the maker; expect two price tiers

    Speaker notes

    Last page covered orders; this one turns to US supply, where eligibility turns on who owns or controls the maker, not where the cell is made. The prohibited-foreign-entity test is in effect: one entity at 25% or more, combined 40%, or debt 15%. The §48E cost ratio is 55% in effect and 60% upcoming, and Treasury's effective control guidance is due 2026-12-31. Cells are 52.0% of grid-scale direct cost, so cells from a prohibited entity leave 48%, below 55%. That may split the market into price tiers. For US projects, ask who owns the maker. Next, technology.

    Slide text

    US supply

    Ask who owns the maker; expect two price tiers

    Source: Intertek CEA via ESS News (pv magazine USA); China Prospect (secondary, undated); Benchmark; TradingView

    Eligibility turns on who owns or controls the maker, not where the cell is made

    Rule

    Threshold

    Status

    Prohibited-foreign-entity test

    One entity ≥25% ; combined ≥40% ; debt ≥15%

    In effect

    §48E cost ratio

    55%

    In effect

    §48E cost ratio

    60%

    Upcoming

    Treasury “effective control” guidance

    Due 2026-12-31

    Upcoming

    China pause on new cell-capacity approvals

    Extended from BESS to EV cells in September

    Reported, not official

    ≈11%

    of announced 2026 US production capacity may slip into 2027 ( Intertek CEA estimate , 2026-10-27)

    ≈23 GWh

    of LFP cathode capacity announced by Korean cathode makers ( estimate )

    ≈230 GWh

    Q2 2026 shipments, +18% QoQ, on pre-stocking before the export VAT rebate ends on 2027-01-01

    52.0%

    of grid-scale direct cost is cells, so cells from a prohibited entity leave 48%, below 55%

    Two price tiers

    Consequence: tax-credit eligibility may split the market into price tiers, so credit-eligible or booked-out cells may price differently from commodity LFP. The material does not show whether pre-stocking continued into Q4.

    Next step: for US projects ask who owns the maker, and track the 2026-12-31 Treasury guidance

    Where the numbers come from
    【本页依据】 ① Prohibited-foreign-entity test in effect: one entity >=25%, combined >=40%, debt >=15%; eligibility turns on who owns or controls the maker, not where the cell is made —— Battery Storage Tax Credit: Prohibited Foreign Entity Rules | China Prospect · chinaprospect.com · https://chinaprospect.com/battery-storage-tax-credit-foreign-entity-ru… ② Section 48E cost ratio is 55% in effect and 60% upcoming; Treasury "effective control" guidance due 2026-12-31 —— Same as ① ③ China's pause on new cell-capacity approvals was extended from BESS to EV cells in September (reported, not official) —— Battery Cell Price Review Q3 2026 · source.benchmarkminerals.com · https://source.benchmarkminerals.com/article/lithium-cost-pass-through… lithium crash: PLS, LTR, MIN face third bear market in a decade — TradingView News · tradingview.com · https://www.tradingview.com/news/marketindex:35143113a094b:0-asx-lithi… ④ About 11% of announced 2026 US production capacity may slip into 2027, and Korean cathode makers announced about 23 GWh of LFP cathode capacity (Intertek CEA estimate) —— US battery storage prices could fall up to 30% by 2030 - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/27/us-battery-storage-prices-could-fa… ⑤ Q2 2026 shipments about 230 GWh (+18% QoQ) on pre-stocking before the export VAT rebate ends on 2027-01-01 —— US battery storage prices could fall up to 30% by 2030 - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/27/us-battery-storage-prices-could-fa… Express | Cancellation of VAT Export Tax Rebates for Photovoltaic and Other Products - TKG China · tkgelectric.com · https://www.tkgelectric.com/nd.jsp?id=114 ⑥ Cells are 52.0% of grid-scale direct cost, so cells from a prohibited entity leave 48%, below 55% —— Same as ①
  10. Slide 10: Technology|Treat solid-state and sodium-ion as dated plans

    Slide 10

    Technology|Treat solid-state and sodium-ion as dated plans

    Speaker notes

    Having looked at US supply rules, we move to technology, where the message is to treat solid-state and sodium-ion as dated plans. In this window no solid-state cell went beyond the sample stage or a 2027 pilot plan, and Peak Energy's sodium-ion plant, planned for Q1 2027, is not yet producing. Peak Energy holds over US$1 bn of orders against a single 3.5 MWh operating system. CATL's TENER Sodium above 30 MWh is a vendor claim. None of the new chemistries is orderable now, so mark vendor claims in every comparison. Next, China projects.

    Slide text

    Technology

    Treat solid-state and sodium-ion as dated plans

    Source: Electric Viking; TradingView/GuruFocus; ESS News; pv magazine Australia; EnergyTrend

    Status and scale

    No solid-state cell passed sample or 2027 pilot plan; Peak Energy's sodium-ion plant (Q1 2027) is not producing.

    Peak Energy: US$1 bn+ of orders vs one 3.5 MWh operating system; CATL TENER Sodium >30 MWh (vendor claim).

    Consequence and next step

    No new chemistry is orderable now; format scale-up (9 MWh vendor claim, 790 Ah) is the near-term cost lever.

    Next step: treat solid-state and sodium-ion as dated plans and mark vendor claims in every comparison.

    Where the numbers come from
    【本页依据】 ① CATL has 20 Ah all-solid-state samples with small-batch pilot production in 2027 —— CATL Advances 20 Ah Solid-State Battery Cells, Targets 2027 Small-Batch Production - The Electric Viking · theelectricviking.com · https://theelectricviking.com/catl-advances-20-ah-solid-state-battery-… ② Samsung SDI sent solid-state samples to humanoid customers in September 2026, targeting H2 2027 —— Samsung SDI Co Ltd (FRA:XSDG) (Q3 2026) Earnings Call Highlights: Return to Profit on ESS Boom ... — TradingView News · tradingview.com · https://www.tradingview.com/news/gurufocus:b866e8f22094b:0-samsung-sdi… ③ Peak Energy's 4 GWh sodium-ion plant starts production in Q1 2027 and is not yet producing —— Sodium-ion storage maker Peak Energy raises $108 million in GM-led round - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/23/sodium-ion-storage-maker-peak-ener… ④ Peak Energy holds over US$1 bn of orders against one 3.5 MWh operating system —— Same as ③ ⑤ CATL TENER Sodium above 30 MWh per system (vendor claim) —— CATL TENER+ BESS gets global debut while deep interest in TENER Sodium grows - pv magazine Australia · pv-magazine-australia.com · https://www.pv-magazine-australia.com/2026/10/28/catl-tener-bess-gets-… ⑥ CATL TENER+ about 9 MWh per container (vendor claim) and Envision AESC 790 Ah cell in the Renqiu 100 MW / 400 MWh win —— Intensive Energy Storage Order Updates from 7 Firms Including Narada Power and Envision Energy Storage - EnergyTrend · energytrend.com · https://www.energytrend.com/news/20261102-52426.html;CATL TENER+ BESS gets global debut while deep interest in TENER Sodium grows - pv magazine Australia · pv-magazine-australia.com · https://www.pv-magazine-australia.com/2026/10/28/catl-tener-bess-gets-…
  11. Slide 11: China projects|Lingwu is unsigned; spot rules are a draft

    Slide 11

    China projects|Lingwu is unsigned; spot rules are a draft

    Speaker notes

    Next, China projects, where Lingwu is unsigned and the spot rules are a draft. Lingwu in Ningxia is 1,000 MW and 4,000 MWh at CNY 3.64 bn; the award notice was confirmed on 2026-10-26, but the contract is not signed. NDRC's spot-market rules were released as a draft on 2026-10-19, with comments open to 2026-11-18 and a proposed start of 2027-01-01. Capacity pricing is in force but the spot layer is not, so rule text is a better guide to returns than tender volume, which is our judgement. Next, India.

    Slide text

    China projects

    Lingwu is unsigned; spot rules are a draft

    Source: ESS News; EnergyTrend; CNESS; Sohu; CNESA; TD Research

    Lingwu is awarded, not signed

    1,000 MW / 4,000 MWh at CNY 3.64 bn: award notice confirmed 2026-10-26, contract not signed; grid-connection notice due 2027-04-30.

    Others in the window: Narada's Yumen phase I is grid-connected (2026-10-30); Envision won Renqiu (90% LFP / 10% sodium-ion).

    Spot rules are only a draft

    Capacity pricing (Document 114) is in force, the spot layer is not: until provinces write detailed rules, rule text is a better guide to returns than tender volume (our judgement).

    National scale

    Target of 300 GW by 2030, from 168 GW at June 2026; TD Research counted 26.0 GWh of July awards (context).

    Next step: watch the 2026-11-18 comment deadline and the unsigned Lingwu contract before counting either as revenue.

    Project size, MWh

    Read-out: only Lingwu is GWh-scale, and it is unsigned.

    NDRC spot-market rules

    2026-10-19

    Draft released (context)

    2026-11-18

    Draft comments close

    2027-01-01

    Proposed start, valid five years

    2.1 times

    Lingwu bid vs Wuhan Tianyuan's 2025 revenue of about CNY 1.71 bn

    Where the numbers come from
    【本页依据】 ① Lingwu, Ningxia: 1,000 MW / 4,000 MWh at CNY 3.64 bn, award notice confirmed 2026-10-26, contract not signed; grid-connection notice due 2027-04-30 —— Consortium wins $535 million tender for 4 GWh storage project in China - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/29/consortium-wins-535-million-tender… ② Narada's Yumen phase I grid-connected (2026-10-30); Envision won Renqiu (90% LFP / 10% sodium-ion) —— Intensive Energy Storage Order Updates from 7 Firms Including Narada Power and Envision Energy Storage - EnergyTrend · energytrend.com · https://www.energytrend.com/news/20261102-52426.html ③ NDRC spot-market rules are a draft released 2026-10-19, comments close 2026-11-18, proposed start 2027-01-01, valid five years —— 中国储能网 -国家政策 - 一文读懂新版《电力现货市场基本规则(公开征求意见稿)》 } · escn.com.cn · https://www.escn.com.cn/news/show-2334611.html;深度 | 2027年施行,新版电力现货市场基本规则对长时储能的影响_结算_收益_电价 · sohu.com · https://www.sohu.com/a/1093685672_120253635 ④ The Lingwu bid is 2.1 times Wuhan Tianyuan's 2025 revenue of about CNY 1.71 bn —— Same as ① ⑤ National target of 300 GW by 2030, from 168 GW at June 2026 —— long-duration storage — CNESA China Update | Energy Storage Market Insights and Monthly Report · en.cnesa.org · https://en.cnesa.org/china-market-update/tag/long-duration+storage ⑥ TD Research counted 26.0 GWh of July awards —— TD Research | July 2026 China BESS Tender Awards Review: 26.0 GWh Awarded; 4-Hour EPC/PC Price Reaches RMB 0.54/Wh · linkedin.com · https://www.linkedin.com/pulse/td-research-july-2026-china-bess-tender…
  12. Slide 12: India|Plan for 5.3 GWh operating, not 185 GWh pipeline

    Slide 12

    India|Plan for 5.3 GWh operating, not 185 GWh pipeline

    Speaker notes

    From China we move to India, where the advice is to plan for 5.3 GWh operating, not the 185 GWh pipeline. Those are the CEA figures reported on 2026-10-27, so operating capacity is 2.9% of what is under development. On 2026-10-28 SECI issued an RfS for 4 GW and 16 GWh of standalone BESS, with a 20-year PPA and at least 51% renewable charging. Across the overseas tracker, only 781.4 MWh of 26,620 MWh is commissioned. So plan on operating capacity and 15 to 18 month build times. Next, the other markets.

    Slide text

    India

    Plan for 5.3 GWh operating, not 185 GWh pipeline

    Source: SolarQuarter; Energy-Storage.news (CEA)

    India BESS capacity, GWh

    Read-out: operating is 5.3 GWh, 2.9% of the 185 GWh under development.

    CEA figures, reported 2026-10-27

    SECI tender

    4 GW / 16 GWh standalone BESS RfS, issued 2026-10-28: Rajasthan 2.5 GW / 10 GWh and Gujarat 1.5 GW / 6 GWh, 20-year PPA, at least 51% renewable charging.

    Viability gap funding

    INR 15 lakh/MWh × 16,000 MWh = INR 2,400 crore, about US$253 m (derived).

    Consequence

    Pipeline is not operating capacity: across the overseas tracker only 781.4 MWh of 26,620 MWh (2.9%) is commissioned.

    Next step: plan on operating capacity and 15–18 month build times, and note that safety standards start in April 2027.

    Where the numbers come from
    【本页依据】 ① SECI issued a 4 GW / 16 GWh standalone BESS RfS on 2026-10-28: Rajasthan 2.5 GW / 10 GWh and Gujarat 1.5 GW / 6 GWh, 20-year PPA, at least 51% renewable charging —— SECI Issues Tender For 4 GW/16 GWh BESS Projects In Rajasthan And Gujarat With VGF - SolarQuarter · solarquarter.com · https://solarquarter.com/2026/10/29/seci-issues-tender-for-4-gw-16-gwh… ② India has 5.3 GWh operating against 185 GWh under development (2.9%), CEA figures reported 2026-10-27 —— India has 5.3GWh of operational BESS, with 185GWh under development, CEA official says · energy-storage.news · https://www.energy-storage.news/india-has-5-3gwh-of-operational-bess-w… ③ VGF INR 15 lakh/MWh x 16,000 MWh = INR 2,400 crore, about US$253 m (derived) —— SECI Issues Tender For 4 GW/16 GWh BESS Projects In Rajasthan And Gujarat With VGF - SolarQuarter · solarquarter.com · https://solarquarter.com/2026/10/29/seci-issues-tender-for-4-gw-16-gwh… has 5.3GWh of operational BESS, with 185GWh under development, CEA official says · energy-storage.news · https://www.energy-storage.news/india-has-5-3gwh-of-operational-bess-w… ④ VGF supported 13.2 GWh and a 30 GWh scheme brings supported capacity to 43.2 GWh —— Same as ② ⑤ Across the overseas tracker only 781.4 MWh of 26,620 MWh (2.9%) is commissioned —— ACME Solar Commissions Additional 35.77 MW/143.08 MWh BESS Capacity In Rajasthan - SolarQuarter · solarquarter.com · https://solarquarter.com/2026/10/28/acme-solar-commissions-additional-… ⑥ Construction takes 15-18 months, and India's safety standards start in April 2027 —— India’s BESS pipeline needs bankable tenders and diversified revenue streams · energy-storage.news · https://www.energy-storage.news/indias-bess-pipeline-needs-bankable-te… has 5.3GWh of operational BESS, with 185GWh under development, CEA official says · energy-storage.news · https://www.energy-storage.news/india-has-5-3gwh-of-operational-bess-w…
  13. Slide 13: Other markets|Check the stage: most deals are sold, not built

    Slide 13

    Other markets|Check the stage: most deals are sold, not built

    Speaker notes

    Beyond India, the rest of the overseas picture says to check the stage, because most deals are sold, not built. Pulverdingen, about 1 GW and 4 GWh, is permit pending, with grid connection targeted for 2029. Baixas and Coquainvilliers, 200 MW and 800 MWh, were sold to BW ESS while still in development. Samsung SDI America signed 1 GWh with Alpha Omega Power on 2026-10-26. Only Chile and Australia report capacity actually online, so elsewhere volume is not yet revenue. Check each deal's stage before counting it. Next, what to do.

    Slide text

    Other markets

    Check the stage: most deals are sold, not built

    Source: ADS-TEC; Canadian Solar; Greenvolt; pv magazine Australia; ACERA via Energy-Storage.news; SolarQuarter

    Where each deal stands

    Pulverdingen, about 1 GW / 4 GWh: permit pending, grid connection targeted for 2029

    Baixas + Coquainvilliers, 200 MW / 800 MWh: sold to BW ESS while still in development

    Ełk + Turośń Kościelna, 1.6 GWh: sale agreed, closing expected by end-2026; 17-year capacity-market contracts from 2028

    Samsung SDI America, 1 GWh: signed with Alpha Omega Power on 2026-10-26

    Australia, 2.3 GW / 7.1 GWh: online in H1 2026 (source unnamed)

    Chile, 3.1 GW / 13.5 GWh: operating, plus 3.7 GW in testing; ACERA says operating capacity could triple within twelve months (projection)

    Egypt, Dandara: US$217 m debt against US$271 m capex for a 100 MWh battery, financing agreed

    Overseas deals by stage, GWh

    Read: only the two green bars are online

    Next step

    Why it matters: only Chile and Australia report capacity actually online; European and US rows are sold, permit pending or contracted, so volume is not yet revenue.

    Check each overseas deal's stage, from permit pending to financed, signed or operating, before counting it.

    Where the numbers come from
    【本页依据】 ① Pulverdingen, about 1 GW / 4 GWh: permit pending, grid connection targeted for 2029 —— ADS-TEC Energy Advances One of Europe’s Largest Battery Storage Projects as Building Permit Nears · finance.yahoo.com · https://finance.yahoo.com/energy/articles/ads-tec-energy-advances-one-… Energy expects permit shortly for ~1 GW plant | ADSE SEC Filing - Form 6-K · stocktitan.net · https://www.stocktitan.net/sec-filings/ADSE/6-k-ads-tec-energy-public-… ② Baixas + Coquainvilliers (200 MW / 800 MWh) sold to BW ESS while in development; Greenvolt agreed to sell Elk + Turosn Koscielna (1.6 GWh), closing by end-2026, with 17-year capacity-market contracts from 2028 —— Recurrent Energy Completes Sale of Two 100 MW / 400 MWh BESS Projects in France to BW ESS · prnewswire.com · https://www.prnewswire.com/news-releases/recurrent-energy-completes-sa… Power agrees to sell 400 MW/1.6 GWh Bess Projects to A&R Investments - Power · power.greenvolt.com · https://power.greenvolt.com/media/news/greenvolt-power-agrees-to-sell-… ③ Samsung SDI America signed 1 GWh with Alpha Omega Power on 2026-10-26 —— Samsung SDI and Alpha Omega Power Sign 1 GWh Supply Agreement for U.S.-Made Energy Storage · finance.yahoo.com · https://finance.yahoo.com/energy/articles/samsung-sdi-alpha-omega-powe… ④ Australia: 2.3 GW / 7.1 GWh online in H1 2026 (source unnamed) —— Batteries are big at All Energy Australia 2026 - pv magazine Australia · pv-magazine-australia.com · https://www.pv-magazine-australia.com/2026/10/30/batteries-are-big-at-… ⑤ Chile: 3.1 GW / 13.5 GWh operating plus 3.7 GW in testing; ACERA says operating capacity could triple within twelve months —— BESS already reducing curtailment in Chile, says ACERA; in-construction projects to triple capacity · energy-storage.news · https://www.energy-storage.news/bess-already-reducing-curtailment-in-c… ⑥ Egypt's Dandara: US$217 m debt against US$271 m capex for a 100 MWh battery, financing agreed —— Scatec Secures $217 Million Financing For 569 MW Solar And 100 MWh BESS Project In Egypt - SolarQuarter · solarquarter.com · https://solarquarter.com/2026/10/29/scatec-secures-217-million-financi…
  14. Slide 14: What to do|Name the price type; watch Nov 18 and Jan 1

    Slide 14

    What to do|Name the price type; watch Nov 18 and Jan 1

    Speaker notes

    Putting the markets together, the next 60 days will be settled by contract terms and rule text, not by chemistry. The buyer checklist has five points: name the price type, check the stage, confirm tax and delivery basis, ask who owns the maker for US projects, and mark vendor claims. Watch 2026-11-18, when NDRC comments close, and 2027-01-01, when the export VAT rebate is cancelled. Benchmark and Intertek estimates point in different directions, and the material does not show whether pre-stocking continued into Q4. That brings us to the close.

    Slide text

    What to do

    Name the price type; watch Nov 18 and Jan 1

    Source: SMM; Benchmark; CNESS; Sohu; TKG China; EnergyTrend; ESS News

    Rule text, not chemistry, decides the next 60 days

    2026-11-18

    NDRC comments close

    2027-01-01

    Rebate cancelled; NDRC proposed start

    2026-09-01

    2% consumption tax

    In effect

    2026-10-01

    Australia SRES cap 1 MW

    In effect

    2026-11-04 / 05 / 09

    RelyEZ (9621): offer closes, pricing, dealing

    Upcoming

    2026-12-31

    Treasury “effective control” guidance due

    Upcoming

    Q1 2027

    Peak Energy plant

    Plan

    April 2027

    India safety standards start

    Upcoming

    H2 2027

    Samsung SDI humanoid target

    Target

    Buyer checklist

    Name the price type

    Check the stage

    Confirm tax and delivery basis

    Ask who owns the maker for US projects

    Mark vendor claims

    What it means

    Benchmark expects lagged cuts to cell quotes in Q4; Intertek expects the rebate end to soften cost deflation (estimates).

    The material does not show whether pre-stocking continued into Q4.

    Next step

    Apply the five-point checklist to every quote and watch 2026-11-18 and 2027-01-01.

    Where the numbers come from
    【本页依据】 ① NDRC spot-rule comments close 2026-11-18; export VAT rebate cancelled and NDRC proposed start on 2027-01-01 —— 中国储能网 -国家政策 - 一文读懂新版《电力现货市场基本规则(公开征求意见稿)》 } · escn.com.cn · https://www.escn.com.cn/news/show-2334611.html;深度 | 2027年施行,新版电力现货市场基本规则对长时储能的影响_结算_收益_电价 · sohu.com · https://www.sohu.com/a/1093685672_120253635;Industry Express | Cancellation of VAT Export Tax Rebates for Photovoltaic and Other Products - TKG China · tkgelectric.com · https://www.tkgelectric.com/nd.jsp?id=114 ② Treasury "effective control" guidance due 2026-12-31 —— Battery Storage Tax Credit: Prohibited Foreign Entity Rules | China Prospect · chinaprospect.com · https://chinaprospect.com/battery-storage-tax-credit-foreign-entity-ru… ③ RelyEZ (9621) offer closes 2026-11-04, pricing 2026-11-05, dealing 2026-11-09 —— RelyEZ Launches Hong Kong IPO, Aiming to Raise up to HK$639 Million - EnergyTrend · energytrend.com · https://www.energytrend.com/news/20261102-52422.html ④ In effect: 2% consumption tax since 2026-09-01 and Australia SRES cap raised to 1 MW on 2026-10-01 —— Battery Cell Price Review Q3 2026 · source.benchmarkminerals.com · https://source.benchmarkminerals.com/article/lithium-cost-pass-through… are big at All Energy Australia 2026 - pv magazine Australia · pv-magazine-australia.com · https://www.pv-magazine-australia.com/2026/10/30/batteries-are-big-at-… ⑤ Peak Energy plant Q1 2027; India safety standards April 2027; Samsung SDI humanoid target H2 2027 —— Sodium-ion storage maker Peak Energy raises $108 million in GM-led round - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/23/sodium-ion-storage-maker-peak-ener… has 5.3GWh of operational BESS, with 185GWh under development, CEA official says · energy-storage.news · https://www.energy-storage.news/india-has-5-3gwh-of-operational-bess-w… SDI Co Ltd (FRA:XSDG) (Q3 2026) Earnings Call Highlights: Return to Profit on ESS Boom ... — TradingView News · tradingview.com · https://www.tradingview.com/news/gurufocus:b866e8f22094b:0-samsung-sdi… ⑥ Benchmark expects lagged cuts to cell quotes in Q4, while Intertek expects the rebate end to soften cost deflation (estimates) —— Battery Cell Price Review Q3 2026 · source.benchmarkminerals.com · https://source.benchmarkminerals.com/article/lithium-cost-pass-through… battery storage prices could fall up to 30% by 2030 - Energy Storage · ess-news.com · https://www.ess-news.com/2026/10/27/us-battery-storage-prices-could-fa…
  15. Slide 15: Contracts and rules decide the next 60 days

    Slide 15

    Contracts and rules decide the next 60 days

    Speaker notes

    To close: the next 60 days will be settled by contract terms and rule text, not by chemistry. Apply the checklist to every quote, and watch 2026-11-18 and 2027-01-01. Thank you.

    Slide text

    Closing

    The next 60 days will be settled by contract

    terms and rule text, not by chemistry.

    Thank you

    2026-11-03 · Energy Storage & Batteries Brief · Oct 23–Nov 2, 2026

Sources (151)

Links go to the original pages Divrite found and cited while researching.

  1. 01Prices hold steady ahead of the National Day; price negotiation to kick off after holidayinfolink-group.com
  2. 02Solar cell and module technology: Trends and outlooks-webinar-InfoLink Consultinginfolink-group.com
  3. 03[SMM Analysis] Lithium Battery Q3 2026 Profit Divergence - Shanghai Metals Market (SMM)news.metal.com
  4. 04[SMM Lithium Carbonate Daily Review] On October 28, spot lithium carbonate prices rose by 700 yuan/mt, while futures retreated after a rapid rise, falling on increased volume and open interest. - Shanghai Metals Market (SMM)news.metal.com
  5. 05[SMM Lithium Carbonate Daily Review] On October 28, spot lithium carbonate prices rose by 700 yuan/mt, while futures retreated after a rapid rise, falling on increased volume and open interest. - Shanghai Metals Market (SMM)news.metal.com
  6. 06[SMM Lithium Carbonate Daily Review] On October 26, spot lithium carbonate stopped falling and rebounded, ending its previous consecutive decline. - Shanghai Metals Market (SMM)news.metal.com
  7. 07[SMM Lithium Carbonate Daily Review] On October 26, spot lithium carbonate stopped falling and rebounded, ending its previous consecutive decline. - Shanghai Metals Market (SMM)news.metal.com
  8. 08[SMM Lithium Carbonate Daily Review] Lithium Carbonate Futures and Spot Prices Rebound in Tandem on October 27 - Shanghai Metals Market (SMM)news.metal.com
  9. 09【SMM Analysis】Peak Season Disappoints; Structural Divergence Widens in Consumer Lithium Battery Market - Shanghai Metals Market (SMM)news.metal.com
  10. 10According to Huayou Cobalt's Q3 2026 report released on October 24, re - Shanghai Metals Market (SMM)news.metal.com
  11. 11[Lithium battery: EVE Energy Q1-Q3 net profit up 86%, ESS battery shipments reach 67.52GWh] - Shanghai Metals Market (SMM)news.metal.com
  12. 12[Solid-state battery: Samsung SDI reiterates mass production of 900Wh/L all-solid-state battery in H2 2027, with initial applications targeting luxury vehicles and humanoid robots] - Shanghai Metals Market (SMM)news.metal.com
Show 139 more sources
  1. 13Battery Cell Price Review Q3 2026source.benchmarkminerals.com
  2. 14Anode and Graphite Q3 2026 Price Reviewsource.benchmarkminerals.com
  3. 15Q3 2026 Cobalt Price Reviewsource.benchmarkminerals.com
  4. 16Q3 2026 Nickel Price Reviewsource.benchmarkminerals.com
  5. 17Benchmark expands rare earth price assessments with 19 new gradessource.benchmarkminerals.com
  6. 18What is black mass and how is it priced?source.benchmarkminerals.com
  7. 19Lithium's BESS hangover: UBS sees no rebound before year endmarketindex.com.au
  8. 20Lithium's BESS hangover: UBS sees no rebound before year end — TradingView Newstradingview.com
  9. 21ASX lithium crash: PLS, LTR, MIN face third bear market in a decademarketindex.com.au
  10. 22ASX lithium crash: PLS, LTR, MIN face third bear market in a decade — TradingView Newstradingview.com
  11. 23Carl Capolingua on X: "#LITHIUM's BESS hangover: UBS sees no rebound before year end 🙅 ✅ Latest on the ground analyst update 🧐 ✅ "Floor price" for lithium confirmed! 🛡️ ✅ Why destocking still underway... 📉 Click to read 👇 $MIN $PLS $LTR $ELV $ALB $LAC $LIT $SQM https://t.co/HEi9hjpkOZ" / Xx.com
  12. 24Lithium Miners News For The Month Of October 2026 | Seeking Alphaseekingalpha.com
  13. 25Consortium wins $535 million tender for 4 GWh storage project in China - Energy Storageess-news.com
  14. 26ADS-TEC Energy nears final permit for 1 GW / 4 GWh battery project in Germany - Energy Storageess-news.com
  15. 27Singapore targets 1 GWh of energy storage by 2030, opens industry consultation - Energy Storageess-news.com
  16. 28Singapore targets 1 GWh of energy storage by 2030, opens industry consultation - Energy Storageess-news.com
  17. 29Sodium-ion storage maker Peak Energy raises $108 million in GM-led round - Energy Storageess-news.com
  18. 30Where are the batteries? Localization concerns amid India’s energy storage boom  - Energy Storageess-news.com
  19. 31TD Research | July 2026 China BESS Tender Awards Review: 26.0 GWh Awarded; 4-Hour EPC/PC Price Reaches RMB 0.54/Whlinkedin.com
  20. 32Tender Ref: MANPBT0042 DT.23.10.2026: Pre bid Tie up/MOU for EPC package for development of 200MW/400MWh BESS at NTPC Mouda - Embassy of India, Tashkenteoitashkent.gov.in
  21. 33Tender Ref: MANPBT0042 DT.23.10.2026: Pre bid Tie up/MOU for EPC package for development of 200MW/400MWh BESS at NTPC Mouda - Tenders | Embassy of India, Minsk, Belaruseoiminsk.gov.in
  22. 34GLOBAL OFFERINGwww1.hkexnews.hk
  23. 35AwardDetailsntpctender.ntpc.co.in
  24. 36US battery storage prices could fall up to 30% by 2030 - Energy Storageess-news.com
  25. 37Italy’s negative prices highlight battery storage opportunity - Energy Storageess-news.com
  26. 38India rooftop solar subsidy could unlock up to 25 GWh of battery storage - Energy Storageess-news.com
  27. 39Samsung SDI signs 1 GWh supply agreement for US-made NCA battery storage - Energy Storageess-news.com
  28. 40Industry Express | Cancellation of VAT Export Tax Rebates for Photovoltaic and Other Products - TKG Chinatkgelectric.com
  29. 41China's 2026 Export Tax Rebate Cut: Which Chemicals Changedqiboch.com
  30. 42Export tax rebate rate_Baiduwikibaike.baidu.com
  31. 43Samsung SDI: 60GWh of ESS battery orders in 2026 so far, 53% year-over-year ‘revenue surge’energy-storage.news
  32. 44Technology Archivesenergy-storage.news
  33. 45Materials & Production Archivesenergy-storage.news
  34. 46Tesla Q3 2026 energy storage revenues fall despite second-highest quarterly deploymentsenergy-storage.news
  35. 47Energy-Storage.Newsenergy-storage.news
  36. 48Energy-Storage.Newsenergy-storage.news
  37. 49EVE Energy Q3 2026 revenue up 64.6% to RMB27.7bn; energy-storage cell shipments reach 67.5 GWh in nine months | SSG Eventsssg.events
  38. 50EVE Energy ships 67.52 GWh of storage batteries in first nine months of 2026  - Energy Storageess-news.com
  39. 51China's EVE Energy posts CNY 73.39 billion in first three quarters, power battery shipments up over 90% — BigGo Financefinance.biggo.com
  40. 52ESS News on X: "EVE Energy ships 67.​52 GWh of storage batteries in first nine months of 2026 : Storage battery shipments rose 39.​5% year on year, while the Chinese manufacturer reported improving profitability and fully booked… dlvr.​it/TW4m0x #energystorage #BatteryStorage #SmartEnergy" / Xx.com
  41. 53Why is Sungrow Power Supply stock surging today?investing.com
  42. 54Sungrow Power Supply's Q3 Gross Margin Drops Nearly 9 Percentage Points Quarter-on-Quarter; Multiple Solar and Energy Storage Equipment Manufacturers Have Initiated Price Hikes | Financial Report Analysismoomoo.com
  43. 55Sungrow Power Supply Annual Report | SZ:300274 Financials - Investing.com UKuk.investing.com
  44. 56Sungrow Power Supplytavily.com
  45. 57BYD Q3 2026 results: Revenue rises 13.59% to RM 138.4 billion, net profit up 28.08%, overseas sales surge 90.7% | BitAuto Malaysiabitauto.my
  46. 58BYD Delivers Strong Q3 2026 Profit Growth Amid Flat Year-to-Date Revenue - TipRanks.comtipranks.com
  47. 59BYD Delivers Strong Q3 2026 Profit Growth Amid Flat Year-to-Date Revenue - The Globe and Mailtheglobeandmail.com
  48. 60BYD Q3 2026 Earnings Preview: Revenue Growth and Margin Pressures Aheadtickeron.com
  49. 61BYD (BYDDY) Q3 profit jumps 28% on exports, but inventory balloons 60% | Electrekelectrek.co
  50. 62News - EnergyTrendenergytrend.com
  51. 63energy storage news - EnergyTrendenergytrend.com
  52. 64Deye Energy Storage Secures Cixi Phase II Land with 100M Yuan Investment for 9GWh Commercial & Industrial Energy Storage Production Line - EnergyTrendenergytrend.com
  53. 65Three Enterprises Including CATL Set Up New Energy Subsidiaries with Registered Capital Exceeding 530 Million Yuan - EnergyTrendenergytrend.com
  54. 66Great Power, Sinexcel, and Kstar Announce Q3 2026 Financial Results - EnergyTrendenergytrend.com
  55. 67CATL and Five Other Enterprises Inject Capital into Guangdong New Energy Storage National Research Institute - EnergyTrendenergytrend.com
  56. 68Sigenergy Plans Joint-Venture Energy Storage Factory in India with an Initial Investment of USD 250 Million - EnergyTrendenergytrend.com
  57. 69US-based QuantumScape Plans 100 MWh Solid-State Battery Production Line, Targeting AI Data Centers and Other Markets - EnergyTrendenergytrend.com
  58. 70Samsung SDI and Alpha Omega Power Sign 1 GWh Supply Agreement for U.S.-Made Energy Storagefinance.yahoo.com
  59. 71Samsung SDI wins 1 GWh US energy storage deal - The Korea Heraldkoreaherald.com
  60. 72Samsung SDI expands US energy storage push with Texas deal - Aju Press AMPm.ajupress.com
  61. 73Alpha Omega Power Expands Partnership with Samsung SDI Battery Systems | Alpha Omega Power LLC posted on the topic | LinkedInlinkedin.com
  62. 74Samsung SDI Supplies 1.5 GWh Prismatic ESS Batteries to U.S. Firmchosun.com
  63. 75Samsung SDI Signs 1-GWh ESS Deal, Expands Indiana Storage Pushbatterytechonline.com
  64. 76Energix & LG Energy Solution sign 4.5 GWh battery storage MoUsolarbytes.info
  65. 77LG Energy Solution, Energix sign MoU to explore up to 4.5 GWh of BESS deployments - Energy Storageess-news.com
  66. 78LG Energy Solution : and Energix Sign MoU to Expand ESS Business in Europe and North America | MarketScreenermarketscreener.com
  67. 79Newsroom|LG Energy Solutionlgensol.com
  68. 80LG Energy Solution and Energix explore 4.5 GWh BESS supplybioenergybusiness.com
  69. 81LG Energy Solution Signs MoU With Energix for Up to 4.5GWh of BESS Supply - Shanghai Metals Market (SMM)news.metal.com
  70. 823GWh!INTILION与宁德时代签约,钠电储能规模化出海catl.com
  71. 83CATL Retains Top AAA Rating in PV Tech’s Battery Storage Bankability Rankingscatl.com
  72. 84CATLドイツ工場セル生産開始catl.com
  73. 85Battery Storage Tax Credit: Prohibited Foreign Entity Rules | China Prospectchinaprospect.com
  74. 86The Battery Storage Development Handbook: Developing, Financing and ... - Julian R. Sterling - Google Booksbooks.google.com
  75. 87Reducing Import Costs for High-Value Components in the Battery & Energy Storage Supply Chain — RK Logisticsrklogisticsgroup.com
  76. 88CATL targets 2027 for solid-state battery pilot production | Межаmezha.net
  77. 89CATL targets 2027 pilot production for solid-state batteries | LavX Newsnews.lavx.hu
  78. 90CATL confirms 2027 solid-state battery pilot for premium EVseastasiabrief.com
  79. 91CATL sets 'industry-leading' solid-state battery production timeline - Notebookcheck Newsnotebookcheck.net
  80. 92CATL plans small-scale solid-state battery output in 2027 | UA.NEWSua.news
  81. 93CATL Advances 20 Ah Solid-State Battery Cells, Targets 2027 Small-Batch Production - The Electric Vikingtheelectricviking.com
  82. 94[Solid-state battery: Solid Power’s MOBIUS pilot line for continuous production of sulphide electrolyte begins commissioning, capacity to increase by 150%] - Shanghai Metals Market (SMM)news.metal.com
  83. 95[Solid-state battery: Tinci Materials' hundred-mt-class sulphide solid-state electrolyte pilot line completed and trial production started, samples begin delivery] - Shanghai Metals Market (SMM)news.metal.com
  84. 96[Solid-state battery: Tianqi Lithium's 50 mt lithium sulfide pilot project expected to be completed in H2, samples already sent to over 30 clients] - Shanghai Metals Market (SMM)news.metal.com
  85. 97Electrolyte prices declined this week (Oct. 26-29, 2026) [SMM Lithium Battery Electrolyte Market Weekly Review] - Shanghai Metals Market (SMM)news.metal.com
  86. 98Sunwoda's Solid-State Battery Still in Customer Sample Testing, Putting 2026 Mass-Production Goal in Doubt | XenoSpectrumxenospectrum.com
  87. 99Samsung SDI Co Ltd (FRA:XSDG) (Q3 2026) Earnings Call Highlights: Return to Profit on ESS Boom ... — TradingView Newstradingview.com
  88. 100EV Battery Stocks List: 23 Battery Companies (2026) | GSRgreenstocksresearch.com
  89. 101Peak Energy Raises $108M Series B for Sodium-Ion 2026 | Pomegrapomegra.io
  90. 102Peak Energy Raises $108 Million to Scale Sodium-Ion Batteries for AI Data Centres | OneStop ESGonestopesg.com
  91. 103Instagraminstagram.com
  92. 104Battery Power Online | Peak Energy Raises $108M, InoBat Eyes AI Data Center Storage with Analog Devicesbatterypoweronline.com
  93. 105India’s battery manufacturing pipeline hits 110 GWh - Energy Storageess-news.com
  94. 106long-duration storage — CNESA China Update | Energy Storage Market Insights and Monthly Reporten.cnesa.org
  95. 107ESIE 2027 — Energy Storage Event Recaps | CNESAen.cnesa.org
  96. 108Bulgaria — Industry Newsen.cnesa.org
  97. 109Intensive Energy Storage Order Updates from 7 Firms Including Narada Power and Envision Energy Storage - EnergyTrendenergytrend.com
  98. 110RelyEZ Launches Hong Kong IPO, Aiming to Raise up to HK$639 Million - EnergyTrendenergytrend.com
  99. 111Nearly 2.2 GWh: Four Firms Including SVOLT and Samsung SDI Secure Energy Storage Orders - EnergyTrendenergytrend.com
  100. 112EVE Energy, Pylontech, and CosMX Report Q3 2026 Energy Storage Results - EnergyTrendenergytrend.com
  101. 113New Updates on PV Orders for Tongwei, Jinko and Other Firms, Scale Exceeds 2.5 GW - EnergyTrendenergytrend.com
  102. 114深度 | 2027年施行,新版电力现货市场基本规则对长时储能的影响_结算_收益_电价sohu.com
  103. 115电力现货市场新规拟支持新能源配储联合参与报价 _ 东方财富网stock.eastmoney.com
  104. 116国家发改委《电力现货市场基本规则》公开征求意见:新能源配储可联合报价,新型储能/虚拟电厂/绿电直连统一入场,场站通信与计量体系迎改造窗口 - 杭州领祺科技有限公司linkqi.cn
  105. 117电力现货市场基本规则征求意见:2027年施行后光伏电站收益怎么算-安徽锦天新能源科技有限公司jintianne.com
  106. 118中国储能网 -国家政策 - 一文读懂新版《电力现货市场基本规则(公开征求意见稿)》 }escn.com.cn
  107. 119电力现货市场新规拟支持新能源配储联合参与报价_油气资讯_油服网youfuw.com
  108. 1202026102301455.pdfhkexnews.hk
  109. 1212026082801325.pdfhkexnews.hk
  110. 122How to Apply for Hong Kong Offer Shareswww1.hkexnews.hk
  111. 123SECI Issues Tender For 4 GW/16 GWh BESS Projects In Rajasthan And Gujarat With VGF - SolarQuartersolarquarter.com
  112. 124ACME Solar Commissions Additional 35.77 MW/143.08 MWh BESS Capacity In Rajasthan - SolarQuartersolarquarter.com
  113. 125Bondada Engineering Wins Contract For 20 MW/120 MWh Vanadium Flow Battery Storage Project In Gujarat - SolarQuartersolarquarter.com
  114. 126Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat - SolarQuartersolarquarter.com
  115. 127TNERC Approves 600 MW Solar Power With 1,800 MWh Storage At INR 3.12 per Unit In Tamil Nadu - SolarQuartersolarquarter.com
  116. 128Scatec Secures $217 Million Financing For 569 MW Solar And 100 MWh BESS Project In Egypt - SolarQuartersolarquarter.com
  117. 129India has 5.3GWh of operational BESS, with 185GWh under development, CEA official saysenergy-storage.news
  118. 130India’s BESS pipeline needs bankable tenders and diversified revenue streamsenergy-storage.news
  119. 131India’s BESS pipeline needs bankable tenders and diversified revenue streamsenergy-storage.news
  120. 132Distributed Archivesenergy-storage.news
  121. 133India’s Delectrik Systems awarded 120MWh long-duration vanadium flow battery contract in Gujaratenergy-storage.news
  122. 134BESS already reducing curtailment in Chile, says ACERA; in-construction projects to triple capacityenergy-storage.news
  123. 135ADS-TEC Energy Advances One of Europe’s Largest Battery Storage Projects as Building Permit Nearsfinance.yahoo.com
  124. 136ADS-TEC Energy expects permit shortly for ~1 GW plant | ADSE SEC Filing - Form 6-Kstocktitan.net
  125. 137Germany moves forward with plans for one of Europe's largest battery storage projectsreview-energy.com
  126. 138ADS-TEC Energy nears permit for 1GW battery storage facility in Germany - News – Goalfore Advisory - China's Leading Advisory Firm Specializing in Global Infrastructurenews.goalfore.com
  127. 139ADS-TEC Energy Advances 1GW Battery Storage Power Plant at Pulverdingen Substation in Germany - News – Goalfore Advisory - China's Leading Advisory Firm Specializing in Global Infrastructurenews.goalfore.com
  128. 140BW ESS acquires an 800 MWh battery storage portfolio from Recurrent Energy in Francereview-energy.com
  129. 141Recurrent Energy Completes Sale of Two 100 MW / 400 MWh BESS Projects in France to BW ESSprnewswire.com
  130. 142Greenvolt to sell 1.6 GWh of BESS in Poland to A&R Investmentssolarbytes.info
  131. 143Recurrent Energy sells 200 MW/800 MWh BESS projects in France to BW ESSkucoin.com
  132. 144Greenvolt Power agrees to sell 400 MW/1.6 GWh Bess Projects to A&R Investments - Powerpower.greenvolt.com
  133. 145Canadian Solar (NASDAQ:CSIQ) Unit Recurrent Energy Closes 200 MW/800 MWh French BESS Sale to BW ESSkalkine.com.au
  134. 146Batteries are big at All Energy Australia 2026 - pv magazine Australiapv-magazine-australia.com
  135. 147Virtual power plants explained: what Australian installers need to know - pv magazine Australiapv-magazine-australia.com
  136. 148CATL TENER+ BESS gets global debut while deep interest in TENER Sodium grows - pv magazine Australiapv-magazine-australia.com
  137. 149AlphaESS: more than a decade of commitment to Australian storage - pv magazine Australiapv-magazine-australia.com
  138. 150Snowy 2.0 will still be cheaper than relying on batteries for storage - pv magazine Australiapv-magazine-australia.com
  139. 151Sigenergy unveils 401 kWh all-in-one battery for C&I sites - pv magazine Australiapv-magazine-australia.com
Contents
  1. 011. Key takeaways from the window
  2. 022. Lithium and storage-cell prices
  3. 033. System, EPC and tender prices
  4. 044. Manufacturers — Q3 results and shipments
  5. 055. Capacity, orders and supply chain
  6. 066. Technology — solid-state, sodium-ion and beyond lithium
  7. 077. China projects, tenders and policy
  8. 088. Overseas markets
  9. 099. Outlook and what to watch
  10. 1010. References

1. Key takeaways from the window

Between 23 October and 2 November 2026, lithium fell again, the first Q3 results showed where margins are being squeezed, and most of the new orders and plans were still intent rather than operating capacity. The five conclusions below summarise Chapters 2–8. Events dated before 23 October are labelled as context where they appear.

Document cover: the deck's cover visual.
Document cover: the deck's cover visual.

1. Lithium carbonate made its next leg down, but the cell price data in the material has barely moved. SMM's spot average bounced to RMB 100,050/t on 28 October (range 97,700–102,400), then fell to about RMB 90,000/t on 30 October, roughly 38% below its Q3 average of RMB 147,500/t. UBS (estimate) sees no rebound before year-end, with cost support near RMB 80,000/t. Benchmark's 314 Ah EXW China cell fell only 1.8% in Q3, to US$54.21/kWh in September, and the material holds no in-window InfoLink or SMM cell quote, so pass-through is not yet observable [Chapter 2].

2. System prices show up as award values, not quotes, and the one GWh-scale China award is unsigned. Wuhan Tianyuan's consortium confirmed its award notice on 26 October for the 1 GW / 4 GWh Lingwu project at CNY 3.64 billion, an implied RMB 0.91/Wh that covers equipment and construction, with no contract signed. TD Research's July 4-hour system average was RMB 0.58/Wh (context). The battery export VAT rebate is 6% and is cancelled from 2027-01-01, and Intertek CEA says Q2 shipments of about 230 GWh (+18%) were lifted by pre-stocking [Chapters 3, 5].

3. Q3 results split the field: storage volume is up, margins and cash flow are mixed. Samsung SDI reported revenue of KRW 4.69 tn (+52.6%) and 60 GWh of ESS orders. EVE's nine-month storage shipments were 67.52 GWh (+39.46%), with Q3 implied at 23.06 GWh, about 4.2% below Q2. Sungrow's nine-month net profit fell 44.46% and its Q3 gross margin dropped to 29.45% from 38.62%. BYD's Q3 profit of RMB 10.02 bn was 12% to 23% below broker expectations [Chapter 4].

4. New chemistries stayed at sample or plan stage; the scale gains were in format. CATL says pilot production of all-solid-state cells starts in 2027, from 20 Ah samples. Samsung SDI supplied samples to humanoid customers in September and targets H2 2027. Peak Energy's 4 GWh sodium-ion plant is planned for production in Q1 2027 and is not yet producing. The concrete gains, CATL's roughly 9 MWh TENER+ container and Envision's 790 Ah cell, are vendor claims [Chapter 6].

5. Orders and projects were mostly intent: pipeline outran operating capacity, and China's policy news is a draft. The only signed order with a stated volume was Samsung SDI's 1 GWh with Alpha Omega Power, while two MoUs added 5 GWh. India's CEA puts operating storage at 5.3 GWh against 185 GWh under development, and SECI issued a 4 GW / 16 GWh RfS on 28 October. NDRC's spot-market rules are a draft, open for comment to 2026-11-18, with a proposed start of 2027-01-01 [Chapters 5, 7, 8].

1.1 What moved at a glance

Item Value Date Source
SMM battery-grade lithium carbonate, spot average RMB 100,050/t (97,700–102,400) 28 Oct 2026 SMM
SMM lithium carbonate spot, approximate Around RMB 90,000/t; about 38% below Q3 average of RMB 147,500/t 30 Oct 2026 SMM
Benchmark LFP 314 Ah cell, EXW China US$54.21/kWh; Q3 vs end-June −1.8% Sep 2026 (publication date not stated) Benchmark
Lingwu, Ningxia shared-storage award, 1 GW / 4 GWh CNY 3.64 bn (US$535 m); implied RMB 0.91/Wh; contract unsigned Award notice 26 Oct 2026 ESS News
Samsung SDI Q3 revenue / ESS orders KRW 4.69 tn (+52.6%) / 60 GWh (nine months) 29 Oct 2026 ESN
EVE Energy storage-cell shipments 67.52 GWh, nine months (+39.46%) 23 Oct 2026 ESS News
Sungrow nine-month net profit RMB 6.599 bn (−44.46%) 30 Oct 2026 Cailian via moomoo
SECI standalone BESS RfS (Rajasthan, Gujarat) 4 GW / 16 GWh; RfS issued 28 Oct 2026 SolarQuarter
NDRC draft Basic Rules for Electricity Spot Markets Comments to 18 Nov 2026; proposed start 1 Jan 2027 Released 19 Oct 2026 (context) CNESS; Sohu

2. Lithium and storage-cell prices

Chapter 1 summarised the window; this chapter follows the first thread, lithium carbonate's next leg down, and asks how much of it reached storage-cell prices.

2.1 Lithium carbonate: timeline and drivers

Table 2-1. Battery-grade lithium carbonate, 2026 (RMB/t; "window" = 23 Oct–2 Nov)

Date Value Type and publisher Window?
13 May Spot high 200,500 (SMM); GFEX benchmark-contract high 210,580 (Market Index) Spot; futures Context
Q3 Average 147,500 (Q2: 171,900; −14.2% QoQ) SMM spot quarterly average Context
22 Oct GFEX benchmark close 94,180 Futures, Market Index Context
23 Oct GFEX benchmark close 97,280 Futures, Market Index Window
26 Oct Avg 98,300 (96,400–100,200); LC2701 settlement 95,280 (+1.58%) SMM spot; futures Window
27 Oct Avg 99,350 (97,000–101,700); LC2701 close 98,500 SMM spot; futures Window
28 Oct Avg 100,050 (97,700–102,400); LC2701 close 93,300, settlement 96,460 SMM spot; futures Window
30 Oct "Around 90,000" SMM spot, approximate Window
2 Nov Spot "edged down by 100"; level not in the material SMM headline Window

Core claim: Spot carbonate bounced for three sessions to RMB 100,050/t on 28 October, then fell to about RMB 90,000/t by 30 October, roughly 38% below SMM's Q3 average. Brokers see no early recovery, while the only cell series in the material fell just 1.8% in Q3.

The three-day rebound was technical. On 28 October LC2701 (SMM's most-traded contract) hit 101,520, fell to 92,320 and closed at 93,300, a 9,200 range, on volume up 17.6% to 398,200 lots and open interest up 9,791 to 448,900. SMM read this as bears in control, with upside "likely capped". Futures and spot answer different questions: SMM's spot figure is a quote-range average, and futures settlement differs from the close (96,460 vs 93,300 on 28 October). Market Index's 23 October close (97,280) does not reconcile with SMM's series, which implies a 23 October settlement of 93,800 (95,280 − 1,480). The contract month in Market Index's series is not stated, so this chapter follows SMM for 26–28 October.

Drivers, per the material: ore arrivals are rising and cathode schedules are weakening. Bald Hill and Finniss are returning, and a Mt Marion expansion is approved. Argentina's September carbonate exports were 10,600 t (+25.99% month on month, SMM flash, 2 November). Broker views are estimates, via Market Index:

Broker (date) Demand growth 2026 / 2027 Other view Source
UBS, Sky Han (26 Oct) 26% / 19% BESS destocking is the key driver; supply growth ~18% to 25%; no rebound before year-end; cost support ~RMB 80,000/t Market Index
Canaccord (23 Oct) 29% / 16% 2026 demand raised 14% to 1.8 Mt LCE on BESS; mine supply +1.35 Mt LCE to 2030 Market Index

Macquarie, also cited by Market Index, sees GFEX near the cost curve's upper end (~105,000) and the next support near 80,000. The material has no Canaccord spodumene forecast. It gives only SC6 spot at US$1,540/t on 22 October (context).

2.2 Storage-cell prices: what the material supports

The material contains no InfoLink or SMM weekly quotes for 100, 280 or 314 Ah cells dated in the window. The InfoLink pages retrieved are 2020 and 2021 archive items, and SMM's daily reviews cover carbonate only. The weekly table is therefore not built. The one dated cell series is Benchmark's Q3 2026 review. Its publication date is not stated, and it covers July–September, so it is context.

Table 2-2. Benchmark LFP prismatic 314 Ah cell prices (US$/kWh)

Month, 2026 EXW China CIF Europe CIF North America
Jul 57.75 (+4.6%) 67.11 (+4.3%) 64.99 (+4.4%)
Aug 53.15 (−8.0%) −7.4% −7.6%
Sep 54.21 (+2.0%) 62.97 (+1.3%) 64.78 (+7.4%)
Q3 vs end-June −1.8% −2.2% −4.1%

All figures are from Benchmark. Its Sep change leaves CIF North America about 20% above EXW China and Europe about 16%, which Benchmark attributes to China-to-US freight. Standard LFP prismatic cells in China fell 5.1% to 57.37, and the global Li-ion price fell 4.0% to 71.85. At RMB 6.80/US$, implied by ess-news converting CNY 3.64 bn to US$535 m, EXW China is RMB 0.393/Wh in July (57.75 × 6.8 ÷ 1,000) and RMB 0.369/Wh in September. TD Research's July tender-award cell price was about RMB 0.39/Wh (range 0.37–0.43). That is a consistency check only, since tender awards and assessed ex-works prices are defined differently (see Chapter 3).

2.3 Why cells move more slowly than lithium

Between SMM's Q2 and Q3 averages carbonate fell 14.2%, while EXW 314 Ah fell 1.8%, about one-eighth as much. The bases differ (quarterly average vs quarter-end), so read this as an order of magnitude. Four mechanisms appear in the material.

Value chain with H1 gross margins by stage and the four mechanisms that slow the pass-through from lithium to cells.
Value chain with H1 gross margins by stage and the four mechanisms that slow the pass-through from lithium to cells.
  • Lag. Benchmark says July's cell spike reflected June's lithium. The 16 September carbonate drop came too late for the 30 September assessment, so it expects lagged cuts in Q4.
  • Margin gradient. SMM's H1 gross margins: lithium mining up to 74%, salt processing 27–42%, cathode 5–14%, cells 12–23%. Q3 single-quarter profit fell 43% (Tianqi), 68% (Ganfeng) and 83% (Tianhua) quarter on quarter, while Salt Lake, with its own low-cost resources, fell about 12%.
  • Inventory and contracts. Dynanonic's inventory was RMB 2.26 bn, up 82% since the start of the year. Its operating cash flow was −RMB 2.14 bn for nine months despite a 213% profit rise. SMM notes that goods shipped at locked prices may later reverse impairments. Buyers also waited for long-term contract arrivals. SMM adds that to hold revenue after a one-third price fall, volume must rise nearly 50% (1 ÷ (1 − 1/3) = 1.5).
  • Policy floors. A 2% battery consumption tax has been in effect since 1 September 2026, and Benchmark lists whether producers absorb it as a Q4 watch item. China's pause on new cell-capacity approvals, reportedly in place since mid-May and public only in September, is under review to conclude by year-end. Intertek CEA, via ess-news (27 October), says Q2 shipments rose 18% on pre-stocking before the export VAT rebate ends on 1 January 2027 (upcoming), and expects that removal to soften cost deflation. See Chapters 3 and 5.

2.4 What it means for buyers

This is description, not procurement advice.

  • Spot and cell quotes are on different clocks. Spot is about 38% below its Q3 average, but the only cell evidence is a September low of US$54.21/kWh (EXW China). How much of the October fall reaches cells is not yet observable in the material.
  • Floors are estimated, not guaranteed. UBS and Macquarie both cite about RMB 80,000/t. At 90,000, that is a further 11% (90,000 → 80,000). SMM sees buyers' interest at 90,000–95,000 on 27 October.
  • Terms matter as much as levels. Tax treatment, delivery basis (the North America premium) and lithium-linked pricing determine what a quote means.
  • Data to watch. New InfoLink and SMM weekly cell prints, the Q4 pass-through Benchmark expects, and SMM's later daily reviews.

3. System, EPC and tender prices

Chapter 2 followed lithium carbonate and cell prices; this chapter asks how much of that move had reached systems and contracts by 2026-11-02, and finds that the window offers award values, not weekly system quotes.

3.1 System price snapshot: a thin window

The two quotes this chapter was meant to anchor on are not in the source material. These are SMM's 2026-10-23 DC-side 5 MWh price and InfoLink's 2-hour liquid-cooled system price. The InfoLink page that was retrieved is a September 2020 PV update (not storage). We therefore give no in-window weekly system price and do not backfill one. The latest China system series in the material is TD Research's July 2026 review, which is context, not a window event, and its publication date is not stated.

Item (China) Price US$/kWh at RMB 6.80 Date Source
4-hour system, weighted average RMB 0.58/Wh (−13.4% MoM; range 0.50–0.63) 85.3 July 2026 data (context) TD Research
2-hour system, average RMB 0.53/Wh 77.9 July 2026 data (context) TD Research
Lingwu 1 GW / 4 GWh award, implied RMB 0.91/Wh 133.8 Notice confirmed 2026-10-26 (window) ESS News

TD's headline cites a 4-hour EPC/PC price of RMB 0.54/Wh that the retrieved text does not reconcile with the RMB 0.58/Wh system average, so we use the body figures. TD projects (estimate) that the 4-hour average could fall below RMB 0.50/Wh if large projects such as the 1.2 GWh Hebei Jiaotou tender (bids RMB 0.510–0.544/Wh) clear at about RMB 0.53/Wh.

3.2 Award and tender datapoints, with the arithmetic

A consortium led by Wuhan Tianyuan won a CNY 3.64 billion tender for 4 GWh in Lingwu, Ningxia, which implies about RMB 0.91/Wh (US$0.134/Wh), but that figure covers equipment and construction, not batteries alone.

Event facts (ESS News, 2026-10-29, citing Wuhan Tianyuan's disclosure): the winning bid was published 2026-10-21 to 2026-10-23, and the company confirmed receipt of the formal award notice on 2026-10-26. No formal contract had been signed, and the split among the three consortium members was not disclosed. Award details belong to Chapter 7. The price workings are:

Datapoint Value Capacity Implied price (formula) Status and date Source
Lingwu, Ningxia shared storage (4 h) CNY 3.64 bn ($535 m) 1,000 MW / 4,000 MWh 3.64 bn ÷ 4,000,000 kWh = RMB 910/kWh = 0.91/Wh; ÷ 1,000,000 kW = RMB 3,640/kW Award notice, 2026-10-26; contract unsigned ESS News
Ningdong, Ningxia expansion (4 h) CNY 195 m 75 MW / 300 MWh 195 m ÷ 300,000 kWh = RMB 650/kWh = 0.65/Wh Signed contract, "earlier in October" (exact date not stated; context) ESS News

The RMB 6.80 rate used in these tables is implied by the article's own conversion: 3,640 ÷ 535 = RMB 6.80 per US$. The Lingwu contract covers design, civil works, a new 330 kV substation, about 4 km of transmission, commissioning and grid connection, plus a two-year warranty. That is a wider scope than the Ningdong "equipment supply and installation" contract. Against TD's July 4-hour system average of RMB 0.58/Wh, Lingwu is 0.91 ÷ 0.58 = 1.57×, or +57%. Ningdong is 0.65 ÷ 0.58 = 1.12×, or +12%. The months and scopes differ, so these ratios are indicative only.

Two further window items carry no usable price. BHEL's EPC pre-bid tie-up tender for a 200 MW / 400 MWh BESS at NTPC Mouda, India, is dated 2026-10-23 with bids due 2026-11-02, and the price bids are submitted separately and not published. ADS-TEC Energy (2026-10-28) puts total investment for its 1 GW / 4 GWh Pulverdingen project, still awaiting a building permit, at "several hundred million to one billion euros". That is an investment range, not a price: €1 bn ÷ 4,000,000 kWh = at most €250/kWh, including items beyond the system (Chapter 8).

3.3 US price outlook and the export-rebate effect

According to ESS News (via pv magazine USA, 2026-10-27), Intertek CEA's ESS Price Forecasting Report (Q3 2026) projects US DC-block prices to fall about 15% to 30% by 2030, against reductions above 40% in import markets as Chinese makers move to larger cell formats. This is a forecast (estimate), reported second-hand; the report itself is not in the material. The article points to trade barriers, tightening "covered foreign entity" definitions and Section 45X compliance as the reasons for the gap.

China's battery export VAT rebate is in force at 6% and scheduled to end. Announcement No. 2 of 2026 of the Ministry of Finance and State Taxation Administration, published 2026-01-08 (context, not a window event), cut the battery rebate from 9% to 6% from 2026-04-01 to 2026-12-31 and cancels it from 2027-01-01 (upcoming). The applicable rate is set by the export date on the customs declaration. The material has only secondary reprints of the announcement, not the Ministry text. Intertek says Q2 2026 shipments of about 230 GWh (+18% QoQ) were boosted by pre-stocking ahead of the 2027-01-01 date, and expects the removal to "soften the pace of cost deflation heading into 2027".

Company statements in the window point the same way. Pylontech and Zhuhai CosMX Battery, reporting Q3 on 2026-10-23, each named export-tax-rebate changes as a profit drag (via EnergyTrend). For scale, our upper-bound estimate is: 6% × US$54.21/kWh (Benchmark's September EXW China 314 Ah cell price, Chapter 2) = about US$3.3/kWh, if the whole rebate were absorbed on the cell value. The real pass-through is not in the material.

3.4 Implications

  • Award prices are the live signal: with system quotes absent, Lingwu's RMB 0.91/Wh turnkey figure and TD's RMB 0.50–0.63/Wh July system range bracket what China projects were being priced at.
  • Gap to the US: Intertek's forecast implies a persistent price gap between the US and import markets through 2030.

Gaps: no SMM 2026-10-23 DC-side quote, no in-window InfoLink system quote, and no in-window CNESA or TD EPC series. This review does not give investment, procurement or legal advice.

4. Manufacturers — Q3 results and shipments

Chapter 3 covered system, EPC and tender prices; this chapter checks how that pressure appears in what manufacturers reported between 2026-10-23 and 2026-11-02. The cninfo, HKEX and KRX originals are not in the material, so every figure is company-reported but relayed by the outlet named in each row, unless marked estimate.

4.1 Results at a glance

Company Metric (period) Value YoY Date Source (company-reported)
Samsung SDI Revenue (Q3) KRW 4.69 tn (≈US$3.5 bn) +52.6% 2026-10-29 ESN
Samsung SDI Operating profit (Q3) KRW 407.8 bn n/a 2026-10-29 ESN
Samsung SDI ESS orders (9M) 60 GWh n/a 2026-10-29 ESN
EVE Energy Group revenue (Q3) RMB 27.70 bn +64.56% 2026-10-23 BigGo
EVE Energy Storage-cell shipments (9M) 67.52 GWh +39.46% 2026-10-23 ESS News
Sungrow Net profit attributable (9M) RMB 6.599 bn −44.46% 2026-10-30 Cailian via moomoo
BYD Revenue (Q3) RMB 221.49 bn +13.59% 2026-10-29/30 TipRanks
BYD Net profit attributable (Q3) RMB 10.02 bn +28.08% 2026-10-29/30 TipRanks

Q3 split the field. EVE and BYD grew profit on higher volume, while Sungrow's nine-month profit fell 44.46% and its Q3 gross margin dropped 9.17 points in one quarter.

4.2 Samsung SDI and Korean makers

Samsung SDI announced Q3 on 2026-10-29 (the ESN article of 10-30 says "yesterday"). Revenue was KRW 4.69 tn, against KRW 3.05 tn a year earlier and KRW 3.77 tn in Q2; operating profit of KRW 407.8 bn is a margin of 407.8 / 4,690 ≈ 8.7%. The Battery Business earned KRW 361.9 bn on KRW 4.41 tn (+55.3%), which the company ties to ESS and battery-backup sales linked partly to AI data centres. The quoted growth rates do not match the rounded figures (4.69 / 3.05 = +53.8%, not +52.6%); we use the stated rates. ESN gives US$3.5 bn without a rate, implying about KRW 1,340/US$ (4.69 tn / 3.5 bn), so operating profit is roughly US$0.30 bn at that rate.

The 60 GWh is orders in nine months per ESN, not shipments or revenue, and customers are not itemised; the earnings-call highlights word it as "more than 60 GWh through October" (mostly US utility), which we treat as the same figure at a slightly later cut-off. The company said US LFP capacity reached 30 GWh a year at Q2 (context), that it will make LFP cells at its Indiana SynergyCells plant (100% owned since August), and that prismatic LFP mass production recently began at StarPlus Energy (ESN gives no date; the call highlights say early October 2026, see Chapter 5). It expects the ESS market to "maintain momentum" in Q4. The Alpha Omega agreement is in Chapter 8 and capacity lines in Chapter 5. The material has no Q3 figures dated in the window from LG Energy Solution or SK On.

4.3 Chinese makers: EVE, Sungrow, BYD and others

EVE Energy reported on the evening of 2026-10-23; ssg.events dates the CNINFO posting 10-24, and we follow 10-23. The +64.56% is group revenue (power, storage, consumer), not storage. Nine-month net profit was RMB 5.24 bn (+86.11%), but operating cash flow fell 65.37% to RMB 1.698 bn. Storage shipments of 67.52 GWh now exceed EV-battery shipments of 66.17 GWh (+91.30%). With H1 at 44.46 GWh and Q2 at 24.08 GWh, Q3 was 67.52 − 44.46 = 23.06 GWh, down (23.06 / 24.08 − 1) ≈ 4.2% on Q2. Management said Q4 capacity is fully booked and Q1 2027 schedules are not finalised (company says, 10-23). No Q3 storage margin is disclosed; the latest is H1 (context): RMB 15.09 bn revenue at 12.51% gross margin.

Sungrow reported on 2026-10-30: nine-month revenue RMB 48.863 bn (−26.41%); Q3 revenue RMB 17.95 bn (−21.51%, a narrower fall); Q3 gross margin 29.45% against 38.62% in Q2. Implied H1 revenue is 48.863 − 17.95 = RMB 30.91 bn. The material lacks Sungrow's Q3 net profit, storage GWh and the Q4 storage-shipment guidance (above 20 GWh) the blueprint expected. EnergyTrend lists Sungrow, BYD, Deye, HyperStrong and Gotion as reported, but only Sungrow's profit is visible; for Deye the material holds only its 2026-10-14 forecast (context): nine-month net profit RMB 4.22–4.32 bn, +79.81% to +84.07%.

BYD filed with HKEX on 2026-10-29 (Electrek); BitAuto says 10-30. Reuters-polled brokers expected Q3 profit of RMB 11.4–12.95 bn, so the RMB 10.02 bn result was about 12% to 23% below that estimate: (10.02 − 11.4) / 11.4 and (10.02 − 12.95) / 12.95. Nine-month revenue was flat at RMB 566.30 bn and net profit fell 4.2% to RMB 22.34 bn; Q3 exports were 550,704 vehicles (+137%) and inventory is up 60% since January. Electrek's calculated Q3 gross margin is about 18.0% (media-derived). The material has no BYD storage-segment figure.

Others. Great Power (10-26): Q3 revenue RMB 6.888 bn (+109.98%), net profit RMB 362 m (+78.55%), a net margin of 5.3%, against (1,178 − 362) / (17,866 − 6,888) ≈ 7.4% in H1; it links higher inventory write-downs to the lithium-carbonate fall and consumption tax. Kstar (10-26): Q3 net profit RMB 211 m (+10.97%). Context from the previous issue: CATL's Q3 gross margin fell from 23.15% to 20.69% (10-20); Tesla's energy revenue fell 16% on 13.7 GWh (10-21).

4.4 Rankings

CATL says SNE Research ranks it first globally in storage-battery shipments for H1 2026, a fifth straight year at the top; this is relayed on CATL's newsroom on 2026-10-26, the SNE date is not stated, and no volumes or lower ranks are given. ESS News places EVE among the three largest storage-cell suppliers with CATL and Hithium, without naming the ranking. The material contains no TD Research September ranking, so none is shown.

5. Capacity, orders and supply chain

Chapter 4 showed what the manufacturers earned in Q3; this chapter asks where their volume is going, which factories are being built for it, and which US rules decide whose cells qualify.

5.1 Order book: one signed contract, two MoUs

Company Customer GWh Type Date Source
Samsung SDI Alpha Omega Power (US IPP) 1.0 new; 1.5 cumulative Signed contract, value not disclosed 2026-10-26 Business Wire
LG Energy Solution Energix (Israel-HQ developer) ~2 (1.5 Europe + 0.5 US) over 24 months; talks on 4.5 Non-binding MoU 2026-10-27 LGES newsroom
CATL Intilion (Germany, Switzerland, Austria) 3 over 5 years MoU 2026-10-27 CATL newsroom
EVE Energy Fluence up to 206 (16 firm 2027 + 190 reserved 2028–31) Framework agreement; context Sept 2026 ESS News

In the window, the only order with a stated volume that was a signed contract was 1 GWh. The two MoUs add 5 GWh (2 + 3) of non-binding intent, or 6.5 GWh if LGES's 4.5 GWh upside is counted.

The AOP cells come from the StarPlus Energy (SPE) plant in Kokomo, Indiana, for delivery by end-2026. SMM and SolarBytes describe the LGES deal as "up to 4.5 GWh by 2028"; the company release says about 2 GWh over 24 months with 4.5 GWh only under discussion, and we follow it. The Intilion headline mentions sodium-ion, but the body names only CATL's Tener systems, so the chemistry of the 3 GWh is not stated. CATL's Tener+ launch on 2026-10-28 disclosed no order (see Chapter 6). EnergyTrend roundup headlines ("nearly 2.2 GWh", 2026-10-26; "over 3.3 GWh" overseas, 2026-10-28) lack contract status and are not added. The material has no window item on Hithium's long-duration cell orders.

5.2 Capacity moves: top-tier lines are full, many expansions are plans

Company Site Capacity Stage (vs 2026-11-03) Date Source
Deye Energy Storage Cixi Binhai 16 GWh C&I line (7 + 9 GWh phases) Phase II land won for RMB 103.587m; agreement signed 2026-06-23; not built Announced 2026-10-22 (context); EnergyTrend 2026-10-26 Deye via EnergyTrend
Samsung SDI SPE, Kokomo, Indiana ESS LFP line; two more from H1 2027 Mass production since early Oct 2026 2026-10-29 Call highlights
Samsung SDI SynergyCells, New Carlisle (27 GWh) ESS LFP Wholly owned since Aug 2026; mass production plan H2 2028–early 2029 2026-10-29 —
Gotion Lujiang 200,000 t/yr cathode material Full production 2026-10-29 SMM
Sigenergy–Failte India, site not chosen Inverter plant, then ESS plant; size not stated Reported, approvals in progress 2026-10-23 Reuters via EnergyTrend

Samsung SDI said on its Q3 call (page dated 2026-10-29) that more than 60 GWh of orders through October keep the SPE and Ulsan lines full through 2028, and that orders for the two extra LFP lines are secured. EVE said on 2026-10-23 that Q4 capacity is fully booked. CATL says, citing PV Tech Research, that utilisation stayed above 90% in H1 2026.

Deye's "100M yuan" headline is the land price (RMB 103.587m); total project investment is not stated. Sigenergy's plan comes from an expo interview, not a company announcement; its USD 250m ≈ RMB 1.68bn implies about 6.72 RMB/US$ (1,680 / 250). The material has no window item on LG Energy Solution's North American lines or a ">50 GWh" target; its only LGES capacity figure is Intertek CEA's 33 GWh across three factories.

5.3 US supply chain and restrictions

Intertek CEA's Q3 2026 report, carried by ESS News (from pv magazine USA) on 2026-10-27, says about 11% of announced 2026 US production capacity may slip into 2027 (line conversions, qualification, capital). Korean cathode makers L&F, Posco and EcoPro have announced about 23 GWh of LFP cathode capacity for 2026, enough for nearly 40% of US demand if fully realised (estimate). Because cathode is a main barrier to Section 45X compliance, Intertek expects tax-credit eligibility to split the market into price tiers.

Rule Threshold Status on 2026-11-03 Source
Prohibited foreign entity (PFE) test; "FEOC" is the older term One specified entity ≥25%; combined ≥40%; debt ≥15%; licence signed or amended on or after 2025-07-04 In effect China Prospect
Material assistance cost ratio, §48E storage 55% (construction begins 2026); 60% (2027) 55% in effect; 60% upcoming China Prospect
Treasury "effective control" guidance Due 2026-12-31 Upcoming; none published when page checked China Prospect

China Prospect is secondary and undated. The test turns on who owns or controls the maker, not where the cell is made. Cells are 52.0% of grid-scale direct cost in the IRS interim table, so cells from a PFE leave a ratio of 100 − 52.0 = 48%, below 55% (the source's arithmetic). The LGES–Energix MoU contemplates US-made FEOC-compliant systems; Samsung SDI says it is the only non-Chinese prismatic ESS supplier in North America (company says). On Section 301, the material gives no storage-cell rate: a handbook blurb mentions "Section 301 forced labor duties of July 2026" without a number, and Intertek calls further tariffs "potential".

5.4 What over-capacity and pre-stocking mean for prices

China's pause on new cell-capacity approvals was first limited to BESS and extended to EV cells in September, within a review of total battery capacity expected to conclude by year-end, according to Benchmark. TradingView says the freeze began in mid-May and became public in September, citing Macquarie's concern that cell makers cut output further in November and December (broker view). The material holds no official document, so the pause is reported.

Pre-stocking is the other distortion. Intertek CEA counts about 230 GWh of Q2 2026 shipments among tracked suppliers, up 18% on Q1 (implied Q1 ≈ 230 / 1.18 ≈ 195 GWh), driven by buying ahead of the battery export VAT-rebate end on 2027-01-01. The rebate fell from 9% to 6% on 2026-04-01 and is cancelled from 2027-01-01 (MoF/STA Announcement No. 2 of 2026, via TKG). The material has no window-dated shipment data showing whether pre-stocking continued into Q4.

The result is two markets. Full order books at Samsung SDI, EVE and CATL give tier-1 suppliers pricing room, while Benchmark expects lagged lithium declines still to reach cell quotes (see Chapter 2). Credit-eligible or booked-out cells may therefore price differently from commodity LFP.

6. Technology — solid-state, sodium-ion and beyond lithium

Chapter 5 tracked the capacity and orders filling today's lithium-ion lines; this chapter asks which technologies beyond them moved between 23 October and 2 November 2026, and at what stage.

6.1 Readiness table

Technology Company Milestone Stage (as of 2026-11-03) Date Source
All-solid-state (sulfide) CATL 20 Ah samples; small-batch pilot 2027 Sample; pilot planned 2026-10-27 Electric Viking
All-solid-state Samsung SDI Samples Sept 2026; humanoid target H2 2027 Sample (customer evaluation) 2026-10-29 TradingView/GuruFocus
Solid-state (polymer) Sunwoda Customer sample testing Sample 2026-10-30 XenoSpectrum
Sulphide electrolyte Solid Power MOBIUS 45 mt/yr line Commissioning; operation Q4 2026 2026-10-26 SMM
Lithium sulfide Tianqi Lithium 50 mt/yr pilot line Under construction; end-2026 plan 2026-10-28 SMM
Solid-state Li-metal QuantumScape 100 MWh line, cells from 2028 Plan (pilot line operating) 2026-10-21, context EnergyTrend
Sodium-ion BESS Peak Energy 4 GWh Sacramento plant Plan; production Q1 2027 2026-10-21 (context); reported 10-23 ESS News
Sodium-ion BESS CATL TENER Sodium >30 MWh per system Vendor claim: mass-produced 2026-10-28 pv magazine Australia
Large-format LFP Envision AESC 790 Ah cell, Renqiu tender win Awarded; commissioning end-2026 2026-10-29 EnergyTrend
9 MWh container CATL TENER+ Global launch Launched (vendor claim) 2026-10-28 pv magazine Australia
Vanadium flow Delectrik 20 MW/120 MWh, 6 h Awarded 2026-10-27 Energy-Storage.news

Core claim: in this window no solid-state cell went beyond the sample stage or a 2027 pilot plan, and sodium-ion advanced mainly as demonstration slices and a US plant not yet built. The concrete gains were in format: a 9 MWh container and a 790 Ah cell.

Readiness stages of solid-state, sodium-ion and format innovations: sample, plan, awarded or launched.
Readiness stages of solid-state, sodium-ion and format innovations: sample, plan, awarded or launched.

6.2 Solid-state: samples, pilot lines and dated targets

CATL told investors on its Shenzhen Stock Exchange platform on 27 October that pilot production starts in 2027; it has moved from a 10 Ah-class platform to 20 Ah samples with a team of over 1,000. The company says it targets about 500 Wh/kg and about 1% initial penetration. That density is not confirmed as a production specification, and no customer, output or vehicle date was disclosed. The "level 4 of 9" remark is not new: Notebookcheck attributes it to chairman Zeng Yuqun at Summer Davos, and Electrek (via UA.NEWS) dates it to June. Electrek calls the 20 Ah cells "pilot production"; other sources say samples, which we follow. East Asia Brief's uncorroborated extra details are not used.

Samsung SDI is the only maker in the window describing customer evaluation. On its Q3 call (page dated 29 October) EVP Han Jae Cho said cell and pack samples went to humanoid customers in September 2026, with commercialisation targeted for H2 2027. According to SMM, citing foreign media on 25 October, the target is 900 Wh/L, about 40% above liquid-electrolyte cells at roughly 650 Wh/L (900 ÷ 650 = 1.38), from a 6,500 m² Suwon pilot line; LG Energy Solution has pushed graphite-based solid-state to 2029. Sunwoda said on 30 October that design and process verification is complete and customer sample tests are under way, according to XenoSpectrum citing IT Home. It gave no customers, volumes or mass-production date, against a July 2024 outlook of 2026 mass production at 1 GWh; only a 0.2 GWh sample line is confirmed, one-fifth of that.

The materials chain moved too. Solid Power said on 26 October that its MOBIUS electrolyte line in Thornton, Colorado began commissioning: 45 mt/yr, taking SP2 capacity to about 75 mt/yr, a 150% rise (so 30 mt/yr before; 45 ÷ 30 = 1.5), with operation planned for Q4 2026. Tianqi Lithium said on 28 October that its 50 mt/yr lithium sulfide pilot will complete by end-2026, with samples at over 30 clients. QuantumScape's 100 MWh line (21 October, context) is a construction plan.

Judgement: every solid-state item here is a sample, pilot line or dated target; none is capacity a storage buyer can order.

6.3 Sodium-ion: backlog ahead of output

Peak Energy announced a US$108 m Series B led by GM Ventures on 21 October (context); ESS News reported it on 23 October. The 4 GWh Sacramento plant (capex about US$71 m, or US$17.75 per kWh of annual capacity: 71 ÷ 4,000) starts production in Q1 2027, and today's cells come from Chinese makers to Peak's specification. Peak says it holds over US$1 bn of orders, undisaggregated: Jupiter Power up to 4.75 GWh over 2027–2030, Energy Vault 1.5 GWh, and an RWE pilot. The only operating system is 3.5 MWh at SolarTAC since September 2025; Jupiter's maximum alone is about 1,360 times that (4,750 ÷ 3.5). The up-to-20% lower cost of energy is unverified.

CATL showed TENER Sodium in Australia for the first time at All-Energy on 28 October. CATL says it exceeds 30 MWh per system, with more than 10,000 cycles at 45 °C, 95% round-trip efficiency, over 20 years' life and over 10% lower total EPC cost than LFP containers — vendor claims. Elsewhere, Envision's Renqiu 100 MW/400 MWh tender win (29 October) is a 90% LFP / 10% sodium hybrid due by end-2026; the material does not say whether the split is by energy. The material has no dated Naxtra item in the window.

6.4 Long-duration and cell-format trends

CATL's TENER+ had its global launch at All-Energy Australia on 28 October: about 9 MWh per liquid-cooled container with a 25-year design life. CATL says it needs 40% fewer containers and a 35% smaller footprint. Against the 5 MWh containers Narada and Hysea deployed, 9 MWh gives 1 − 5/9 = 44% fewer containers; CATL's 40% implies a baseline near 5.4 MWh (9 × 0.6), so the claim is consistent.

On cells, Envision AESC's 790 Ah prismatic wound cell exceeds 2.5 kWh per cell, implying about 3.2 V (2,500 ÷ 790). Our material contains no dated Hithium 1,175 Ah or 1,300 Ah item, so we cannot place them. Beyond lithium, Delectrik was awarded a 20 MW/120 MWh six-hour vanadium flow project by GIPCL in Gujarat (27 October); Bondada reported a 20 MW/120 MWh EPC contract on 23 October, and the material does not say how the roles relate.

Judgement: format scale-up is the near-term cost lever; sodium-ion and solid-state remain dated claims, not procurement options.

7. China projects, tenders and policy

Chapter 6 covered which cell technologies are nearing production; this chapter turns to the Chinese projects and rules that decide where those cells get bought.

Core claim: the window holds one GWh-scale China award, the 1 GW / 4 GWh Lingwu project at CNY 3.64 billion, and its contract is still unsigned. The policy news is a draft: NDRC's spot-market rules, open for comment until 2026-11-18, proposed to start 2027-01-01. Neither is yet revenue.

7.1 Awards and tenders

Project Owner / winner MW / MWh Value Date and status Source
Lingwu, Ningxia, shared storage Owner Lingwu Huaxin Comprehensive Energy Service; Wuhan Tianyuan-led consortium 1,000 / 4,000 CNY 3.64 bn (US$535 m) Award notice confirmed 2026-10-26; contract not signed ESS News
Renqiu, Hebei, standalone Envision Energy Storage (LFP system) 100 / 400 Not stated Win announced 2026-10-29; completion planned end-2026 EnergyTrend
Yumen, Gansu, standalone shared Narada Power (builder, cell supplier) 200 / 800 (phase I 100 / 400) Not stated Phase I grid-connected, announced 2026-10-30 EnergyTrend

Lingwu is the window's largest award. A consortium of Wuhan Tianyuan (lead), Inner Mongolia Yinhe Electric Power Installation Engineering and Ningxia Communications Construction won the equipment supply and installation tender. The winning bid was published between 2026-10-21 and 2026-10-23, and Wuhan Tianyuan, Shenzhen-listed, confirmed the award notice on 2026-10-26. The scope covers equipment, design, civil works, commissioning, grid connection and a new 330 kV substation; chemistry and cell supplier are undisclosed. Grid-connection notice is due by 2027-04-30 and acceptance by 2027-10-30, with a two-year warranty.

The value works out at CNY 3.64 bn ÷ 4,000 MWh = CNY 0.91/Wh. This is an implied price for equipment plus construction, not a cell or system price. The US$535 m conversion implies about 6.80 CNY/US$ (3.64 ÷ 0.535); ESS News gives US$0.134/Wh. Chapter 3 compares it with other price series. The bid is 2.1 times Wuhan Tianyuan's 2025 revenue of about CNY 1.71 bn (3.64 ÷ 1.71). The company itself warns that payment terms are open, the split among consortium members is undisclosed, and the project may change or be delayed. Context: earlier in October (date not stated) a Wuhan Tianyuan subsidiary signed CNY 195 m for a 75 MW / 300 MWh Ningdong expansion, or CNY 0.65/Wh (195 m ÷ 300 m Wh) at a smaller scope.

The 2 November EnergyTrend "order" roundup is mostly agreements, not orders. Of its seven firms, only Envision's Renqiu win and Narada's Yumen grid connection are China projects. Renqiu is billed as one of China's first standalone demonstrations mixing LFP (90%) and sodium-ion (10%), with 790 Ah cells. Hoenergy signed a strategic cooperation agreement with Octopus Energy on 2026-10-30, covering equipment, digital energy and virtual power plants. It states no volume or value, so it is not an order.

The 30 October HKEX prospectus is RelyEZ's, and the material does not describe its business. RelyEZ Energy Storage Technology (stock code 9621) opened a global offering on 2026-10-30: 57,540,500 H shares at HK$8.54 to HK$11.10, or up to about HK$639 m at the top price (57,540,500 × 11.10). The offer closes 2026-11-04, pricing is expected 2026-11-05 and dealing 2026-11-09 (all upcoming). Proceeds are earmarked 45% R&D, 25% overseas expansion, 20% a Wuzhen factory and 10% working capital. The pages in the material give no GWh or standalone exposure, so we do not call it a standalone-storage issuer.

7.2 Policy changes and status

Policy What it does Status at 2026-11-03 Source
NDRC draft Basic Rules for Electricity Spot Markets Supports joint bidding by renewables and co-located storage (Art. 8); names new-type storage as a market entity; nodal pricing; daily clearing, monthly billing Draft, released 2026-10-19 (context); comments to 2026-11-18 (upcoming); proposed start 2027-01-01, valid five years Southern Energy Observer via CNESS; CSPPLAZA via Sohu
NDRC Document 136 (2025) Storage no longer a precondition for new-energy approval or grid connection In effect CNESA
NDRC Document 114 (2026) First national recognition of capacity value for new-type storage In effect; issue date not stated CNESA
MOF/STA Announcement No. 2 (2026) Battery export VAT rebate 9% to 6% from 2026-04-01; cancelled from 2027-01-01 6% in effect; cancellation upcoming TKG China reproduction
2% consumption tax, lithium-ion batteries Domestic levy In effect since 2026-09-01 Benchmark

The material does not contain NDRC's own announcement. Everything about the draft comes from trade and financial press, and a developer's web page repeats the dates. The draft makes joint bidding something NDRC "supports", not a requirement. Its economics will depend on provincial rules covering registration, revenue split and deviation penalties. Nodal pricing as the default (Art. 23) and a shift from difference-quantity to price-difference settlement (Art. 48) would widen the price spread that storage earns, and the draft also adds ramping as an ancillary service (Art. 42). Securities Daily frames this as three stacked revenue lines (energy, capacity, ancillary services) and lists open questions: capacity conversion, charge-discharge loss allocation and penalty responsibility.

Two timing points. The 2023 rules' stated validity ended 2026-10-15, yet the successor would start only on 2027-01-01, and the material does not say what applies in between. The southern regional spot market was planned to enter formal operation on 2026-10-24, but the material does not confirm that it did.

7.3 Market statistics

The material holds no TrendForce or CNESA monthly tender or award figure for September or October 2026, so none is shown. The one monthly series is TD Research's July review, which is context and carries no event date. It reports 26.0 GWh awarded, down 32.9% month on month and up 45.8% year on year. That implies a June base of about 38.7 GWh (26.0 ÷ 0.671). Four-hour projects took 61.6% of awarded capacity and average duration rose to 2.85 hours from 2.68 a year earlier. TD Research counts awarded project capacity; its prices belong to Chapter 3.

CNESA measures a different thing, installed capacity. In an interview dated 2026-10-12 (context), CNESA chairman Chen Haisheng gave 168 GW of cumulative new-type storage at June 2026. The interview's lead-in says "over 150 GW, +61%"; we follow the dated CNESA statistic. The July 2026 15th Five-Year Plan for the new power system sets 300 GW by 2030, with grid-side standalone storage adding 80 GW to 140 GW. From 168 GW, that means about 132 GW (300 − 168) over the remaining 4.5 years, roughly 29 GW a year. This is arithmetic on a target, not a forecast.

Our judgement: capacity pricing (Document 114) is in force, but the spot-market layer is not. Until provinces write detailed rules, rule text is a better guide to project returns than tender volume.

8. Overseas markets

Chapter 7 followed China's award and tender flow; outside China, the news of 23 October to 2 November 2026 shows the same gap between announced and operating capacity, so the tracker below keeps the stages apart.

Project Country MW / MWh Developer / supplier Stage Date Source
SECI standalone BESS, Rajasthan + Gujarat India 4,000 / 16,000 SECI (buyer); bidders open RfS issued 2026-10-28 SolarQuarter
Pulverdingen Germany ~1,000 / 4,000 ADS-TEC Energy Permit pending 2026-10-28 ADS-TEC (Business Wire)
TNPDCL solar + storage, Tranche XXI India 300 / 1,800 TNPDCL via SECI Regulator approved order 2026-10-22 SolarQuarter
Ełk + Turośń Kościelna Poland 400 / 1,600 Greenvolt to A&R Investments Built; sale agreed, not closed 2026-10-23 Greenvolt
ACME FDRE, Bikaner India 300 / 1,200 ACME Solar 781.4 MWh commissioned 2026-10-29 SolarQuarter
Samsung SDI supply to Alpha Omega Power US n/a / 1,000 Samsung SDI America Signed contract 2026-10-26 Samsung SDI (Business Wire)
Baixas + Coquainvilliers France 200 / 800 Recurrent Energy to BW ESS Sold; still in development 2026-10-29 Canadian Solar (PR Newswire)
GIPCL Vadodara flow battery India 20 / 120 Bondada (EPC); Delectrik (flow-battery start-up) EPC awarded (Bondada); award confirmed (Delectrik) 2026-10-23 / 27 SolarQuarter; ESN
Dandara phase 1 Egypt n/a / 100 (+569 MW solar) Scatec Financing agreed 2026-10-29 SolarQuarter

The tracker totals 26,620 MWh (ACME at its planned 1,200 MWh), of which only 781.4 MWh (2.9%) is commissioned. Every other row is tendered, permit-pending, financed, contracted or sold: pipeline is not operating capacity.

8.1 India: tenders outrun the fleet

On 28 October 2026 SECI issued an RfS for standalone BESS on a build-own-operate basis, according to SolarQuarter (the RfS itself is not in the material). Status: RfS issued. Package I is 2.5 GW / 10 GWh in Rajasthan and Package II 1.5 GW / 6 GWh in Gujarat, so 4 GW / 16 GWh in total, a four-hour design. Terms are a 20-year PPA with SECI, viability gap funding (VGF) of INR 15 lakh/MWh and at least 51% renewable charging power. VGF arithmetic: INR 15 lakh × 16,000 MWh = INR 2,400 crore (INR 24 bn), about US$253 m at the roughly INR 95/US$ implied by Energy-Storage.news' conversion of INR 90 bn to US$947.6 m (derived). Submission dates sit in a Notice Inviting Tender the material does not reproduce.

Operating capacity is small. Speaking at Energy Storage Summit India (reported 27 October), CEA's Prashant Bhamu put India at 5.3 GWh operating against 185 GWh under development; 5.3 ÷ 185 = 2.9%. SolarQuarter's 23 October page instead cites about 9.3 GWh installed, with no definition. We follow the CEA official. Bhamu said VGF of INR 90 bn supported 13.2 GWh (4 GWh was expected) and a separate 30 GWh scheme brings supported capacity to 43.2 GWh. Energy storage obligations for distribution utilities rose from 1% to 4%, and safety standards start in April 2027 (upcoming). SECI's Sivakumar Vopakomma said bidders per tender grew from six or seven to more than 20, but construction takes 15–18 months.

Individual projects show the stages. ACME Solar's Bikaner FDRE project reached 195.35 MW / 781.40 MWh, 65.1% of its planned 300 MW / 1,200 MWh, after a 35.77 MW / 143.08 MWh tranche with a scheduled COD of 29 October. TNERC's order of 22 October (one day before the window, reported 26 October) approved TNPDCL's purchase of 600 MW solar with a 300 MW / 1,800 MWh system (six hours) at INR 3.12/kWh plus a INR 0.07 SECI margin, or INR 3.19/kWh, on a 25-year PPA. Bondada Engineering won the EPC contract for a 20 MW / 120 MWh vanadium flow battery for GIPCL at Vadodara, with completion due 18 months from the notification of award; Delectrik separately confirmed its own award in the same GIPCL solicitation on 27 October; the material does not state how the two roles relate.

8.2 Europe: asset rotation, not new orders

ADS-TEC Energy said on 28 October that the authority confirmed its application for the Pulverdingen plant (about 1 GW / 4 GWh) complete and expects the permit shortly. Status: permit pending; construction has not started. Grid connection is targeted for 2029, and ADS-TEC intends to sell a majority stake in the project company. On 29 October Recurrent Energy (Canadian Solar) announced the sale of two 100 MW / 400 MWh projects, Baixas and Coquainvilliers, to BW ESS. The price is undisclosed. Recurrent keeps leading development to ready-to-build, so this is sold, not built. It is BW ESS's entry into France.

On 23 October Greenvolt agreed to sell the Ełk and Turośń Kościelna projects in Poland (2 × 200 MW / 800 MWh = 1.6 GWh) to A&R Investments, with closing expected by end-2026. Both were completed in Q3 2026 and hold 17-year capacity-market contracts from 2028, paying for 85% of rated capacity, plus 10-year tolling. The material has nothing dated in the window on Portugal's grid-access tender, Italy's MACSE derating, Bulgaria or Germany's nine-month installations.

8.3 Australia: conference confidence, delivery data

All-Energy Australia (Melbourne, 28–29 October) drew over 22,000 visitors, about 5,000 more than in 2025, according to organiser RX Global via pv magazine. The same article reports over 550,000 home batteries installed in 15 months under Cheaper Home Batteries, which subsidises about 30% of cost, with growth steadying. For grid scale, nine projects (2.3 GW / 7.1 GWh) came online in H1 2026, against 2 GW / 5.1 GWh in all of 2025 (7.1 ÷ 5.1 = +39%), and 13 projects (1.6 GW / 6.5 GWh) reached financial close; pv magazine does not name the source of these figures. Commercial storage is the next target. The SRES cap rose from 100 kW to 1 MW on 1 October (in effect), cutting qualifying upfront cost by about 20%. Sigenergy launched a 401 kWh C&I cabinet; its claim of 54.5 m² per 4 MWh is a vendor claim. CATL's 9 MWh TENER+ debut is covered in Chapter 6.

The material contains no CIS tender 8 result and no dated home-battery rebate step-down.

8.4 US, Chile, Middle East and Africa

Samsung SDI America signed a 1 GWh supply agreement with Alpha Omega Power on 26 October, taking the total to 1.5 GWh with a contract from late 2025. Status: signed contract. The Samsung Battery Box 1.7 uses NCA cells made at StarPlus Energy in Kokomo, Indiana, due for delivery by end-2026, with AOP construction in WECC and ERCOT starting in 2027. The 17% higher energy density than SBB 1.5 is a company claim.

In Chile, ACERA said on 26 October that 3.1 GW / 13.5 GWh is operating, with another 3.7 GW in testing while already dispatching, and operating capacity could triple within twelve months (ACERA projection).

In Egypt, Scatec signed loan agreements for phase 1 of Dandara: US$217 m non-recourse debt from EBRD, AfDB and EIB against US$271 m capex (217 ÷ 271 = 80%). Phase 1 pairs 569 MW of solar with a 100 MWh battery for Egypt Aluminium under a 25-year sovereign-guaranteed PPA, with COD targeted for H1 2028. Status: financing agreed, per SolarQuarter.

The material has nothing in the window on Saudi Arabia, Egypt's Nag Hammadi or Eskom.

9. Outlook and what to watch

Chapter 8 showed how far announced overseas capacity sits from operating capacity. This chapter turns the window into implications by reader. It adds no new facts: every figure is cited where Chapters 2–8 developed it, and none of it is investment, procurement or legal advice.

9.1 What changed, by reader

The common thread is a gap: between lithium and delivered prices, and between announcements and operating capacity.

Reader What changed Implication Evidence
Storage buyers Lithium spot fell to about RMB 90,000/t by 30 Oct; the only cell series in the material fell 1.8% in Q3 Spot and cell quotes run on different clocks; Benchmark expects lagged cuts in Q4, so tax treatment, delivery basis and lithium-linked terms decide what a quote means SMM; Benchmark
China developers and EPC firms One GWh-scale award (Lingwu, implied RMB 0.91/Wh, contract unsigned); NDRC spot rules still a draft Award prices include construction scope; revenue depends on provincial rules still to be written ESS News; CNESS; Sohu
Cell and system makers Samsung SDI cites 60 GWh of orders and EVE says Q4 capacity is fully booked, while Sungrow's Q3 gross margin fell to 29.45% from 38.62% Tier-1 cell suppliers have pricing room; margin pressure shows at integrator level ESN; ESS News; Cailian via moomoo
Overseas developers SECI issued a 4 GW / 16 GWh RfS; India has 5.3 GWh operating against 185 GWh under development Stage matters: in the tracker only 781.4 MWh of 26,620 MWh (2.9%) is commissioned SolarQuarter; ESN
US-exposed suppliers Prohibited-foreign-entity test in effect; 55% cost ratio in effect, 60% upcoming; Intertek says about 11% of 2026 US capacity may slip to 2027 Credit eligibility may split the market into price tiers China Prospect; ESS News
Technology scouts Solid-state at sample or 2027 pilot stage; sodium-ion plant not yet producing None is orderable now; format scale-up (9 MWh, 790 Ah) is the near-term lever Electric Viking; ESS News; EnergyTrend
Readers of company results SMM notes that nine-month totals still carry the first-half price rise, while Q3-only profit fell 43% (Tianqi), 68% (Ganfeng) and 83% (Tianhua) Single-quarter figures show the turn earlier than cumulative ones SMM

Judgement on prices. The lithium move has not finished passing through. UBS expects no rebound before year-end and both UBS and Macquarie point to support near RMB 80,000/t (estimates). Benchmark expects lagged declines to reach cell quotes. Against that, Intertek expects the end of the export VAT rebate on 2027-01-01 to soften cost deflation, and it ties Q2's 230 GWh of shipments (+18%) to pre-stocking. The material does not show whether pre-stocking continued into Q4.

Judgement on orders. The window's volume was mostly intent. One signed contract (1 GWh) sat beside two MoUs (about 5 GWh), and Samsung SDI says its SPE and Ulsan lines are full through 2028. Delivery, not demand, is the constraint to watch.

Core claim: The next 60 days will be settled by contract terms and rule text, not by chemistry: how far lithium's fall reaches cell quotes, whether NDRC's draft spot-market rules survive their comment period to 2026-11-18, and what changes when the export VAT rebate ends on 2027-01-01.

9.2 Buyer checklist

  1. Name the price type. SMM spot, futures settlement, Benchmark assessments and award values answer different questions (Chapter 2).
  2. Check the stage. An MoU, an RfS or a permit-pending project is not operating capacity.
  3. Confirm tax and delivery basis. The 2% consumption tax has applied since 1 September 2026, the export rebate is 6% until 2026-12-31, and Benchmark's September CIF North America cell price was about 20% above EXW China.
  4. For US projects, ask who owns the maker. The prohibited-foreign-entity test turns on ownership and control, not factory location.
  5. Mark vendor claims. TENER+ container savings and solid-state energy density are vendor claims.

9.3 Key dates

Status is judged against the run date, 3 November 2026.

Date Event State on Nov 3, 2026 Source
2026-04-01 Battery export VAT rebate cut from 9% to 6% In effect TKG China
2026-09-01 2% consumption tax on lithium-ion batteries In effect Benchmark
2026-10-01 Australia SRES cap raised from 100 kW to 1 MW In effect pv magazine Australia
2026-10-19 NDRC draft spot-market rules released Draft published CNESS
2026-10-26 Lingwu 1 GW / 4 GWh award notice confirmed Award notice confirmed; contract unsigned ESS News
2026-10-28 SECI 4 GW / 16 GWh standalone BESS RfS RfS issued SolarQuarter
2026-11-02 NTPC Mouda 200 MW / 400 MWh EPC tie-up bids due Closed; outcome not in the material BHEL via Embassy of India
2026-11-04 RelyEZ (9621) global offering closes Upcoming EnergyTrend
2026-11-05 RelyEZ pricing expected Upcoming EnergyTrend
2026-11-09 RelyEZ dealing expected Upcoming EnergyTrend
2026-11-18 NDRC draft spot-market rules, comment deadline Upcoming CNESS; Sohu
2026-12-31 Export VAT rebate at 6% ends; Treasury "effective control" guidance due Upcoming TKG China; China Prospect
End-2026 China cell-capacity approvals review expected to conclude Upcoming (reported) Benchmark
End-2026 Greenvolt Poland sale (1.6 GWh) expected to close Upcoming Greenvolt
2027-01-01 Export VAT rebate cancelled; NDRC draft proposed start Upcoming TKG China; Sohu
Q1 2027 Peak Energy 4 GWh sodium-ion plant, production start Upcoming (plan) ESS News
2027-04-30 Lingwu grid-connection notice due Upcoming ESS News
April 2027 India energy-storage safety standards start Upcoming ESN
H1 2027 Samsung SDI two further SPE LFP lines begin operation Upcoming (plan) TradingView/GuruFocus
2027 CATL all-solid-state small-batch pilot production Upcoming (plan) Electric Viking
H2 2027 Samsung SDI all-solid-state humanoid target Upcoming (target) TradingView/GuruFocus

10. References

This document draws on the following 80 sources, listed in the order they are first cited.

  1. SMM Lithium Carbonate Daily Review On October 28, spot lithium carbonate prices rose by 700 yuan/mt, while futures retreated after a rapid rise, falling on increased volume and open interest. - Shanghai Metals Market (SMM) — news.metal.com
  2. SMM Analysis Lithium Battery Q3 2026 Profit Divergence - Shanghai Metals Market (SMM) — news.metal.com
  3. Lithium's BESS hangover: UBS sees no rebound before year end — marketindex.com.au
  4. Battery Cell Price Review Q3 2026 — source.benchmarkminerals.com
  5. Consortium wins $535 million tender for 4 GWh storage project in China - Energy Storage — ess-news.com
  6. TD Research | July 2026 China BESS Tender Awards Review: 26.0 GWh Awarded; 4-Hour EPC/PC Price Reaches RMB 0.54/Wh — linkedin.com
  7. Industry Express | Cancellation of VAT Export Tax Rebates for Photovoltaic and Other Products - TKG China — tkgelectric.com
  8. US battery storage prices could fall up to 30% by 2030 - Energy Storage — ess-news.com
  9. Samsung SDI: 60GWh of ESS battery orders in 2026 so far, 53% year-over-year ‘revenue surge’ — energy-storage.news
  10. EVE Energy ships 67.52 GWh of storage batteries in first nine months of 2026  - Energy Storage — ess-news.com
  11. Sungrow Power Supply's Q3 Gross Margin Drops Nearly 9 Percentage Points Quarter-on-Quarter; Multiple Solar and Energy Storage Equipment Manufacturers Have Initiated Price Hikes | Financial Report Analysis — moomoo.com
  12. BYD (BYDDY) Q3 profit jumps 28% on exports, but inventory balloons 60% | Electrek — electrek.co
  13. CATL Advances 20 Ah Solid-State Battery Cells, Targets 2027 Small-Batch Production - The Electric Viking — theelectricviking.com
  14. Samsung SDI Co Ltd (FRA:XSDG) (Q3 2026) Earnings Call Highlights: Return to Profit on ESS Boom ... — TradingView News — tradingview.com
  15. Sodium-ion storage maker Peak Energy raises $108 million in GM-led round - Energy Storage — ess-news.com
  16. CATL TENER+ BESS gets global debut while deep interest in TENER Sodium grows - pv magazine Australia — pv-magazine-australia.com
  17. Intensive Energy Storage Order Updates from 7 Firms Including Narada Power and Envision Energy Storage - EnergyTrend — energytrend.com
  18. Samsung SDI and Alpha Omega Power Sign 1 GWh Supply Agreement for U.S.-Made Energy Storage — finance.yahoo.com
  19. Newsroom|LG Energy Solution — lgensol.com
  20. 3GWh!INTILION与宁德时代签约,钠电储能规模化出海 — catl.com
  21. India has 5.3GWh of operational BESS, with 185GWh under development, CEA official says — energy-storage.news
  22. SECI Issues Tender For 4 GW/16 GWh BESS Projects In Rajasthan And Gujarat With VGF - SolarQuarter — solarquarter.com
  23. 中国储能网 -国家政策 - 一文读懂新版《电力现货市场基本规则(公开征求意见稿)》 } — escn.com.cn
  24. 深度 | 2027年施行,新版电力现货市场基本规则对长时储能的影响_结算_收益_电价 — sohu.com
  25. ASX lithium crash: PLS, LTR, MIN face third bear market in a decade — marketindex.com.au
  26. SMM Lithium Carbonate Daily Review On October 26, spot lithium carbonate stopped falling and rebounded, ending its previous consecutive decline. - Shanghai Metals Market (SMM) — news.metal.com
  27. SMM Lithium Carbonate Daily Review Lithium Carbonate Futures and Spot Prices Rebound in Tandem on October 27 - Shanghai Metals Market (SMM) — news.metal.com
  28. Solid-state battery: Tinci Materials' hundred-mt-class sulphide solid-state electrolyte pilot line completed and trial production started, samples begin delivery - Shanghai Metals Market (SMM) — news.metal.com
  29. Prices hold steady ahead of the National Day; price negotiation to kick off after holiday — infolink-group.com
  30. Solar cell and module technology: Trends and outlooks-webinar-InfoLink Consulting — infolink-group.com
  31. ASX lithium crash: PLS, LTR, MIN face third bear market in a decade — TradingView News — tradingview.com
  32. Tender Ref: MANPBT0042 DT.23.10.2026: Pre bid Tie up/MOU for EPC package for development of 200MW/400MWh BESS at NTPC Mouda - Embassy of India, Tashkent — eoitashkent.gov.in
  33. ADS-TEC Energy nears final permit for 1 GW / 4 GWh battery project in Germany - Energy Storage — ess-news.com
  34. China's 2026 Export Tax Rebate Cut: Which Chemicals Changed — qiboch.com
  35. EVE Energy, Pylontech, and CosMX Report Q3 2026 Energy Storage Results - EnergyTrend — energytrend.com
  36. China's EVE Energy posts CNY 73.39 billion in first three quarters, power battery shipments up over 90% — BigGo Finance — finance.biggo.com
  37. BYD Delivers Strong Q3 2026 Profit Growth Amid Flat Year-to-Date Revenue - TipRanks.com — tipranks.com
  38. EVE Energy Q3 2026 revenue up 64.6% to RMB27.7bn; energy-storage cell shipments reach 67.5 GWh in nine months | SSG Events — ssg.events
  39. News - EnergyTrend — energytrend.com
  40. Deye Energy Storage Secures Cixi Phase II Land with 100M Yuan Investment for 9GWh Commercial & Industrial Energy Storage Production Line - EnergyTrend — energytrend.com
  41. BYD Q3 2026 results: Revenue rises 13.59% to RM 138.4 billion, net profit up 28.08%, overseas sales surge 90.7% | BitAuto Malaysia — bitauto.my
  42. Great Power, Sinexcel, and Kstar Announce Q3 2026 Financial Results - EnergyTrend — energytrend.com
  43. Tesla Q3 2026 energy storage revenues fall despite second-highest quarterly deployments — energy-storage.news
  44. CATL Retains Top AAA Rating in PV Tech’s Battery Storage Bankability Rankings — catl.com
  45. LG Energy Solution Signs MoU With Energix for Up to 4.5GWh of BESS Supply - Shanghai Metals Market (SMM) — news.metal.com
  46. Energix & LG Energy Solution sign 4.5 GWh battery storage MoU — solarbytes.info
  47. energy storage news - EnergyTrend — energytrend.com
  48. Samsung SDI Signs 1-GWh ESS Deal, Expands Indiana Storage Push — batterytechonline.com
  49. Sigenergy Plans Joint-Venture Energy Storage Factory in India with an Initial Investment of USD 250 Million - EnergyTrend — energytrend.com
  50. Battery Storage Tax Credit: Prohibited Foreign Entity Rules | China Prospect — chinaprospect.com
  51. The Battery Storage Development Handbook: Developing, Financing and ... - Julian R. Sterling - Google Books — books.google.com
  52. Sunwoda's Solid-State Battery Still in Customer Sample Testing, Putting 2026 Mass-Production Goal in Doubt | XenoSpectrum — xenospectrum.com
  53. Solid-state battery: Solid Power’s MOBIUS pilot line for continuous production of sulphide electrolyte begins commissioning, capacity to increase by 150% - Shanghai Metals Market (SMM) — news.metal.com
  54. Solid-state battery: Tianqi Lithium's 50 mt lithium sulfide pilot project expected to be completed in H2, samples already sent to over 30 clients - Shanghai Metals Market (SMM) — news.metal.com
  55. US-based QuantumScape Plans 100 MWh Solid-State Battery Production Line, Targeting AI Data Centers and Other Markets - EnergyTrend — energytrend.com
  56. India’s Delectrik Systems awarded 120MWh long-duration vanadium flow battery contract in Gujarat — energy-storage.news
  57. CATL sets 'industry-leading' solid-state battery production timeline - Notebookcheck News — notebookcheck.net
  58. CATL plans small-scale solid-state battery output in 2027 | UA.NEWS — ua.news
  59. CATL confirms 2027 solid-state battery pilot for premium EVs — eastasiabrief.com
  60. Solid-state battery: Samsung SDI reiterates mass production of 900Wh/L all-solid-state battery in H2 2027, with initial applications targeting luxury vehicles and humanoid robots - Shanghai Metals Market (SMM) — news.metal.com
  61. Nearly 2.2 GWh: Four Firms Including SVOLT and Samsung SDI Secure Energy Storage Orders - EnergyTrend — energytrend.com
  62. Bondada Engineering Wins Contract For 20 MW/120 MWh Vanadium Flow Battery Storage Project In Gujarat - SolarQuarter — solarquarter.com
  63. GLOBAL OFFERING — www1.hkexnews.hk
  64. RelyEZ Launches Hong Kong IPO, Aiming to Raise up to HK$639 Million - EnergyTrend — energytrend.com
  65. long-duration storage — CNESA China Update | Energy Storage Market Insights and Monthly Report — en.cnesa.org
  66. 国家发改委《电力现货市场基本规则》公开征求意见:新能源配储可联合报价,新型储能/虚拟电厂/绿电直连统一入场,场站通信与计量体系迎改造窗口 - 杭州领祺科技有限公司 — linkqi.cn
  67. 电力现货市场基本规则征求意见:2027年施行后光伏电站收益怎么算-安徽锦天新能源科技有限公司 — jintianne.com
  68. 电力现货市场新规拟支持新能源配储联合参与报价 _ 东方财富网 — stock.eastmoney.com
  69. ADS-TEC Energy Advances One of Europe’s Largest Battery Storage Projects as Building Permit Nears — finance.yahoo.com
  70. TNERC Approves 600 MW Solar Power With 1,800 MWh Storage At INR 3.12 per Unit In Tamil Nadu - SolarQuarter — solarquarter.com
  71. Greenvolt Power agrees to sell 400 MW/1.6 GWh Bess Projects to A&R Investments - Power — power.greenvolt.com
  72. ACME Solar Commissions Additional 35.77 MW/143.08 MWh BESS Capacity In Rajasthan - SolarQuarter — solarquarter.com
  73. Recurrent Energy Completes Sale of Two 100 MW / 400 MWh BESS Projects in France to BW ESS — prnewswire.com
  74. Scatec Secures $217 Million Financing For 569 MW Solar And 100 MWh BESS Project In Egypt - SolarQuarter — solarquarter.com
  75. India’s BESS pipeline needs bankable tenders and diversified revenue streams — energy-storage.news
  76. Germany moves forward with plans for one of Europe's largest battery storage projects — review-energy.com
  77. ADS-TEC Energy expects permit shortly for ~1 GW plant | ADSE SEC Filing - Form 6-K — stocktitan.net
  78. Batteries are big at All Energy Australia 2026 - pv magazine Australia — pv-magazine-australia.com
  79. Sigenergy unveils 401 kWh all-in-one battery for C&I sites - pv magazine Australia — pv-magazine-australia.com
  80. BESS already reducing curtailment in Chile, says ACERA; in-construction projects to triple capacity — energy-storage.news
Interactive web page · scroll inside the frame Open full page ↗

Generated with Divrite — this work was produced by AI from the prompt above and may contain mistakes. Check the cited sources before relying on it.

Related features

Ask your own question

Divrite researches it in depth, checks the key figures against their sources, and turns it into a deck, report or web page.