Nuclear Energy and Small Modular Reactors Monthly Brief · Sep 24–Oct 23, 2026

Generated with Divrite · 完成于 2026年10月23日

原始提问
Write the "Nuclear Energy and Small Modular Reactors" hot-topic report covering 2026-09-24 to 2026-10-23. Unit of coverage: the project and agreement — small modular reactor licensing and construction, technology-company nuclear power purchase agreements, national nuclear policy and fuel supply. Sections: 1. Key points of the month 2. SMR project progress 3. Technology companies and nuclear power 4. National policies 5. Fuel and supply chain 6. Timelines and risks. Length: 12–15 slides. Key sources: nuclear regulators, IAEA, company announcements, energy research institutes. Cite every key number; leave out anything without a reliable source. Answer in English.

这份作品是英文的。点「做一份同款」,用中文提问,Divrite 会用中文重新研究并写成。

全部 13 页

《Nuclear Energy and Small Modular Reactors Monthly Brief · Sep 24–Oct 23, 2026》封面
  1. 第 1 页

    Nuclear Energy and Small Modular Reactors Monthly Brief|Sep 24–Oct 23, 2026

    讲稿

    This is the Divrite Research monthly brief on nuclear energy and small modular reactors, covering September 24 to October 23, 2026. It looks at SMR projects, technology-company power deals, national policy and the fuel supply chain. First, the five parts of the brief.

    页面文字

    Nuclear Energy and Small Modular Reactors Monthly Brief

    Divrite Research · Hot Topics · Issue for Sep 24–Oct 23, 2026

    PUBLISHED BY

    Divrite Research

    COVERAGE PERIOD

    Sep 24–Oct 23, 2026

  2. 第 2 页

    Contents

    讲稿

    The brief has five parts: an overview, SMR projects, technology companies, national policies, and fuel and dates. The thread running through them is that permits and power deals ran ahead of construction. First, the overview.

    页面文字

    / 13

    Overview

    Permits and power deals ran ahead of construction

    SMR projects

    One permit, no build decision

    Technology companies

    Uprates and restarts, not new reactors

    National policies

    Finished rules, non-binding money

    Fuel and dates

    Priced ahead of supply, then the dated watch-list

  3. 第 3 页

    Overview|Plan on permits and uprates, not new reactors

    讲稿

    Plan on permits and uprates, not new reactors. The NRC issued TVA a construction permit for Clinch River Unit 1 on Sep 29, but TVA has no build commitment. Google, on Oct 6, and Amazon, on Sep 30, signed power purchase agreements with Constellation, with prices not disclosed. New uprate capacity is 890 plus 190, or 1,080 MW, from 2028. The NRC approved a final rule on Oct 22, and term uranium at $96.50 per pound passed its 2007 peak. The $120B Korea framework is announced and non-binding. When reading headlines, separate signed contracts and final rules from permits, frameworks and targets. Next, the Clinch River permit.

    页面文字

    Overview Plan on permits and uprates, not new reactors

    Source: GE Vernova Hitachi; ENR; Constellation; ANS; Neutron Bytes; Cameco via Farmonaut

    Uprates, not new reactors

    New capacity of 890 + 190 MW, arriving from 2028

    1,080 MW

    Permit, no build decision: the NRC issued TVA a construction permit for Clinch River Unit 1 (300 MWe BWRX-300) on Sep 29, but TVA has no build commitment

    Contracts for existing plants: Google (Oct 6) signed for 890 MW of uprates plus 2,700 MW of supply and Amazon (Sep 30) for 690 MW; prices not disclosed

    Rule finalised: the NRC approved a final rule on Oct 22 that lets applicants cite test data from DOE- or Department of War-authorised reactors, with review targets of about 18 and 12 months

    Money and fuel

    $120B

    Korea framework for 8 large reactors (announced, non-binding)

    $96.50

    Term uranium per lb, above its 2007 peak, against spot at $89.63

    What it means

    Permits, rules and contracts moved faster than construction

    No plant in the material has a committed start date

    Next step: separate signed contracts and final rules from permits, frameworks and targets when reading nuclear headlines

    数据出处
    【本页依据】 ① NRC issued TVA a construction permit for Clinch River Unit 1 (300 MWe BWRX-300) on Sep 29, but TVA has no build commitment —— Americas | GE Vernova News · gevernova.com · https://www.gevernova.com/news/taxonomy/term/9613;Federal Nuclear Regulator OKs TVA to Build First US Small Modular Reactor | Engineering News-Record · enr.com · https://www.enr.com/articles/63737-federal-nuclear-regulator-oks-tva-t… ② Google (Oct 6) signed for 890 MW of uprates plus 2,700 MW of supply and Amazon (Sep 30) for 690 MW; prices not disclosed —— Google and Constellation Announce Landmark Agreement to Bring 890 MW of New Nuclear Capacity to PJM Grid as Part of Long-Term Power Deal · constellationenergy.com · https://www.constellationenergy.com/news/2026/10/google-and-constellat… and Amazon Announce 20-Year Power Purchase Agreement Adding 190 Megawatts of Nuclear Capacity at Calvert Cliffs · constellationenergy.com · https://www.constellationenergy.com/news/2026/09/constellation-and-ama… ③ New capacity of 890 + 190 = 1,080 MW, arriving from 2028 —— Google Deal Backs 890 MW of Constellation Nuclear Uprates at 11 PJM Reactors · powermag.com · https://www.powermag.com/google-deal-backs-890-mw-of-constellation-nuc… ④ NRC approved a final rule on Oct 22 letting applicants cite DOE- or DoW-authorised reactor test data, with review targets of about 18 and 12 months —— NRC Finalizes Rule Allowing Reactor Applicants to Use DOE, DOW Demonstration Data · powermag.com · https://www.powermag.com/nrc-finalizes-rule-allowing-reactor-applicant… finalizes rule on licensing reactors with prior DOE or DOD authorization -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/2026-10-22/article-8512/nrc-finalizes-rule-on… ⑤ Korea framework up to $120B for 8 large reactors (announced, non-binding) —— South Korea, U.S. Ink Massive Nuclear Energy Plan | Neutron Bytes · neutronbytes.com · https://neutronbytes.com/2026/10/02/south-korea-u-s-ink-massive-nuclea… States of America - World Nuclear Outlook Report · world-nuclear.org · https://world-nuclear.org/our-association/publications/world-nuclear-o… ⑥ Term uranium $96.50/lb, above its 2007 peak of $95, against spot at $89.63 —— Cameco’s Uranium Earnings Fell Nearly 40% in Q2 Despite 18% Higher Prices. Here’s Where the Stock Could Go by 2030 | TIKR.com · tikr.com · https://www.tikr.com/blog/camecos-uranium-earnings-fell-nearly-40-in-q… Contract Prices Put America’s Domestic Uranium Gap Back in Focus · bnnbloomberg.ca · https://www.bnnbloomberg.ca/press-releases/2026/10/15/record-contract-… Uranium Prices: Spot, Term and Outlook · farmonaut.com · https://farmonaut.com/mining/current-uranium-prices-uranium-element-pr…
  4. 第 4 页

    SMR · Permits|Treat Clinch River's permit as no build decision

    讲稿

    Treat the Clinch River permit as no build decision. On Sep 29 the NRC issued TVA the first US construction permit for the BWRX-300, a 300 MWe unit. But TVA's board has not approved a final commitment, no start date exists, and the 2032 operating target was not reaffirmed, as reported. A separate operating licence is needed before fuel loading. The review took 14 months, 4 inside the 18-month schedule, against about 24 for Kemmerer, though the clocks differ. Darlington is the only BWRX-300 under construction. Treat Clinch River as pre-commitment, and watch for a TVA board vote, a start date and long-lead orders. Next, the wider SMR queue.

    页面文字

    SMR · Permits

    Treat Clinch River's permit as no build decision

    Source: GE Vernova Hitachi; ENR; Innovation Attorney; Construction Briefing

    The NRC issued TVA the first US construction permit for the BWRX-300 on Sep 29 (Clinch River Unit 1, 300 MWe), but TVA's board has not approved a final commitment and no start date exists.

    NRC permit review (months)

    Read: Clinch River took 14 months, 4 inside the 18-month ceiling; Kemmerer about 24 (the clocks differ)

    What is still open

    2032 operating target not reaffirmed (reported); a separate operating licence is needed before fuel loading

    $350 million board funding: $200 million (2022) + $150 million (Aug 2024), against up to $400 million of DOE cost-shared funding (Dec 2025)

    Darlington is the only BWRX-300 under construction; grid connection targeted by end-2030

    Consequence: a permit is a regulatory milestone, not a build decision, and no total cost is given.

    Next step

    Treat Clinch River as pre-commitment; watch for

    TVA board vote start date long-lead orders

    数据出处
    【本页依据】 ① NRC issued TVA the first US construction permit for the BWRX-300 on Sep 29 (Clinch River Unit 1, 300 MWe) —— Americas | GE Vernova News · gevernova.com · https://www.gevernova.com/news/taxonomy/term/9613;Federal Nuclear Regulator OKs TVA to Build First US Small Modular Reactor | Engineering News-Record · enr.com · https://www.enr.com/articles/63737-federal-nuclear-regulator-oks-tva-t… ② TVA's board has not approved a final commitment, no start date exists, 2032 operating target not reaffirmed, separate operating licence needed before fuel loading —— Federal Nuclear Regulator OKs TVA to Build First US Small Modular Reactor | Engineering News-Record · enr.com · https://www.enr.com/articles/63737-federal-nuclear-regulator-oks-tva-t… ③ Board funding $200 million (2022) + $150 million (Aug 2024) = $350 million, against up to $400 million of DOE cost-shared funding (Dec 2025) —— Same as ② ④ Clinch River review took 14 months, 4 inside the 18-month ceiling; Kemmerer about 24 months —— Advanced Nuclear Reactor Licensing · theinnovationattorney.substack.com · https://theinnovationattorney.substack.com/p/advanced-nuclear-reactor-… Secures First SMR Construction Permit · etfdb.com · https://etfdb.com/nuclear-energy-content-hub/tva-secures-smr-construct… ⑤ Darlington is the only BWRX-300 under construction; grid connection targeted by end-2030 —— Mapped: Who’s building nuclear SMRs? - Construction Briefing · constructionbriefing.com · https://www.constructionbriefing.com/news/mapped-whos-building-nuclear… ⑥ Clinch River: no new construction packages or long-lead orders followed the permit —— Same as ②
  5. 第 5 页

    SMR · Queue|Kemmerer slipped three years; pilots are tests

    讲稿

    Kemmerer slipped three years, and the pilot reactors are tests. TerraPower is replacing Bechtel as lead contractor, reported Sep 24, and says the schedule is unaffected. Operation is now 2031 against an original 2028, a slip that Nuclear Engineering International attributes to lost commercial HALEU supply. Hermes 2, Long Mott, Palisades SMR-300, NuScale and Rolls-Royce SMR had no new permit in the window. DOE pilot reactors went critical from Jun 4 to Aug 5 as zero-power or very low-power tests, before the window, and cannot be deployed commercially without the NRC. Check each project's instrument before counting it as capacity. Next, what technology buyers paid for.

    页面文字

    SMR · Queue

    Kemmerer slipped three years; pilots are tests

    Source: Nuclear Engineering International; Cowboy State Daily; WNA; ANS; GO-IBR

    Kemmerer's operation date is 2031, not 2028

    Lead contractor swap reported Sep 24; TerraPower says the schedule is unaffected.

    345 MWe (500 MWe with storage) $4 billion up to $2 billion federal cost share

    Kemmerer slip: 2031 − 2028

    3 years

    Kemmerer Unit 1

    Operation 2031, completion 2030, against an original 2028

    Bechtel is being replaced as lead contractor; WARN notice for up to 200 jobs from November

    Consequence: NEI attributes the slip to lost commercial HALEU supply.

    Queue and pilots

    No new permit in the window for Hermes 2, Long Mott, Palisades SMR-300, NuScale or Rolls-Royce SMR

    Long Mott: 4 x 80 MWe = 320 MWe, 18.5-month NRC target

    DOE pilots went critical Jun 4 to Aug 5: zero-power or very low-power tests, before the window (context)

    Next step

    Check each project's instrument before counting it as capacity

    NRC permit: Kemmerer Unit 1 (March 2026)

    Design approval: NuScale (May 2025), not a permit to build

    DOE authorization: test reactors cannot be deployed commercially without the NRC

    数据出处
    【本页依据】 ① Kemmerer: 345 MWe (500 MWe with storage), $4 billion, up to $2 billion federal cost share —— Bechtel out as Natrium EPC - Nuclear Engineering International · neimagazine.com · https://www.neimagazine.com/news/bechtel-out-as-natrium-epc;TerraPower CEO Says Kemmerer Nuclear Plant Will Attract Data Centers | Cowboy State Daily · cowboystatedaily.com · https://cowboystatedaily.com/2026/10/16/bill-gates-tours-kemmerers-nat… ② Kemmerer completion 2030 and operation 2031 against an original 2028, a 3-year slip that NEI attributes to lost commercial HALEU supply —— Bechtel out as Natrium EPC - Nuclear Engineering International · neimagazine.com · https://www.neimagazine.com/news/bechtel-out-as-natrium-epc ③ TerraPower replacing Bechtel as lead contractor (reported Sep 24); WARN notice for up to 200 jobs from November; TerraPower says schedule unaffected —— Same as ② ④ Long Mott: 4 x 80 MWe = 320 MWe, 18.5-month NRC target, no decision reported by Oct 22 —— United States of America - World Nuclear Outlook Report · world-nuclear.org · https://world-nuclear.org/our-association/publications/world-nuclear-o… SMR Licensing 2026: Part 53 Final, Part 57 Proposed | GO-IBR · go-ibr.com · https://go-ibr.com/featured-news/nrc-smr-licensing-2026-part-53-part-5… ⑤ NuScale has a May 2025 design approval, not a permit to build; Kemmerer NRC permit issued March 2026 —— NRC SMR Licensing 2026: Part 53 Final, Part 57 Proposed | GO-IBR · go-ibr.com · https://go-ibr.com/featured-news/nrc-smr-licensing-2026-part-53-part-5… Nuclear Reactor Licensing · theinnovationattorney.substack.com · https://theinnovationattorney.substack.com/p/advanced-nuclear-reactor-… ⑥ DOE pilots went critical Jun 4 to Aug 5 as zero-power or very low-power tests; cannot be deployed commercially without the NRC —— The deadline arrives: Checking in on the Reactor Pilot Program -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/article-8178/the-deadline-arrives-checking-in… Final Rule Lets Reactor Applicants Cite DOE, DOW Test Data · Voltgrid News · voltgridnews.com · https://voltgridnews.com/story/nrc-final-rule-lets-reactor-applicants-… Microreactors for AI Data Centers (2026) | CTAIO · ctaio.dev · https://ctaio.dev/en/physical-ai/nuclear-microreactors-ai-data-centers
  6. 第 6 页

    Tech · Uprates|Tech buyers paid for 1,080 MW of uprates

    讲稿

    Tech buyers paid for 1,080 MW of uprates. Google, on Oct 6, and Amazon, on Sep 30, signed 20-year agreements with Constellation, and neither price was disclosed. Google's covers 890 MW of uprates plus 2,700 MW of existing supply, 3,590 MW in all. Amazon's is 690 MW, of which about 190 MW is a new uprate due 2030 to 2032. New capacity is 890 plus 190, or 1,080 MW, announced, arriving from 2028. Compare a deal's new megawatts and start year rather than the headline, and ask whether the price is disclosed. Next, restarts, which are still pending.

    页面文字

    Tech · Uprates

    Tech buyers paid for 1,080 MW of uprates

    Source: Constellation; POWER; Maryland Matters

    Two PPAs, both at existing plants

    Google (Oct 6) and Amazon (Sep 30) signed 20-year PPAs with Constellation; neither price was disclosed. Amazon's power still flows to the PJM grid

    Google's covers uprates at 11 units in Illinois, Pennsylvania and New Jersey, plus a 15-year supply agreement for the existing PJM fleet

    Google

    Amazon

    Contracted

    3,590 MW (890 + 2,700)

    690 MW (190 + 500)

    Investment

    more than $4.3 billion

    more than $3 billion

    New uprate

    from 2028; all before end-2032 (Google)

    due 2030 to 2032

    $4.8 million per MW is our arithmetic, not a contract price.

    Consequence: near-term technology-company capacity comes from uprates at operating plants, while SMR commitments in the same material run to 2032 to 2035.

    New uprate capacity (MW, announced)

    Read: 890 + 190 = 1,080 MW, arriving from 2028

    Next step

    Compare a deal's new MW and start year rather than the headline MW

    Ask whether the price is disclosed

    数据出处
    【本页依据】 ① Google (Oct 6) and Amazon (Sep 30) signed 20-year PPAs with Constellation; neither price was disclosed —— Google and Constellation Announce Landmark Agreement to Bring 890 MW of New Nuclear Capacity to PJM Grid as Part of Long-Term Power Deal · constellationenergy.com · https://www.constellationenergy.com/news/2026/10/google-and-constellat… and Amazon Announce 20-Year Power Purchase Agreement Adding 190 Megawatts of Nuclear Capacity at Calvert Cliffs · constellationenergy.com · https://www.constellationenergy.com/news/2026/09/constellation-and-ama… ② Google's deal covers 890 MW of uprates at 11 units in Illinois, Pennsylvania and New Jersey, plus a 15-year 2,700 MW supply agreement for the existing PJM fleet (3,590 MW under contract) —— Google and Constellation Announce Landmark Agreement to Bring 890 MW of New Nuclear Capacity to PJM Grid as Part of Long-Term Power Deal · constellationenergy.com · https://www.constellationenergy.com/news/2026/10/google-and-constellat… ③ Amazon: 690 MW from Calvert Cliffs, of which about 190 MW is a new uprate due 2030 to 2032 and 500 MW is existing output still flowing to the PJM grid —— Constellation and Amazon Announce 20-Year Power Purchase Agreement Adding 190 Megawatts of Nuclear Capacity at Calvert Cliffs · constellationenergy.com · https://www.constellationenergy.com/news/2026/09/constellation-and-ama… upgrade planned at Calvert Cliffs after power deal signed with Amazon - Maryland Matters · marylandmatters.org · https://marylandmatters.org/2026/09/30/calvert-cliffs-power-purchase-a… ④ Constellation investment more than $4.3 billion (Google) and more than $3 billion (Amazon) —— Same as ① ⑤ New uprate capacity 890 + 190 = 1,080 MW; first uprate 2028, all 890 MW online before end-2032 (Google) —— Google Deal Backs 890 MW of Constellation Nuclear Uprates at 11 PJM Reactors · powermag.com · https://www.powermag.com/google-deal-backs-890-mw-of-constellation-nuc… and Constellation Announce Landmark Agreement to Bring 890 MW of New Nuclear Capacity to PJM Grid as Part of Long-Term Power Deal · constellationenergy.com · https://www.constellationenergy.com/news/2026/10/google-and-constellat… ⑥ $4.8 million per MW is our arithmetic ($4.3 billion / 890 MW), not a contract price —— Same as ②
  7. 第 7 页

    Tech · Restarts|Treat restarts as pending; Palisades is paused

    讲稿

    Treat restarts as pending, because Palisades is paused. Fuel loading began Aug 30, but an irradiated assembly tipped that day and loading stopped. The NRC issued a one-time exigent amendment on Oct 13 to move it, to be implemented by Oct 23, and the material does not say whether the lift has happened. Crane has a 2027 target and Duane Arnold is targeted for early 2029. Most SMR offtake is still announcements or MOUs, so count only signed contracts with capacity, date and price. Next, the NRC's Oct 22 rule, which is evidence for applicants and not a licence.

    页面文字

    Tech · Restarts

    Treat restarts as pending; Palisades is paused

    Source: ANS; mlive; Green Stocks Research; WNA; Tomorrow's World Today

    Restart status

    Palisades is paused. Fuel loading began Aug 30, but an irradiated assembly tipped that day and loading is paused.

    NRC acted Oct 13. A one-time exigent amendment to move it, to be implemented by Oct 23; the material does not say whether the lift has happened.

    Crane and Duane Arnold are queued. Crane has a 2027 target (WNA 2027 to 2028); Duane Arnold restart is targeted for early 2029.

    Holtec is reported as contracted to supply power by March 2027.

    Consequence: restart dates are targets that can slip, and most SMR offtake is a commitment rather than delivered power.

    Next step: treat restarts as pending until fuel loads, and count only signed contracts with capacity, date and price.

    Restart capacity, MW

    Read: Crane per contract figure; WNA says 880 MWe.

    SMR offtake: mostly announcements or MOUs

    Meta, up to, by 2035

    6.6 GWe

    2,176 + 690 + 1,200 = 4,066 MW is itemised

    Amazon, X-energy and AEP

    960 MW

    12 × 80 MW (reported, no date or price)

    数据出处
    【本页依据】 ① Palisades (800 MW): fuel loading began Aug 30, but an irradiated assembly tipped that day and loading is paused —— Incident pauses Palisades fuel loading; plant connected to switchyard -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/2026-09-25/article-8436/incident-pauses-palis… Palisades can try unusual fix to nuclear fuel loading mishap - mlive.com · mlive.com · https://www.mlive.com/environment/2026/10/holtec-palisades-can-try-unu… ② NRC issued a one-time exigent amendment on Oct 13 to move the assembly, to be implemented by Oct 23; whether the lift has happened is not stated —— NRC allows alternate approach to removing tilted fuel assembly at Palisades -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/article-8495/nrc-allows-alternate-approach-to… Palisades can try unusual fix to nuclear fuel loading mishap - mlive.com · mlive.com · https://www.mlive.com/environment/2026/10/holtec-palisades-can-try-unu… ③ Holtec reported as contracted to supply power by March 2027 —— Incident pauses Palisades fuel loading; plant connected to switchyard -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/2026-09-25/article-8436/incident-pauses-palis… ④ Crane 835 MW (WNA says 880 MWe), 2027 target (WNA 2027 to 2028); Duane Arnold 615 MW, restart targeted for early 2029 —— Constellation, Amazon Sign 20-Year Calvert Cliffs Nuclear PPA | Green Stocks Research · greenstocksresearch.com · https://greenstocksresearch.com/constellation-amazon-calvert-cliffs-nu… States of America - World Nuclear Outlook Report · world-nuclear.org · https://world-nuclear.org/our-association/publications/world-nuclear-o… ⑤ Meta up to 6.6 GWe by 2035, of which 2,176 + 690 + 1,200 = 4,066 MW is itemised —— United States of America - World Nuclear Outlook Report · world-nuclear.org · https://world-nuclear.org/our-association/publications/world-nuclear-o… ⑥ Amazon, X-energy and AEP: 12 x 80 MW = 960 MW (reported, no date or price) —— Amazon Backs 12-Reactor Nuclear Power Plant in the U.S. - Tomorrow's World Today® · tomorrowsworldtoday.com · https://www.tomorrowsworldtoday.com/nuclear/amazon-backs-12-reactor-nu…
  8. 第 8 页

    Policy · NRC|Plan for the Oct 22 rule as evidence, no licence

    讲稿

    The NRC's Oct 22 final rule is an evidence route, not a licence. It lets applicants use analyses and test data from DOE or DoW-authorised reactors, and independent NRC review remains. Federal Register publication is scheduled for Oct 26, though ANS says Oct 28, so the rule takes effect about Nov 25, a computed date. Part 53 has been in effect since Apr 29, but no Part 53 review is complete, and Part 57 is still proposed. Plan to cite DOE test data after about Nov 25, and file comments on 91 FR 60702 by Nov 9. Next, the money behind these projects.

    页面文字

    Policy · NRC

    Plan for the Oct 22 rule as evidence, no licence

    Source: POWER; ANS; Federal Register; The Innovation Attorney

    NRC rulebook status

    Item Date Status

    Final rule on DOE / DoW-authorised reactor data

    Approved Oct 22

    Evidence route, not a licence; independent NRC review remains

    Federal Register publication

    Oct 26

    Scheduled; ANS says Oct 28

    Rule takes effect

    About Nov 25

    Oct 26 + 30 days, computed; Oct 28 would give Nov 27

    Proposed rule 91 FR 60702

    Comments to Nov 9

    Proposed; 89 pages

    EO 14300 deadline

    Nov 23, 2026

    Computed date

    AP1000 design certification renewal

    Oct 14

    Approved

    Part 53

    In effect since Apr 29

    No Part 53 review is complete; $152M net averted cost

    Part 57

    —

    Still proposed

    Review targets

    First-of-a-kind, about

    months

    Nth-of-a-kind, about

    months

    Consequence

    The rulebook is advancing on schedule,

    but in our reading the NRC proposed rule cannot be final by the Nov 23 deadline.

    Next step: plan to cite DOE test data after about Nov 25, and file comments on 91 FR 60702 by Nov 9.

    数据出处
    【本页依据】 ① On Oct 22 the NRC approved a final rule letting applicants use DOE or DoW-authorised reactor data; it is an evidence route, not a licence, and independent NRC review remains —— NRC Finalizes Rule Allowing Reactor Applicants to Use DOE, DOW Demonstration Data · powermag.com · https://www.powermag.com/nrc-finalizes-rule-allowing-reactor-applicant… finalizes rule on licensing reactors with prior DOE or DOD authorization -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/2026-10-22/article-8512/nrc-finalizes-rule-on… ② Review targets are about 18 months (first-of-a-kind) and about 12 months (nth-of-a-kind) —— NRC finalizes rule on licensing reactors with prior DOE or DOD authorization -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/2026-10-22/article-8512/nrc-finalizes-rule-on… ③ Federal Register publication is scheduled for Oct 26 (ANS says Oct 28); the rule takes effect about Nov 25 (Oct 26 + 30 days, computed) —— [7590-01-P] NUCLEAR REGULATORY COMMISSION 10 ... · public-inspection.federalregister.gov · https://public-inspection.federalregister.gov/2026-21801.pdf;NRC finalizes rule on licensing reactors with prior DOE or DOD authorization -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/2026-10-22/article-8512/nrc-finalizes-rule-on… ④ Proposed rule 91 FR 60702 is 89 pages, with comments to Nov 9; EO 14300 deadline Nov 23, 2026 (computed) —— Federal Register :: Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight · federalregister.gov · https://www.federalregister.gov/documents/2026/09/24/2026-19568/regula… SMR Licensing 2026: Part 53 Final, Part 57 Proposed | GO-IBR · go-ibr.com · https://go-ibr.com/featured-news/nrc-smr-licensing-2026-part-53-part-5… ⑤ AP1000 design certification renewal approved Oct 14; Part 57 still proposed —— NRC finalizes rule on licensing reactors with prior DOE or DOD authorization -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/2026-10-22/article-8512/nrc-finalizes-rule-on… Nuclear Reactor Licensing · theinnovationattorney.substack.com · https://theinnovationattorney.substack.com/p/advanced-nuclear-reactor-… ⑥ Part 53 in effect since Apr 29 with $152M net averted cost, but no Part 53 review is complete —— Advanced Nuclear Reactor Licensing · theinnovationattorney.substack.com · https://theinnovationattorney.substack.com/p/advanced-nuclear-reactor-…
  9. 第 9 页

    Policy · Money|Treat the $120B Korea framework as non-binding

    讲稿

    The largest numbers of the month are frameworks and conditional loans, not signed contracts. Per Neutron Bytes, the US-Korea framework announced Sep 30 is non-binding and names no site or utility, with up to $120B and a $10 billion advance by year-end. DOE loans are conditional, up to $17.5B for up to 10 AP1000s, and Army Janus is a programme plan of up to $2.2B over fiscal 2027 to 2031. Count only signed and funded commitments in project plans, and mark the rest as announced. Next, the fuel side, starting with uranium prices.

    页面文字

    Policy · Money

    Treat the $120B Korea framework as non-binding

    Source: Neutron Bytes; WNA; The Innovation Attorney; POWER; IIR

    Headline amounts, $B (up to; announced or conditional)

    Europe

    The EIB lent EUR 40M to Steady Energy (reported Oct 14)

    China

    No new approval in the window; 65,085 + 39,755 = 104,840 MWe against 110 GWe by 2030

    India

    Rules are draft; 100 GWe by 2047 from 8.78 GW

    What each bar is

    Korea is non-binding and names no site or utility. $100 billion construction plus $20 billion contingency, with a $10 billion advance by year-end for six AP1000s and two APR1400s.

    $100 billion ÷ 8 ≈ $12.5 billion per unit (our arithmetic).

    DOE loans are conditional, up to $17.5B for up to 10 AP1000s.

    Army Janus is a programme plan, up to $2.2B over fiscal 2027–2031.

    Consequence: the largest numbers of the month are frameworks and conditional loans, not signed contracts.

    Next step: count only signed and funded commitments in project plans, and mark the rest as announced.

    数据出处
    【本页依据】 ① The US-Korea framework announced Sep 30 is non-binding and names no site or utility —— South Korea, U.S. Ink Massive Nuclear Energy Plan | Neutron Bytes · neutronbytes.com · https://neutronbytes.com/2026/10/02/south-korea-u-s-ink-massive-nuclea… States of America - World Nuclear Outlook Report · world-nuclear.org · https://world-nuclear.org/our-association/publications/world-nuclear-o… ② Korea up to $120B ($100B construction plus $20B contingency), $10B advance by year-end, six AP1000s and two APR1400s; $100B / 8 is about $12.5B per unit (our arithmetic) —— South Korea, U.S. Ink Massive Nuclear Energy Plan | Neutron Bytes · neutronbytes.com · https://neutronbytes.com/2026/10/02/south-korea-u-s-ink-massive-nuclea… ③ DOE conditional loans up to $17.5B for up to 10 AP1000s; Army Janus plans up to $2.2B over fiscal 2027-2031 —— Advanced Nuclear Reactor Licensing · theinnovationattorney.substack.com · https://theinnovationattorney.substack.com/p/advanced-nuclear-reactor-… Final Rule Lets Reactor Applicants Cite DOE, DOW Test Data · Voltgrid News · voltgridnews.com · https://voltgridnews.com/story/nrc-final-rule-lets-reactor-applicants-… ④ The EIB lent EUR 40M to Steady Energy (reported Oct 14) —— Europe Makes its First SMR Investment · industrialinfo.com · https://www.industrialinfo.com/news/article/europe-makes-its-first-smr… ⑤ China has no new approval in the window; 65,085 + 39,755 = 104,840 MWe against 110 GWe by 2030 —— Nuclear Power in China - World Nuclear Association · world-nuclear.org · https://world-nuclear.org/information-library/country-profiles/countri… ⑥ India's rules are draft; target 100 GWe by 2047 from 8.78 GW —— India Nuclear Energy Roadmap 2047: 100 GW Target Explained · yellowhaze.com · https://yellowhaze.com/india-nuclear-energy-roadmap-2047;India’s nuclear energy ambition: expanding the ambit · speyside-group.com · https://speyside-group.com/news-insights/indias-nuclear-energy-ambitio…
  10. 第 10 页

    Fuel · Uranium|Term uranium at $96.50 is above the 2007 peak

    讲稿

    Term uranium at $96.50 per pound is above the 2007 peak of $95. Cameco's month-end series has it there at the end of August and September. Spot ended September at $89.63 and has been flat near $90 for two months, so term sits $6.87 above spot, a 7.7% premium. But the headline price reaches company results slowly: Cameco's Q2 realised price was $67.79 per pound, 70% of the term price. So read realised prices and contract floors when Cameco reports Q3 on Oct 30. Next, who supplies the enriched fuel.

    页面文字

    Fuel · Uranium

    Term uranium at $96.50 is above the 2007 peak

    Source: Cameco via Farmonaut; GlobeNewswire; TIKR; Sprott via NucNet · Divrite Research

    Cameco month-end uranium, $/lb U3O8

    Reported: every public price is an average of broker quotes. Spot is below its cycle peak of $107 and its 2007 high of $136. No October month-end print is in the material.

    Reading: term at $96.50 sits above the 2007 peak of $95, while spot ended September at $89.63 and has been flat near $90 for two months

    Premium, then lag

    $6.87 /lb

    Term over spot: 96.50 − 89.63 , a 7.7% premium

    +16%

    Term up $13.50 on $83.00 a year earlier

    70%

    Cameco Q2 realised $67.79/lb , as a share of the term price

    Consequence: the headline price reaches company results slowly, because contracts lag the term quote. US utilities paid $58.46/lb on 2025 deliveries (EIA).

    Next step: Read realised prices and contract floors, not only the month-end term price, when Cameco reports Q3 on Oct 30

    数据出处
    【本页依据】 ① Long-term uranium is $96.50/lb at end-September, above the 2007 peak of $95 —— Cameco’s Uranium Earnings Fell Nearly 40% in Q2 Despite 18% Higher Prices. Here’s Where the Stock Could Go by 2030 | TIKR.com · tikr.com · https://www.tikr.com/blog/camecos-uranium-earnings-fell-nearly-40-in-q… Contract Prices Put America’s Domestic Uranium Gap Back in Focus · bnnbloomberg.ca · https://www.bnnbloomberg.ca/press-releases/2026/10/15/record-contract-… ② Spot ended September at $89.63, flat near $90 for two months, below its cycle peak of $107 and 2007 high of $136 —— Current Uranium Prices: Spot, Term and Outlook · farmonaut.com · https://farmonaut.com/mining/current-uranium-prices-uranium-element-pr… Uranium Price Hit All-Time High In August, Says Sprott · nucnet.org · https://www.nucnet.org/news/long-term-uranium-price-hit-all-time-high-… ③ Term over spot is 96.50 - 89.63 = $6.87/lb, a 7.7% premium —— Record Contract Prices Put America’s Domestic Uranium Gap Back in Focus · bnnbloomberg.ca · https://www.bnnbloomberg.ca/press-releases/2026/10/15/record-contract-… Uranium Prices: Spot, Term and Outlook · farmonaut.com · https://farmonaut.com/mining/current-uranium-prices-uranium-element-pr… ④ Term is up $13.50 (+16%) on $83.00 a year earlier —— Current Uranium Prices: Spot, Term and Outlook · farmonaut.com · https://farmonaut.com/mining/current-uranium-prices-uranium-element-pr… Fuel Market to reach US$72.24bn - Visiongain · visiongain.com · https://visiongain.com/nuclear-fuel-market-to-double-to-us72-24bn ⑤ Cameco Q2 realised price $67.79/lb, 70% of the term price —— Cameco’s Uranium Earnings Fell Nearly 40% in Q2 Despite 18% Higher Prices. Here’s Where the Stock Could Go by 2030 | TIKR.com · tikr.com · https://www.tikr.com/blog/camecos-uranium-earnings-fell-nearly-40-in-q… ⑥ US utilities paid $58.46/lb on 2025 deliveries (EIA) —— Current Uranium Prices: Spot, Term and Outlook · farmonaut.com · https://farmonaut.com/mining/current-uranium-prices-uranium-element-pr…
  11. 第 11 页

    Fuel · Supply|Check Russian exposure: waivers end Jan 1, 2028

    讲稿

    Fuel is the best-funded link in the chain, but new capacity arrives late. By the WNA estimate, Rosatom holds 43% of 2025 enrichment capacity. DOE awarded $900M task orders to each of Centrus, General Matter and Orano in January 2026, yet no new Western enrichment capacity runs before 2028. Russia supplied 26% of US enrichment purchases in 2025, and waivers must end by Jan 1, 2028. So check Russian exposure in fuel contracts, and the dates of new Western supply, before relying on 2028. The last page pulls the dates together.

    页面文字

    Fuel · Supply

    Check Russian exposure: waivers end Jan 1, 2028

    Source: WNA; Visiongain; Credence Research; Oregon Group; ANS · Divrite Research

    Concentrated, funded, but late

    Rosatom holds 43% of 2025 enrichment capacity: 29,133 of 68,076 thousand SWU/yr (WNA estimate)

    DOE awarded $900M task orders to each of Centrus, General Matter and Orano in Jan 2026, yet no new Western enrichment capacity runs before 2028

    General Matter's Paducah licence application is in NRC acceptance review

    26%

    Russian share of US enrichment purchases in 2025; waivers must end by Jan 1, 2028

    $116M

    Centrus buys Westerman , about $116M ($95M cash + $21M equity), announced Oct 19

    $1B

    Westinghouse LEU+ plant , announced Oct 23

    2.5M SWU

    Orano Tricastin: first modules in 2028, full commissioning in 2030

    Capacity in 2025, thousand SWU/yr

    WNA estimate; the CNNC figure is assumed

    Reading: Rosatom alone is 43% of capacity

    Consequence: fuel is the best-funded link in the chain, but new capacity arrives late, while the Russian waiver window closes on Jan 1, 2028

    Next step: Check Russian exposure in fuel contracts and the dates of new Western supply before relying on 2028

    数据出处
    【本页依据】 ① Rosatom holds 43% of 2025 enrichment capacity: 29,133 of 68,076 thousand SWU/yr (WNA estimate) —— Uranium Enrichment - World Nuclear Association · world-nuclear.org · https://world-nuclear.org/information-library/nuclear-fuel-cycle/conve… ② DOE awarded $900M task orders to each of Centrus, General Matter and Orano in Jan 2026 —— Nuclear Fuel Market to reach US$72.24bn - Visiongain · visiongain.com · https://visiongain.com/nuclear-fuel-market-to-double-to-us72-24bn ③ General Matter's Paducah licence application is in NRC acceptance review —— General Matter walks NRC through Paducah enrichment license filing · nuclearnewsnetwork.com · https://www.nuclearnewsnetwork.com/news/general-matter-paducah-enrichm… ④ Russia supplied 26% of US enrichment purchases in 2025; waivers must end by Jan 1, 2028 —— The global uranium market is splitting in two - The Oregon Group · theoregongroup.com · https://theoregongroup.com/commodities/uranium/the-global-uranium-mark… ⑤ Centrus buys Westerman for about $116M ($95M cash + $21M equity), Oct 19; Westinghouse announces a $1B LEU+ plant, Oct 23 —— Centrus Energy acquires centrifuge supplier Westerman for $116 million · credenceresearch.com · https://www.credenceresearch.com/news/centrus-energy-acquires-westerma… Matter’s NRC license application materials publicly available -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/article-8465/general-matters-nrc-license-appl… ⑥ Orano Tricastin adds 2.5M SWU, first modules in 2028, full commissioning in 2030 —— Same as ①
  12. 第 12 页

    Outlook · Dates|Plan for Oct 30 and Nov 9 dates, then 2028

    讲稿

    This month's deadlines are filings rather than construction. The NRC final rule is scheduled for the Federal Register on Oct 26, Cameco reports Q3 on Oct 30, and comments on the NRC proposed rule close Nov 9. The first dated deliveries are uprates in 2028, and fuel capacity comes not before 2028. The Palisades lift status is open, and the Temelín filing, the Amazon, X-energy and AEP Indiana agreement and the Duke MOUs carry no date. File comments by Nov 9, watch Cameco on Oct 30, and treat undated items as announced or reported, not scheduled. That closes this month's brief.

    页面文字

    Outlook · Dates

    Plan for Oct 30 and Nov 9 dates, then 2028

    Source: Federal Register; TIKR; NNN; Constellation; WNA; ANS · Divrite Research

    This month's deadlines are filings rather than construction

    Consequence: the first dated deliveries are uprates in 2028 and fuel capacity not before 2028

    Comments close on the NRC proposed rule

    Nov 9

    Next 30 days: filings and reports

    Oct 26

    Federal Register: NRC final rule (scheduled)

    Oct 30

    Cameco reports Q3

    Nov 6

    General Matter foundation-exemption request

    Nov 9

    Comments close on NRC proposed rule

    Nov 23

    EO 14300 deadline (computed)

    Nov 25

    NRC final rule effective (computed)

    Open: Palisades lift status. No date: Temelín filing; Amazon, X-energy and AEP Indiana agreement; Duke MOUs

    End-2026 to 2031: targets, not starts

    End-2026

    $10B Korean advance contemplated

    Mar 2027

    Palisades power supply (Holtec, reported)

    End-2027

    Temelín assessment due to finish

    Jan 1, 2028

    Russian LEU import waivers must end

    2028

    First Constellation uprate; Orano modules

    2030–2031

    Kemmerer completion (2030), operation (2031)

    Next step: File comments by Nov 9, watch Cameco on Oct 30, and treat undated items as announced or reported, not scheduled

    数据出处
    【本页依据】 ① Federal Register publishes the NRC final rule Oct 26 (scheduled), effective Nov 25 (computed); comments close Nov 9; EO 14300 deadline Nov 23 (computed) —— [7590-01-P] NUCLEAR REGULATORY COMMISSION 10 ... · public-inspection.federalregister.gov · https://public-inspection.federalregister.gov/2026-21801.pdf;Federal Register :: Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight · federalregister.gov · https://www.federalregister.gov/documents/2026/09/24/2026-19568/regula… SMR Licensing 2026: Part 53 Final, Part 57 Proposed | GO-IBR · go-ibr.com · https://go-ibr.com/featured-news/nrc-smr-licensing-2026-part-53-part-5… ② Cameco reports Q3 on Oct 30; General Matter asks the NRC to act on a foundation exemption by Nov 6 —— Cameco’s Uranium Earnings Fell Nearly 40% in Q2 Despite 18% Higher Prices. Here’s Where the Stock Could Go by 2030 | TIKR.com · tikr.com · https://www.tikr.com/blog/camecos-uranium-earnings-fell-nearly-40-in-q… Matter walks NRC through Paducah enrichment license filing · nuclearnewsnetwork.com · https://www.nuclearnewsnetwork.com/news/general-matter-paducah-enrichm… ③ Palisades lift status is open; Holtec reported as contracted to supply power by Mar 2027 —— NRC allows alternate approach to removing tilted fuel assembly at Palisades -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/article-8495/nrc-allows-alternate-approach-to… Palisades can try unusual fix to nuclear fuel loading mishap - mlive.com · mlive.com · https://www.mlive.com/environment/2026/10/holtec-palisades-can-try-unu… pauses Palisades fuel loading; plant connected to switchyard -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/2026-09-25/article-8436/incident-pauses-palis… ④ Temelin assessment due to finish end-2027; Temelin filing, Amazon/X-energy/AEP Indiana agreement and Duke MOUs carry no date —— Czech SMR environmental impact assessment submitted - World Nuclear News · world-nuclear-news.org · https://www.world-nuclear-news.org/articles/czech-smr-environmental-im… Backs 12-Reactor Nuclear Power Plant in the U.S. - Tomorrow's World Today® · tomorrowsworldtoday.com · https://www.tomorrowsworldtoday.com/nuclear/amazon-backs-12-reactor-nu… partnering with Amazon, Google, Microsoft, Nucor on energy security -- ANS / Nuclear Newswire · ans.org · https://www.ans.org/news/article-6084/duke-partnering-with-amazon-goog… ⑤ End-2026: $10B Korean advance contemplated —— South Korea, U.S. Ink Massive Nuclear Energy Plan | Neutron Bytes · neutronbytes.com · https://neutronbytes.com/2026/10/02/south-korea-u-s-ink-massive-nuclea… ⑥ Jan 1, 2028 Russian waivers end; 2028 first Constellation uprate; Kemmerer completion 2030 and operation 2031 —— The global uranium market is splitting in two - The Oregon Group · theoregongroup.com · https://theoregongroup.com/commodities/uranium/the-global-uranium-mark… and Constellation Announce Landmark Agreement to Bring 890 MW of New Nuclear Capacity to PJM Grid as Part of Long-Term Power Deal · constellationenergy.com · https://www.constellationenergy.com/news/2026/10/google-and-constellat… out as Natrium EPC - Nuclear Engineering International · neimagazine.com · https://www.neimagazine.com/news/bechtel-out-as-natrium-epc
  13. 第 13 页

    Permits moved; concrete has not

    讲稿

    To close: permits moved, but concrete has not. Separate signed contracts and final rules from permits, frameworks and targets, and treat undated plans as announced, not scheduled. Thank you.

    页面文字

    Closing

    Separate signed contracts and final rules from permits,

    frameworks and targets; the first dated deliveries are uprates.

    Thank you

    2026-10-24 · Nuclear Energy and Small Modular Reactors Monthly Brief · Sep 24–Oct 23, 2026

信息来源(101)

链接指向 Divrite 调研时找到并引用的原始页面。

  1. 01GE Vernova Secures First US Construction Permit for BWRX-300 Reactor – tEDmagtedmag.com
  2. 02Tennessee Valley Authority gets green light to build first BWRX-300 small modular reactor in the USpower-eng.com
  3. 03TVA Secures First SMR Construction Permitrangeetfs.com
  4. 04United States of America - World Nuclear Outlook Reportworld-nuclear.org
  5. 05TVA Secures First SMR Construction Permitetfdb.com
  6. 06Federal Nuclear Regulator OKs TVA to Build First US Small Modular Reactor | Engineering News-Recordenr.com
  7. 07TerraPower CEO Says Kemmerer Nuclear Plant Will Attract Data Centers | Cowboy State Dailycowboystatedaily.com
  8. 08Curtiss-Wright Installs Stage 1 Simulator at TerraPower’s Natrium Site in Kemmerer, WYfinance.yahoo.com
  9. 09Gates, governors tour Wyoming’s first natrium reactor site | News | buffalobulletin.combuffalobulletin.com
  10. 10Kemmerer Unit 1 — Natrium Demonstration Plant – Infraday | Infrastructure News, Projects & Eventsinfraday.com
  11. 11Bechtel out as Natrium EPC - Nuclear Engineering Internationalneimagazine.com
  12. 12Introducing SMRZ: The Case for Small Modular Reactorsglobalxetfs.com
展开其余 89 条来源
  1. 13OKLO Advances Regulatory Milestones to Support Nuclear Growthfinance.yahoo.com
  2. 14OKLO Advances Regulatory Milestones to Support Nuclear Growth — Noticias de TradingViewes.tradingview.com
  3. 15Which advanced nuclear startups are closest to deployment? – New Market Pitchnewmarketpitch.com
  4. 16NRC SMR Licensing 2026: Part 53 Final, Part 57 Proposed | GO-IBRgo-ibr.com
  5. 17Oklo Could Have a Huge Opportunity as Demand for Advanced Nuclear Energy Grows - 24/7 Wall St.247wallst.com
  6. 18NRC Final Rule Lets Reactor Applicants Cite DOE, DOW Test Data · Voltgrid Newsvoltgridnews.com
  7. 19NRC Finalizes Rule Allowing Reactor Applicants to Use DOE, DOW Demonstration Datapowermag.com
  8. 20Nuclear Microreactors for AI Data Centers (2026) | CTAIOctaio.dev
  9. 21Microreactors Reach Milestones & Retailers Go Nuclearhanetf.com
  10. 22New Reactors -- ANS / Nuclear Newswireans.org
  11. 23The deadline arrives: Checking in on the Reactor Pilot Program -- ANS / Nuclear Newswireans.org
  12. 24Nuclear Power Stocks List: 68 Nuclear Energy Companies (2026) | GSRgreenstocksresearch.com
  13. 25Small Modular Reactor for a Data Centre: What It Takesscienceshot.com
  14. 26Mapped: Who’s building nuclear SMRs? - Construction Briefingconstructionbriefing.com
  15. 27Americas | GE Vernova Newsgevernova.com
  16. 28Top Small Modular Reactor Stocks for 2027: The Boring Reactor Winsexoswan.com
  17. 29GE Vernova's BWRX-300 Secures First US Construction Permitfinance.yahoo.com
  18. 30Constellation, Google strike 890-MW nuclear deal in PJMfinance.yahoo.com
  19. 31Constellation, Google strike 890-MW nuclear deal in PJM | Utility Diveutilitydive.com
  20. 32Google and Constellation Announce Landmark Agreement to Bring 890 MW of New Nuclear Capacity to PJM Grid as Part of Long-Term Power Dealfinance.yahoo.com
  21. 33Google and Constellation Announce Landmark Agreement to Bring 890 MW of New Nuclear Capacity to PJM Grid as Part of Long-Term Power Dealconstellationenergy.com
  22. 34Google and Constellation Announce Agreement to Bring 890 MW of New Nuclear Capacity to PJM Grid as Part of Long-Term Power Deal | American Public Power Associationpublicpower.org
  23. 35Google Deal Backs 890 MW of Constellation Nuclear Uprates at 11 PJM Reactorspowermag.com
  24. 36Constellation and Amazon Announce 20-Year Power Purchase Agreement Adding 190 Megawatts of Nuclear Capacity at Calvert Cliffsconstellationenergy.com
  25. 37Amazon signs 20-year nuclear power deal with Constellation Energyqz.com
  26. 38Constellation, Amazon agree nuclear-focused power purchase deal - World Nuclear Newsworld-nuclear-news.org
  27. 39Constellation, Amazon Sign 20-Year Calvert Cliffs Nuclear PPA | Green Stocks Researchgreenstocksresearch.com
  28. 40Amazon, Constellation sign 20-year PPA to expand Maryland nuclear plant | Utility Diveutilitydive.com
  29. 41Large upgrade planned at Calvert Cliffs after power deal signed with Amazon - Maryland Mattersmarylandmatters.org
  30. 42October 1, 2026capitolnewsillinois.com
  31. 43Large Load Projects and Tariffs (October 2026)eei.org
  32. 44Top 15 New Upcoming Data Centers in the USA (October-2026)blackridgeresearch.com
  33. 45Meta locked in 6 gigawatts of nuclear power this year. The Uptime Institute's 2026 forecast named power availability, not chips, not land, as the binding constraint on data center growth. Every major AI company is now in the power business because they have to be. The question is not whether power matters. It is who can actually deliver it.threads.com
  34. 46Data Center Investment: PUE, Power & Hyperscalerapers.app
  35. 47Incident pauses Palisades fuel loading; plant connected to switchyard -- ANS / Nuclear Newswireans.org
  36. 48NRC allows alternate approach to removing tilted fuel assembly at Palisades -- ANS / Nuclear Newswireans.org
  37. 49Holtec Palisades can try unusual fix to nuclear fuel loading mishap - mlive.commlive.com
  38. 50Palisades gets approval to move damaged nuclear reactor fuelmichiganpublic.org
  39. 51Duke partnering with Amazon, Google, Microsoft, Nucor on energy security -- ANS / Nuclear Newswireans.org
  40. 52Rundown Archives | Clearpath Actionclearpathaction.org
  41. 53Nuclear PPAs Market Outlook 2026–2038 | Meticulous Researchmeticulousresearch.com
  42. 54Google’s 20-Year $4.3 Billion Deal with Constellation to Uprate 11 Reactors  | Neutron Bytesneutronbytes.com
  43. 55Amazon Backs 12-Reactor Nuclear Power Plant in the U.S. - Tomorrow's World Today®tomorrowsworldtoday.com
  44. 56섹터 워치리스트 2026.10.05 (AI·에너지·광통신·반도체·양자·우주 등) :: 투자연구소 테크센터engineering-ladder.tistory.com
  45. 57Advanced Nuclear Reactor Licensingtheinnovationattorney.substack.com
  46. 58Federal Register :: Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversightfederalregister.gov
  47. 59[7590-01-P] NUCLEAR REGULATORY COMMISSION 10 ...public-inspection.federalregister.gov
  48. 60Policy -- ANS / Nuclear Newswireans.org
  49. 61NRC finalizes rule on licensing reactors with prior DOE or DOD authorization -- ANS / Nuclear Newswireans.org
  50. 62Small Modular Reactor Wylfa: UK's First SMR Takes Shape | Born to Engineerborntoengineer.com
  51. 63United Kingdom - World Nuclear Outlook Report - World Nuclear Associationworld-nuclear.org
  52. 64Czech SMR environmental impact assessment submitted - World Nuclear Newsworld-nuclear-news.org
  53. 65Nuclear Power in China - World Nuclear Associationworld-nuclear.org
  54. 66Nuclear power sector rallies against the market as global forecasts rise and China's installation peak converges — BigGo Financefinance.biggo.com
  55. 67Japan’s Nuclear Power Plants in 2026 | Nippon.comnippon.com
  56. 68Europe Makes its First SMR Investmentindustrialinfo.com
  57. 69Advanced Nuclear Energy in Europe – Clean Air Task Forcecatf.us
  58. 70ASNR at the 19th European Nuclear Energy Forum | ASNRen.asnr.fr
  59. 71Nuclear Power in Poland - World Nuclear Associationworld-nuclear.org
  60. 72The EU needs a nuclear fuel strategy before its next reactors are ordered | Tænketanken Europathinkeuropa.dk
  61. 73Small Modular Reactors in India: SHANTI Act and Licensingksandk.com
  62. 74India Nuclear Energy Roadmap 2047: 100 GW Target Explainedyellowhaze.com
  63. 75India’s nuclear energy ambition: expanding the ambitspeyside-group.com
  64. 76Reshaping India’s Nuclear Energy Sectordrishtiias.com
  65. 77Stock Near 52-Week Low, Centrus Energy (NYSE:LEU) Reports Second Quarter 2026 Results and HALEU Contract Updateskalkine.com
  66. 78Transcript: Centrus Energy Q2 2026 Earnings Conference Call - Centrus Energy (NYSE:LEU)benzinga.com
  67. 79Centrus Energy acquires centrifuge supplier Westerman for $116 millioncredenceresearch.com
  68. 80Everyone's Watching Oklo and NuScale for Nuclear Exposure. This Company Actually Fuels Them. - AOLaol.com
  69. 81Panelists talk domestic enrichment expansion at Global 2026 -- ANS / Nuclear Newswireans.org
  70. 82General Matter’s NRC license application materials publicly available -- ANS / Nuclear Newswireans.org
  71. 83General Matter walks NRC through Paducah enrichment license filingnuclearnewsnetwork.com
  72. 84South Korea, U.S. Ink Massive Nuclear Energy Plan | Neutron Bytesneutronbytes.com
  73. 85Uranium Enrichment - World Nuclear Associationworld-nuclear.org
  74. 86NRC Federal Register Notices – 2026 | Nuclear Regulatory Commissionnrc.gov
  75. 87Current Uranium Prices: Spot, Term and Outlookfarmonaut.com
  76. 88Record Contract Prices Put America’s Domestic Uranium Gap Back in Focusbnnbloomberg.ca
  77. 89Record Contract Prices Put America’s Domestic Uranium Gap Back in Focus - The Globe and Mailtheglobeandmail.com
  78. 90Cameco’s Uranium Earnings Fell Nearly 40% in Q2 Despite 18% Higher Prices. Here’s Where the Stock Could Go by 2030 | TIKR.comtikr.com
  79. 91Long-Term Uranium Price Hit All-Time High In August, Says Sprottnucnet.org
  80. 92Russia's Nuclear Fuel Cycle - World Nuclear Associationworld-nuclear.org
  81. 93Breakwise — Written down before · a research demobreakwise.io
  82. 94The global uranium market is splitting in two - The Oregon Grouptheoregongroup.com
  83. 95Did Trump Lift Russia Sanctions? What the October 16 Waiver Changesdiplomacyandlaw.com
  84. 96Lindsey Graham Act Expands U.S. Sanctions and Tariff ...debevoise.com
  85. 97Russian Uranium Ban Waiver Guidance | Department of Energyenergy.gov
  86. 98Nuclear Fuel Market to reach US$72.24bn - Visiongainvisiongain.com
  87. 99US Uranium Supply Chain Map & List | Mining, Conversion, Enrichment, Fabrication & Storage (2026)usnuclearpowerplants.com
  88. 100モジュール化原子力 2026–2040 中国・米国・EU・日本・韓国 5極 Closed-Loop 比較 | ODINマーケティング&コンサルティングodintw.com
  89. 101Energy companies and programs: status and news · The Techno Optimisttechnooptimist.io
目录
  1. 011. Key takeaways from the month
  2. 022. SMR project progress
  3. 033. Technology companies and nuclear power
  4. 044. National policies
  5. 055. Fuel and supply chain
  6. 066. Timelines and risks
  7. 077. References

1. Key takeaways from the month

Between Sep 24 and Oct 23, 2026, nuclear news was about permits, power contracts and fuel prices more than about plants producing electricity. One US construction permit was issued, technology companies paid for uprates at operating plants, rule changes were finalised, and term uranium passed its 2007 peak. Four conclusions explain the month; each points to the chapter that supports it, with every status judged against Oct 24, 2026.

1. A permit was issued, but nobody has committed to build. The NRC issued TVA a construction permit for Clinch River Unit 1 (a 300 MWe BWRX-300) on Sep 29, the first US permit for the design. TVA's board has not approved a final build commitment, no start date exists, and the 2032 operating target was not reaffirmed. Of the BWRX-300 projects only Darlington in Ontario is under construction, with grid connection targeted by end-2030. At Kemmerer, TerraPower is replacing Bechtel as lead contractor while keeping its 2030 completion and 2031 operation targets, three years after the original 2028 plan. [Chapter 2]

2. Technology companies bought uprates and restarts, not new reactors. Google signed a 20-year PPA for 890 MW of uprates at 11 Constellation units on Oct 6, plus 2,700 MW of supply, and Amazon signed for 690 MW from Calvert Cliffs on Sep 30; neither price was disclosed. The new capacity totals 890 + 190 = 1,080 MW, arriving from 2028. The Palisades restart is paused: an irradiated assembly tipped on Aug 30, and the NRC allowed a removal fix on Oct 13. [Chapter 3]

3. Rules are finished faster than money is committed. The NRC approved a final rule on Oct 22 that lets applicants cite test data from DOE- or Department of War-authorised reactors, with review targets of about 18 and 12 months. Part 53 has been in effect since Apr 29, but no Part 53 review is complete and both 2026 construction permits came under Part 50. The month's largest number, up to $120 billion of Korean financing for eight large reactors, is a non-binding framework. [Chapter 4]

4. Fuel is priced ahead of the plants, and new supply comes late. Long-term uranium ended September at $96.50 per lb, above the 2007 peak of $95, while spot was $89.63. DOE awarded $900M task orders to each of Centrus, General Matter and Orano, yet no new Western enrichment capacity runs before 2028. Russia supplied 26% of US enrichment purchases in 2025, and waivers must end by Jan 1, 2028. [Chapter 5]

The dates that follow are mostly procedural: the NRC rule's Federal Register publication, comment deadlines in November and the Cameco Q3 report. See Chapter 6.

1.1 Projects and deals at a glance

Project or deal Party Capacity Milestone Date Status (Oct 24, 2026) Source
Clinch River Unit 1 (Tennessee) TVA; GE Vernova Hitachi; NRC 300 MWe BWRX-300 NRC construction permit issued Sep 29, 2026 Permit issued; no build decision —
Kemmerer Unit 1 (Wyoming) TerraPower 345 MWe (500 MWe with storage) Lead contractor change reported Sep 24, 2026 Under construction; permit Mar 2026 —
Google–Constellation PPA Google; Constellation 890 MW uprates plus 2,700 MW supply 20-year PPA and 15-year supply agreement Oct 6, 2026 Signed; price not disclosed —
Amazon–Constellation PPA Amazon; Constellation 690 MW (Calvert Cliffs) 20-year PPA Sep 30, 2026 Signed; price not disclosed —
Palisades restart (Michigan) Holtec; NRC 800 MW NRC exigent amendment to remove tilted assembly Oct 13, 2026 Delayed; fuel loading paused —
NRC rule on DOE/DoW-authorised designs NRC Review targets 18 / 12 months Final rule approved Oct 22, 2026 Final, not yet in effect —
US–Korea nuclear framework US; Republic of Korea Up to $120B, 8 large reactors Framework announced Sep 30, 2026 Announced, non-binding —
General Matter Paducah General Matter; NRC LEU up to 5%, HALEU up to 20% 40-year licence application Announced Sep 28, 2026 Applied; acceptance review —
Uranium prices Cameco series Term $96.50/lb; spot $89.63/lb Term above 2007 peak Sep 30, 2026 Reported (month-end) —

2. SMR project progress

Chapter 1 summarises the month; this chapter follows the reactors behind it. One US construction permit was issued in the window (Clinch River, Sep 29, 2026); the other projects moved through applications, contractor changes and test criticalities. The table keeps each instrument apart: a construction permit, a design approval, a DOE authorization and an environmental assessment are different things.

2.1 Projects at a glance (as of Oct 24, 2026)

Item Key figure Date Status Source
TVA Clinch River Unit 1 (Tennessee) BWRX-300, 300 MWe; NRC construction permit Sep 29, 2026 Permit issued; no build decision GE Vernova Hitachi; ENR
OPG Darlington Unit 1 (Ontario) BWRX-300, 300 MWe, first of 4; CNSC licence to construct Apr 2025; operating-licence application Mar 2026 Under construction; licence to operate under review GE Vernova Hitachi
Blue Energy, Port of Victoria Unit 1 (Texas) BWRX-300; NRC construction permit application, part 1 Sep 2026; Federal Register Oct 8 Applied GE Vernova Hitachi; NRC
TerraPower Kemmerer Unit 1 (Wyoming) Natrium, 345 MWe (500 MWe with storage); NRC construction permit Mar 2026 Issued; under construction WNA; Innovation Attorney
Kairos Hermes 2 (Tennessee) 2 x 35 MWt, 50 MWe; NRC construction permits Permits Nov 2024; ground broken Apr 17, 2026 Under construction GO-IBR; Innovation Attorney
Dow / X-energy Long Mott (Texas) 4 x 80 MWe Xe-100 = 320 MWe; construction permit application Mar 2025 Under review; no decision reported by Oct 22 WNA; GO-IBR
Holtec Palisades SMR-300 (Michigan) 2 units, capacity not stated; construction permit application, part 1 Dec 2025; Federal Register Oct 8 and 15 Applied WNA; NRC
Oklo Aurora-INL (Idaho) Up to 75 MW; DOE authorization, not an NRC licence DOE PDSA approval, June 2026 Pre-construction approvals ANS; 24/7 Wall St.
NuScale US460 6 x 77 MWe = 462 MWe; NRC standard design approval May 2025 Approved design; no permit GO-IBR; Japanese-language review
Rolls-Royce SMR, ČEZ Temelín (Czechia) 470 MWe; environmental impact assessment filed Date not stated EIA under review, due end-2027 ČEZ (via trade press)
DOE Reactor Pilot Program 4 zero-power criticalities Jun 4 to Jul 4, plus Oklo Groves Aug 5 2026 Critical (test reactors) ANS; Voltgrid

2.2 Clinch River: the one new permit

On Sep 29, 2026 the NRC issued the Tennessee Valley Authority (TVA) a construction permit for Clinch River Unit 1, a 300 MWe GE Vernova Hitachi BWRX-300 near Oak Ridge. It is the first US permit for the design. It is a Part 50 instrument building on TVA's 2019 Early Site Permit, and a separate operating licence is needed before fuel loading.

The permit is not a build decision. According to ENR, TVA says nuclear construction has not begun, no new construction packages or long-lead orders followed, its board must still approve a final commitment, and no start date exists. Board funding is $200 million (2022) + $150 million (Aug 2024) = $350 million, against up to $400 million of DOE cost-shared funding selected in Dec 2025. TVA did not reaffirm its earlier 2032 operating target, and cost-sharing talks were still open.

The filing date conflicts: April 2025 per GE Vernova Hitachi and ETF Database, May 2025 per Power Engineering and the Innovation Attorney. Both give a 14-month review, four months ahead of the 18-month schedule (18 - 4 = 14). April 2025 to Sep 29, 2026 is about 17 months, so the 14 months must run from docketing, which the material does not date. Clocks therefore differ by project:

Permit (NRC, Part 50) Filed Review reported Against the 18-month EO 14300 ceiling Source
Clinch River Unit 1 May 2025 14 months from formal review start 4 months inside Innovation Attorney
Kemmerer Unit 1 Mar 2024 About 24 months 24 - 18 = 6 months over Innovation Attorney
Hermes 2 Not stated Just over 12 months (permits Nov 2024) Inside Innovation Attorney

GO-IBR says Kemmerer's staff review took under 18 months, a different clock (staff review, not filing-to-permit).

The same design advances elsewhere. In Ontario, the Canadian regulator issued Ontario Power Generation (OPG) a licence to construct in April 2025, and OPG applied for the licence to operate Unit 1 in March 2026. Construction Briefing (Oct 12) reports the basemat finished and grid connection targeted by end-2030; aggregator Green Stocks Research says first power 2029. We follow the dated 2030 figure, though neither is an OPG statement. In Texas, Blue Energy filed part one of an NRC permit application for a BWRX-300 in Sep; the Federal Register listed it on Oct 8.

Clinch River turned a regulatory milestone into a permit in hand, but TVA has no build commitment, no start date and no cost figure. Of the BWRX-300 projects, only Darlington is being built.

2.3 Natrium, Hermes, Long Mott and the rest of the queue

TerraPower Natrium, Kemmerer Unit 1. The NRC permit came in March 2026, the first for a commercial non-light-water reactor in over 40 years. The day differs (Mar 4; Mar 9). Nuclear Engineering International (NEI) says April, but Infraday dates TerraPower's announced construction start to Apr 23, which likely explains it. We follow March. The plant is a 345 MWe sodium-cooled reactor with molten-salt storage lifting output to 500 MWe for over five hours, a $4 billion project with up to $2 billion of federal cost share. TerraPower still targets completion in 2030 and operation in 2031, against an original 2028 operating target. That is 2031 - 2028 = 3 years of slip, which NEI attributes to lost commercial HALEU supply.

In the window, NEI reported on Sep 24 that TerraPower is replacing Bechtel as lead contractor after they could not agree terms and pricing for the next phase. Bechtel stays to finish the Sodium Test and Fill Facility enclosure and issued a WARN notice for up to 200 Virginia jobs from November. TerraPower says the schedule is unaffected, and no replacement is named. On Oct 14 Curtiss-Wright said it installed the Stage 1 training simulator. On Oct 15 Bill Gates and officials from three states toured the site; TerraPower says the reactor excavation is about halfway to its 120-foot depth. TerraPower told the NRC on July 22 it plans a Part 50 operating-licence application by March 2028.

Other NRC-track projects.

  • Kairos Hermes 2: ground broken Apr 17, 2026, for a 50 MWe plant supplying TVA and Google data centres; the original plan was about 20 MWe. No window news in the material.
  • Dow / X-energy Long Mott: the NRC aims for an 18.5-month review and no decision had been reported by Oct 22. Docketing and target dates are not in the material.
  • Holtec Palisades SMR-300: Federal Register notices on Oct 8 and 15 cover the two-unit phased application. Full construction waits for the existing unit's restart (see Chapter 3).
  • NuScale: the 77 MWe design has a May 2025 NRC standard design approval, which GO-IBR notes "is not a permit to build". No permit application appears in the material.
  • Rolls-Royce SMR: the 470 MWe design has no construction permit. ČEZ filed its Temelín environmental assessment (date not stated), due to finish by end-2027, with operation in the second half of the 2030s; a UK final investment decision is expected in 2029. A £1.4 billion supplier programme for three UK reactors was reported Oct 12 (UK Wylfa context in Chapter 4).

2.4 DOE pilot programme: criticality is not a plant

DOE authorization is a separate route from an NRC licence; no pilot reactor can be deployed commercially without the NRC. Four reached criticality by the July 4 goal. All are before the window, so context only:

Reactor Design Criticality Source
Antares Mark-0 (INL) Sodium heat-pipe, TRISO Jun 4, 2026 ANS
Valar Ward 250 (Utah) High-temperature gas Jun 18, 2026 ANS
Deployable Energy Unity (INL) 1 MWe gas-cooled Jul 1, 2026 ANS
Aalo-X (INL) 10 MWe sodium-cooled Jul 4, 2026 CTAIO
Oklo Groves (Texas) 15 MWt water-cooled isotope reactor Aug 5, 2026 Voltgrid, via POWER

These were zero-power or very low-power tests; Valar reached 10 kWt on Jun 22. Radiant's 1 MWe Kaleidos missed the deadline. Sources conflict on its fuel loading (Jul 1 at INL; shipped in Aug) but agree no criticality had been reported by mid-Oct. Oklo's Aurora-INL had its preliminary safety analysis approved by DOE; the final analysis, readiness reviews and startup authorization remain. 24/7 Wall St. estimates first power in late 2027 to early 2028. NRC's Oct 22 rule on DOE demonstration data belongs to Chapter 4.

3. Technology companies and nuclear power

Chapter 2 followed reactors from application to permit; this chapter follows the technology-company money that enlarges operating plants and revives closed ones.

3.1 Agreements and restarts at a glance

Item Key figure Date Status (Oct 24, 2026) Source
Google–Constellation PPA 890 MW uprates, 11 units, 20 years; price not disclosed Oct 6, 2026 Signed Constellation
Google–Constellation supply 2,700 MW, existing PJM fleet, 15 years Oct 6, 2026 Signed Constellation
Amazon–Constellation PPA 690 MW, Calvert Cliffs, 20 years; price not disclosed Sep 30, 2026 Signed Constellation
Palisades restart 800 MW; fuel loading paused Aug 30 / Oct 13, 2026 Delayed ANS, mlive
Crane restart 835 MW, Microsoft, 20 years Sep 2024 deal Pending Green Stocks Research
Duke ACE tariff MOUs Amazon, Google, Microsoft, Nucor Date not stated MOUs signed ANS

3.2 Constellation turns two tech contracts into 1,080 MW of uprates

On Sep 30, 2026, Constellation said Amazon had agreed a 20-year PPA for 690 MW from the 1,790 MW Calvert Cliffs plant in Maryland. About 190 MW is a new uprate due between 2030 and 2032, and the deal enables more than $3 billion of investment. The rest is existing output: 690 − 190 = 500 MW. After the uprate the plant is 1,980 MW, so Amazon's share is 690 ÷ 1,980 ≈ 35%. The power still flows to the PJM grid, not to an Amazon data centre, and a separate retail supply agreement covers Amazon's PJM operations. No price or delivery start date was disclosed. Constellation says the contract gives it the revenue certainty to relicense the plant, whose units expire in 2034 and 2036.

On Oct 6, 2026, Google and Constellation announced a 20-year PPA for 890 MW of new capacity from uprates at 11 Constellation-owned units in Illinois, Pennsylvania and New Jersey, backed by more than $4.3 billion of Constellation investment. Constellation puts the first uprate at 2028; Google's blog, via POWER, says all 890 MW will be online before the end of 2032. We read these as first unit and last unit, not a conflict. A second contract, a 15-year supply agreement for 2,700 MW of the existing PJM fleet, keeps those plants economic without removing them from the grid. Google therefore has 890 + 2,700 = 3,590 MW under contract.

Price is undisclosed for both deals. CEO Joe Dominguez, quoted via the New York Times, says such projects "require a different price point than the market trades at". Dividing $4.3 billion by 890 MW gives about $4.8 million per MW (4,300 ÷ 890 = 4.83); this is our arithmetic on Constellation's investment, not a contract price. Constellation had not confirmed the sites. ANS reports Braidwood, Byron, LaSalle, Quad Cities, Limerick and Salem.

In this window technology companies paid for 1,080 MW of uprates (890 + 190, POWER's tally) at operating plants, arriving from 2028. The SMR commitments in the same material run to 2032 to 2035.

3.3 Restarts: Palisades is paused, Crane and Duane Arnold are queued

Palisades (Holtec, Michigan, 800 MW). Fuel loading began Aug 30, 2026. mlive reports that an irradiated assembly tipped that day and has blocked loading since, and that Holtec did not disclose it for several weeks. ANS reports Holtec acknowledged the pause by Sep 25, judging it below NRC reporting thresholds. The assembly sits at about 30 degrees, and Holtec says the fuel rods and cladding are intact. Holtec filed a licence amendment request on Sep 30; on Oct 13 the NRC issued a one-time amendment under "exigent circumstances", 13 days later, letting a custom device move the assembly to the spent fuel pool. It must be implemented within 10 days, by Oct 23. The material does not say whether the lift has happened, and the NRC's own review remains open. Holtec did not reaffirm an end-2026 return to service; earlier reports say it is contracted to supply power by March 2027.

Crane (Constellation, Pennsylvania, formerly Three Mile Island 1). Microsoft's 20-year agreement dates from September 2024. Sources give 835 MW and 880 MWe (World Nuclear Association, WNA); we follow 835 MW as the contract figure. Target year is 2027 per Maryland Matters and Meticulous Research and 2027 to 2028 per WNA, which we follow as the wider range. ANS headlines show NRC steps (an environmental assessment on Sep 29 and a hearing notice, date not stated). A $1 billion DOE loan closed in Nov 2025 (Meticulous Research).

Duane Arnold (NextEra, Iowa, 615 MW). Google's 25-year agreement dates from Oct 2025, with restart targeted for early 2029. A DOE loan of up to $1.9 billion was announced Sep 8, 2026, before our window.

3.4 SMR offtake and utility MOUs: mostly commitments

Per WNA, Meta announced up to 6.6 GWe by 2035 in January 2026: 20-year Vistra deals for 2,176 MWe, two TerraPower Natrium units totalling 690 MWe by 2032, and a 1.2 GWe Oklo campus. The itemised parts sum to 2,176 + 690 + 1,200 = 4,066 MW; the remainder is not itemised in the material. One source calls the Oklo deal a prepayment and the TerraPower deal funding plus rights to energy.

Kairos is the only advanced-reactor developer in the material with a utility PPA: up to 50 MWe from Hermes 2 to the TVA grid for Google, announced Aug 18, 2025. According to Tomorrow's World Today, Amazon, X-energy and AEP signed for 12 Xe-100 reactors of 80 MW (12 × 80 = 960 MW) in Indiana, with Amazon funding development and buying the power; the page gives no date or price. Duke's MOUs with Amazon, Google, Microsoft and Nucor propose tariffs to fund new nuclear and storage, not power purchases, with no capacity or date stated.

4. National policies

Chapter 3 followed technology buyers signing for power; this chapter covers the national rules and programmes that decide whether those reactors can be licensed and financed. Status is judged against 2026-10-24.

4.1 Policy at a glance

Item Key figure Date Status Source
NRC rule on DOE/DoW-authorised designs Review targets ~18 / ~12 months Approved Oct 22 Final, not in effect ANS
NRC proposed rule, 91 FR 60702 89 pages Sep 24; comments close Nov 9 Proposed Federal Register
NRC Part 53 $152M net averted cost Effective Apr 29 In effect Innovation Attorney
NRC Part 57 (microreactors) Comments closed Jun 15 Announced Apr 24 Proposed, not final —
AP1000 design certification renewal Renewal and update Oct 14 Approved ANS
US–Korea framework Up to $120B, 8 units Sep 30 Announced, non-binding Neutron Bytes
EIB loan to Steady Energy EUR 40M Reported Oct 14 Announced IIR
Czech Temelín SMR environmental assessment 470 MWe design Date not stated Submitted WNN
China State Council 8 units, >CNY 170B Jul 31 Approved (context) BigGo
India SHANTI Act rules Caps INR 100–3,000 crore Late Aug Draft Yellow Haze; Speyside

Rules arrived on schedule; money is still a framework. The NRC's Oct 22 final rule is dated and firm, while the month's largest number, up to $120 billion of Korean financing, is non-binding.

4.2 United States: the NRC rulebook and federal programmes

On Oct 22, 2026 the NRC finalised a rule letting applicants use analyses and test data from reactors previously authorised by DOE or the Department of War (DoW). It adds §50.43(f) to Part 50 and amends §53.440(a)(1) in Part 53. It is an evidence route, not a licence: nothing in it allows the NRC to forgo independent review. Chairman Ho Nieh set targets of about 18 months for first-of-a-kind and 12 months for nth-of-a-kind reviews.

Sources conflict on timing. The Federal Register public-inspection copy schedules publication for Oct 26; ANS, citing the NRC's rulemaking list, says Oct 28. We follow the Federal Register: Oct 26 + 30 days = Nov 25, 2026 (Oct 28 would give Nov 27).

The wider rulebook is uneven. Part 53 took effect Apr 29, 2026 (published Mar 30, 91 FR 15696), but no Part 53 review is complete, and both 2026 construction permits were issued under Part 50 (see Chapter 2). Part 57 was still unfinalised on Oct 22. On Sep 24 the NRC also proposed "Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight", touching nine parts of 10 CFR; its substance is not in the material. Executive Order 14300 (May 23, 2025) gave 18 months to rewrite the rules: May 23, 2025 + 18 months = Nov 23, 2026. Comments close Nov 9, 14 days earlier, so in our reading that rule cannot be final by then; the chairman has said some rules will land late. On Oct 14 the NRC also approved the AP1000 design certification renewal, which is not a permit to build.

Programme money is mostly conditional. DOE announced on Jun 23 conditional loans of up to $17.5 billion for long-lead equipment for up to 10 AP1000s; WNA counts five two-unit projects, and 5 × 2 = 10 agrees. The Army's Janus programme plans up to $2.2 billion over fiscal 2027–2031.

The US–Korea framework was announced Sep 30, per a GlobeNewswire release. Neutron Bytes, summarising the Commerce Department announcement, reports six AP1000s and two APR1400s on federal sites, $120 billion of Korean funding ($100 billion construction plus $20 billion contingency), a $10 billion advance by year-end, and all eight under construction by 2030. WNA calls it non-binding. No site or utility is named. $100 billion ÷ 8 ≈ $12.5 billion per unit (our arithmetic).

4.3 UK and Europe: finance and regulators lead

The material holds no new UK decision in the window. Born to Engineer reports Arup's appointment by Great British Energy – Nuclear for Wylfa engineering, worth up to £19.5 million (date not stated); three 470 MWe Rolls-Royce SMRs give 3 × 470 = 1,410 MWe, which it also calls "up to 1.5 GWe". WNN expects a final investment decision in 2029. WNA's January projection puts 14,460 MWe of the UK's 24,000 MWe 2050 total (60%) under "government target" with no project attached.

ČEZ submitted the environmental impact assessment for a Rolls-Royce SMR at Temelín, expected to finish by end-2027. ČEZ chose the design in October 2024 for up to 3 GW and holds 20% of Rolls-Royce SMR.

At EU level, the European Investment Bank lent EUR 40 million (US$46 million) to Finland's Steady Energy for the 50 MW heat-only LDR-50, its first SMR investment, reported Oct 14. IIR counts 43 European SMR projects worth US$147 billion. The Commission expects SMRs to add 17–53 GW by 2050 (estimate). CATF says new fission's eligibility under the 2028–2034 EU budget still faces opposition. Fuel policy sits in Chapter 5.

4.4 China, Japan and India

China. A State Council meeting on Jul 31 approved four projects with eight units and over CNY 170 billion, per BigGo. The 15th Five-Year Plan targets 110 GWe by 2030. WNA (Oct 8) shows 65,085 MWe operable plus 39,755 MWe under construction = 104,840 MWe, 5,160 MWe short; the net or gross basis is not stated. BigGo's 135 GW counts approved units, so we follow WNA for status. No new approval falls in the window.

Japan. The material shows no in-window policy event. Context: Chūbu Electric withdrew its Hamaoka 3 and 4 restart application on Sep 14 after a seismic-data scandal.

India. DAE's Jul 23 replies target 100 GWe by 2047 from 8.78 GW: 22 GW by 2031–32, NPCIL adds 32 GW (22 + 32 = 54), others 46 GW. The SHANTI Act's draft rules came out in late August and the foreign-investment policy awaits finalisation. Operator liability caps run from INR 100 crore to INR 3,000 crore by reactor size, though the source's bands overlap at 50–150 MW. The draft drops supplier liability under Section 17(b).

The pattern: the US has finished rulebooks and unfunded frameworks, Europe has finance, and India's rulebook is still draft.

5. Fuel and supply chain

Chapter 4 covered the rules that decide which reactors can be licensed; this chapter covers the fuel they will burn, which this month was priced and financed well ahead of the plants it will serve.

5.1 Fuel and supply chain at a glance

Item Key figure Date Status Source
U3O8 spot $89.63/lb Sep 30, 2026 Reported (month-end average) Cameco via Farmonaut
U3O8 long-term (term) $96.50/lb, above the 2007 peak of $95 Sep 30, 2026 Reported (month-end average) Cameco figures, via a GlobeNewswire commentary
General Matter Paducah enrichment licence 40-year licence, 10 CFR Parts 40 and 70; LEU up to 5%, HALEU up to 20% Dated Sep 27, announced Sep 28, 2026 Applied; NRC acceptance review NNN
Centrus buys Westerman about $116M Oct 19, 2026 Announced Credence Research
Centrus DOE Piketon task order $900M base, up to $1.07B with options Awarded Jan 6; contract signed Jul 1, 2026 Signed Credence; Kalkine
Westinghouse LEU+ fuel plant $1B, fuel up to 8% U-235, Columbia, S.C. Oct 23, 2026 Announced ANS
Orano Oak Ridge (Project Ike) $900M DOE award; NRC 12-month review target Jan 2026 Under review WNA; NNN
Russian LEU imports Waivers must end by Jan 1, 2028 Ban in effect since Aug 11, 2024 In effect DOE; Oregon Group

5.2 Uranium prices: term is above its old peak, spot is not

Uranium has no exchange, so every public price is an average of broker quotes. Cameco's month-end series (UxC and TradeTech averages) puts the long-term price at $96.50/lb U3O8 at the end of August and of September 2026, the highest nominal month-end in Cameco data back to 1996. The spot price ended September at $89.63. Sprott's update for August, a month earlier, had spot at $89.54 and TradeTech at $89.75, so spot has been flat near $90 for two months. Trading Economics showed about $90 on Oct 14, but derives it from a contract for difference, so it is an estimate, not a settlement. No October month-end print is in the material.

Cameco month-end (via Farmonaut) Spot, $/lb Term, $/lb
Sep 2025 82.63 83.00
Jan 2026 94.28 89.00
Sep 2026 89.63 96.50

Term minus spot is 96.50 − 89.63 = $6.87/lb, a 7.7% premium. Term is up 96.50 − 83.00 = $13.50 (+16%) on a year earlier. Spot is still below its current-cycle peak of $107 and its 2007 high of $136 (Sprott via NucNet).

The headline does not reach the P&L quickly. Cameco's Q2 realised price was $67.79/lb (+18% year on year), or 67.79 ÷ 96.50 = 70% of the term price. Kazatomprom's H1 2026 realised price was $67.88 against an average month-end spot of $86.83. US utilities paid $58.46/lb on 2025 deliveries (EIA): 87% of volume came under term contracts at $55.91 and 13% at spot-contract prices of $76.01, and 0.87 × 55.91 + 0.13 × 76.01 ≈ 58.5 checks. Cameco's president said market-related contracts now carry floors "in the high 70s escalated" and ceilings "160 escalated" (call of Jul 31). Cameco reports Q3 on Oct 30, which is still ahead.

5.3 Enrichment and HALEU: DOE money, but first output is 2028 or later

The big picture is concentration. By WNA's table Rosatom holds 29,133 thousand SWU/yr of 68,076 in 2025, or 29,133 ÷ 68,076 = 43%.

Capacity, thousand SWU/yr (WNA) 2025 2030
Rosatom 29,133 29,810
Urenco 17,300 18,000
CNNC (assumed) 13,789 18,230
Orano 7,500 10,000
World total 68,076 77,784

DOE awarded $900M task orders to each of Centrus, General Matter and Orano in January 2026. Centrus reported Q2 revenue of $176.1M (+14%) and a $4.5B backlog against $3.8B at year-end 2025 (+$0.7B, +18%) on Aug 6, before the window. In the window it announced the Westerman purchase on Oct 19: about $95M cash plus $21M equity, 95 + 21 = $116M. Westerman builds centrifuge casings, and Centrus says the first new centrifuges go online in Ohio in 2029 (according to Credence Research). A $500M public offering priced in September, per Breakwise quoting Centrus's 8-K title. The older HALEU Operation Contract was extended only to Sep 30 for $15.0M of maintenance and storage; DOE said it does not intend further options and the FY2027 budget has no funds. The material does not say what happened after Sep 30. Demand is firm: X-energy signed in August, Radiant and Antares in September, Oklo a June letter of intent, and Piketon has produced more than 1,900 kg of HALEU.

General Matter applied to the NRC for a Paducah licence. NRC staff were walked through it in closed sessions scheduled for Oct 14–15, and the NRC is deciding whether to accept it for review. Two caveats matter. First, this is a core licence; a HALEU amendment is planned for next year. Second, the enrichment technology is redacted as a trade secret. The site is "100 acres" in the company's 2025 lease announcement and about 107 acres in the application; we follow the application. General Matter asked the NRC to act on a pre-licence foundation exemption by Nov 6. Global Laser Enrichment applied in July 2025, was accepted by the NRC (per Visiongain), and its output is committed to Cameco under an exclusive offtake. Both Paducah firms target production by 2030. Orano is adding 2.5M SWU at Tricastin, with first modules in 2028 and full commissioning in 2030. Urenco broke ground in August on a 2.1M SWU expansion at Eunice, New Mexico, to exceed 7M SWU by 2036.

Fuel is now the best-funded link in the chain, yet no new Western enrichment capacity runs before 2028, and the Russian waiver window closes on Jan 1, 2028.

5.4 Russian supply, conversion and fabrication

The Prohibiting Russian Uranium Imports Act took effect on Aug 11, 2024, with DOE able to grant waivers. Russia still supplied 26% of the enrichment services bought by US operators in 2025, up from about 20%, and waivers must end by Jan 1, 2028. Visiongain adds that the UK banned Russian uranium from May 2026. Centrus names Russian restrictions on its TENEX supply as a significant risk. The Oct 16 waiver of tariffs under the Graham Act concerns sanctions tariffs; the material does not link it to the LEU ban, so we treat the ban as unchanged.

Conversion is thin. Honeywell's Metropolis Works is the only US commercial converter (site page updated Jul 28). NANO Nuclear agreed on Oct 1 to buy deconversion assets in New Mexico for $9.5M cash plus $4.0M stock, or $13.5M in total, subject to NRC consent. The material has no SWU or conversion price.

Fabrication is moving. Westinghouse announced a $1B LEU+ plant on Oct 23. TRISO-X finished the structure of its Oak Ridge TX-1 plant in September, sized for up to 11 Xe-100 reactors. The NRC approved Framatome TRISO fabrication at Richland in June.

6. Timelines and risks

Chapters 2 to 5 followed projects, contracts, rules and fuel; this chapter turns them into expected timelines, risks and a dated watch-list. It uses only facts from those chapters and describes dated events, not forecasts.

6.1 Expected timelines and where they can slip

Most targets in the material sit between 2027 and 2031. Crane is targeted for 2027 to 2028 and Duane Arnold for early 2029. The first Constellation uprate comes in 2028, with all 890 MW online before the end of 2032. Kemmerer targets completion in 2030 and operation in 2031, Darlington grid connection by end-2030, and a UK final investment decision for Rolls-Royce SMR is expected in 2029. Meta's two Natrium units are due by 2032.

Schedule. TVA has no start date and did not reaffirm its 2032 target. Kemmerer already slipped from 2028 to 2031, and TerraPower says the Bechtel change does not alter the schedule. Holtec did not reaffirm an end-2026 return to service at Palisades, while earlier reports say it is contracted to supply power by March 2027.

Cost. TVA's board has committed $350M against up to $400M of DOE cost sharing, and no total cost is given. Constellation's $4.3 billion for 890 MW works out to about $4.8 million per MW, our arithmetic, not a contract price.

Fuel. Kemmerer's slip is attributed to lost commercial HALEU supply, the HALEU Operation Contract was extended only to Sep 30, and Russia supplied 26% of US enrichment purchases before waivers end on Jan 1, 2028.

Regulation. No Part 53 review is complete. Kemmerer's permit took about 24 months against Clinch River's 14, and the NRC's own proposed rule would not be final by the Nov 23 deadline in our reading.

Public. The material holds no polling. The one trust signal is mlive's report that Holtec did not disclose the Palisades incident for several weeks.

Permits, rules and contracts arrived on schedule this month, but the plants they enable have no committed start dates; the first dated deliveries are uprates in 2028 and fuel capacity not before 2028.

What comes first. The nearest dated steps are procedural. The Federal Register is scheduled to publish the NRC final rule on Oct 26, which gives an effective date of about Nov 25 (Oct 26 + 30 days); ANS cites Oct 28, which would give Nov 27. Cameco reports Q3 on Oct 30 and General Matter has asked the NRC to act on a foundation exemption by Nov 6. Comments on the NRC's proposed rule close on Nov 9, two weeks before the EO 14300 deadline of Nov 23. For Palisades, the NRC amendment had to be implemented by Oct 23, and the material does not say whether the lift has happened, so that status stays open until a report appears.

Where the evidence is thin. Several items carry no date in the material: the Temelín filing, the Amazon, X-energy and AEP Indiana agreement, and the Duke tariff MOUs. Treat them as announced or reported, not as scheduled. Cost per megawatt, the Nov 23 and Nov 25 dates and the Calvert Cliffs share are our own arithmetic, not source figures.

6.2 What changed and what it means, by reader

Reader What changed Implication Evidence
Utilities Clinch River got its permit on Sep 29, but the board has not approved a build commitment; Calvert Cliffs gains a 190 MW uprate for 2030 to 2032 A permit is not a build decision; a separate operating licence is still required, while uprates are the nearer capacity —
Technology companies Google and Constellation signed 890 MW plus 2,700 MW; Amazon signed 690 MW; prices were not disclosed Near-term power comes from uprates and existing plants, while SMR offtake commitments run to 2032 to 2035 —
Developers The NRC approved a final rule on Oct 22 letting applicants cite DOE and DoW test data; Part 53 has no completed review The rule is an evidence route, not a licence, and independent NRC review remains —
Fuel buyers and suppliers Term uranium rose to $96.50/lb, above the 2007 peak; Centrus bought Westerman for about $116M; General Matter applied for a licence Pricing and financing run ahead of supply, and no new Western enrichment capacity runs before 2028 —
Investors (information only) The Korea framework offers up to $120B for eight units but is non-binding; DOE loans of up to $17.5B are conditional Separate signed contracts from frameworks and conditional loans when reading headlines —

6.3 Key dates

Dates already past on Oct 24, 2026 are marked "In effect"; later dates are "Upcoming".

Date Event State on Oct 24, 2026 Source
Apr 29, 2026 NRC Part 53 takes effect In effect The Innovation Attorney
Sep 29, 2026 NRC issues Clinch River Unit 1 construction permit In effect GE Vernova Hitachi
Sep 30, 2026 Amazon–Constellation 690 MW PPA announced; US–Korea framework announced In effect Constellation; Neutron Bytes
Oct 6, 2026 Google–Constellation 890 MW PPA announced In effect Constellation
Oct 13, 2026 NRC exigent amendment for Palisades assembly removal In effect ANS
Oct 22, 2026 NRC approves final rule on DOE/DoW-authorised designs In effect ANS
Oct 23, 2026 Palisades amendment implementation deadline; Westinghouse $1B plant announced In effect ANS
Oct 26, 2026 Federal Register publication of the NRC final rule (scheduled) Upcoming Federal Register
Oct 30, 2026 Cameco Q3 report Upcoming TIKR
Nov 6, 2026 General Matter asks NRC to act on a foundation exemption Upcoming NNN
Nov 9, 2026 Comments close on NRC proposed rule 91 FR 60702 Upcoming Federal Register
Nov 23, 2026 EO 14300 18-month rule deadline (computed) Upcoming GO-IBR
Nov 25, 2026 NRC final rule effective (computed from Oct 26) Upcoming Federal Register
End-2026 $10B Korean advance contemplated under the framework Upcoming Neutron Bytes
Mar 2027 Holtec reported as contracted to supply Palisades power Upcoming ANS
End-2027 Temelín environmental assessment due to finish Upcoming WNN
Jan 1, 2028 Russian LEU import waivers must end Upcoming Oregon Group
2028 First Constellation uprate; Orano first Tricastin modules Upcoming Constellation; WNA
2030–2031 Kemmerer completion (2030) and operation (2031); Darlington grid connection by end-2030 Upcoming NEI; Construction Briefing

7. References

This document draws on the following 68 sources, listed in the order they are first cited.

  1. Americas | GE Vernova News — gevernova.com
  2. Federal Nuclear Regulator OKs TVA to Build First US Small Modular Reactor | Engineering News-Record — enr.com
  3. Mapped: Who’s building nuclear SMRs? - Construction Briefing — constructionbriefing.com
  4. Bechtel out as Natrium EPC - Nuclear Engineering International — neimagazine.com
  5. Google and Constellation Announce Landmark Agreement to Bring 890 MW of New Nuclear Capacity to PJM Grid as Part of Long-Term Power Deal — constellationenergy.com
  6. Constellation and Amazon Announce 20-Year Power Purchase Agreement Adding 190 Megawatts of Nuclear Capacity at Calvert Cliffs — constellationenergy.com
  7. Google Deal Backs 890 MW of Constellation Nuclear Uprates at 11 PJM Reactors — powermag.com
  8. Incident pauses Palisades fuel loading; plant connected to switchyard -- ANS / Nuclear Newswire — ans.org
  9. NRC allows alternate approach to removing tilted fuel assembly at Palisades -- ANS / Nuclear Newswire — ans.org
  10. Holtec Palisades can try unusual fix to nuclear fuel loading mishap - mlive.com — mlive.com
  11. NRC Finalizes Rule Allowing Reactor Applicants to Use DOE, DOW Demonstration Data — powermag.com
  12. NRC finalizes rule on licensing reactors with prior DOE or DOD authorization -- ANS / Nuclear Newswire — ans.org
  13. Advanced Nuclear Reactor Licensing — theinnovationattorney.substack.com
  14. South Korea, U.S. Ink Massive Nuclear Energy Plan | Neutron Bytes — neutronbytes.com
  15. United States of America - World Nuclear Outlook Report — world-nuclear.org
  16. Current Uranium Prices: Spot, Term and Outlook — farmonaut.com
  17. Record Contract Prices Put America’s Domestic Uranium Gap Back in Focus — bnnbloomberg.ca
  18. Cameco’s Uranium Earnings Fell Nearly 40% in Q2 Despite 18% Higher Prices. Here’s Where the Stock Could Go by 2030 | TIKR.com — tikr.com
  19. Nuclear Fuel Market to reach US$72.24bn - Visiongain — visiongain.com
  20. Uranium Enrichment - World Nuclear Association — world-nuclear.org
  21. The global uranium market is splitting in two - The Oregon Group — theoregongroup.com
  22. 7590-01-P NUCLEAR REGULATORY COMMISSION 10 ... — public-inspection.federalregister.gov
  23. General Matter walks NRC through Paducah enrichment license filing — nuclearnewsnetwork.com
  24. NRC Federal Register Notices – 2026 | Nuclear Regulatory Commission — nrc.gov
  25. NRC SMR Licensing 2026: Part 53 Final, Part 57 Proposed | GO-IBR — go-ibr.com
  26. New Reactors -- ANS / Nuclear Newswire — ans.org
  27. Oklo Could Have a Huge Opportunity as Demand for Advanced Nuclear Energy Grows - 24/7 Wall St. — 247wallst.com
  28. モジュール化原子力 2026–2040 中国・米国・EU・日本・韓国 5極 Closed-Loop 比較 | ODINマーケティング&コンサルティング — odintw.com
  29. Czech SMR environmental impact assessment submitted - World Nuclear News — world-nuclear-news.org
  30. The deadline arrives: Checking in on the Reactor Pilot Program -- ANS / Nuclear Newswire — ans.org
  31. NRC Final Rule Lets Reactor Applicants Cite DOE, DOW Test Data · Voltgrid News — voltgridnews.com
  32. Tennessee Valley Authority gets green light to build first BWRX-300 small modular reactor in the US — power-eng.com
  33. TVA Secures First SMR Construction Permit — etfdb.com
  34. Nuclear Power Stocks List: 68 Nuclear Energy Companies (2026) | GSR — greenstocksresearch.com
  35. Kemmerer Unit 1 — Natrium Demonstration Plant – Infraday | Infrastructure News, Projects & Events — infraday.com
  36. TerraPower CEO Says Kemmerer Nuclear Plant Will Attract Data Centers | Cowboy State Daily — cowboystatedaily.com
  37. Curtiss-Wright Installs Stage 1 Simulator at TerraPower’s Natrium Site in Kemmerer, WY — finance.yahoo.com
  38. Nuclear Microreactors for AI Data Centers (2026) | CTAIO — ctaio.dev
  39. OKLO Advances Regulatory Milestones to Support Nuclear Growth — finance.yahoo.com
  40. Constellation, Amazon Sign 20-Year Calvert Cliffs Nuclear PPA | Green Stocks Research — greenstocksresearch.com
  41. Duke partnering with Amazon, Google, Microsoft, Nucor on energy security -- ANS / Nuclear Newswire — ans.org
  42. Large upgrade planned at Calvert Cliffs after power deal signed with Amazon - Maryland Matters — marylandmatters.org
  43. Google’s 20-Year $4.3 Billion Deal with Constellation to Uprate 11 Reactors  | Neutron Bytes — neutronbytes.com
  44. Nuclear PPAs Market Outlook 2026–2038 | Meticulous Research — meticulousresearch.com
  45. Small Modular Reactor for a Data Centre: What It Takes — scienceshot.com
  46. Amazon Backs 12-Reactor Nuclear Power Plant in the U.S. - Tomorrow's World Today® — tomorrowsworldtoday.com
  47. Federal Register :: Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight — federalregister.gov
  48. Europe Makes its First SMR Investment — industrialinfo.com
  49. Nuclear power sector rallies against the market as global forecasts rise and China's installation peak converges — BigGo Finance — finance.biggo.com
  50. India Nuclear Energy Roadmap 2047: 100 GW Target Explained — yellowhaze.com
  51. India’s nuclear energy ambition: expanding the ambit — speyside-group.com
  52. Small Modular Reactor Wylfa: UK's First SMR Takes Shape | Born to Engineer — borntoengineer.com
  53. United Kingdom - World Nuclear Outlook Report - World Nuclear Association — world-nuclear.org
  54. The EU needs a nuclear fuel strategy before its next reactors are ordered | Tænketanken Europa — thinkeuropa.dk
  55. Advanced Nuclear Energy in Europe – Clean Air Task Force — catf.us
  56. Nuclear Power in China - World Nuclear Association — world-nuclear.org
  57. Japan’s Nuclear Power Plants in 2026 | Nippon.com — nippon.com
  58. Centrus Energy acquires centrifuge supplier Westerman for $116 million — credenceresearch.com
  59. Stock Near 52-Week Low, Centrus Energy (NYSE:LEU) Reports Second Quarter 2026 Results and HALEU Contract Updates — kalkine.com
  60. General Matter’s NRC license application materials publicly available -- ANS / Nuclear Newswire — ans.org
  61. Russian Uranium Ban Waiver Guidance | Department of Energy — energy.gov
  62. Long-Term Uranium Price Hit All-Time High In August, Says Sprott — nucnet.org
  63. Breakwise — Written down before · a research demo — breakwise.io
  64. Top Small Modular Reactor Stocks for 2027: The Boring Reactor Wins — exoswan.com
  65. Panelists talk domestic enrichment expansion at Global 2026 -- ANS / Nuclear Newswire — ans.org
  66. Did Trump Lift Russia Sanctions? What the October 16 Waiver Changes — diplomacyandlaw.com
  67. US Uranium Supply Chain Map & List | Mining, Conversion, Enrichment, Fabrication & Storage (2026) — usnuclearpowerplants.com
  68. Energy companies and programs: status and news · The Techno Optimist — technooptimist.io
互动网页 · 可在框内滚动 新窗口打开 ↗

Generated with Divrite — 本作品由 AI 根据上面的问题生成,可能有错漏,引用前请核对来源。

相关能力

问一个你自己的问题

Divrite 帮你深入调研,核心数字逐条对照来源校验,再做成 PPT、报告或网页。